Report Deep Dives – Page 8
Section-by-section anatomy of each of the 66 planning report types, beyond the basics.
Report Deep Dives articles – page 8
377 articlesSoil resource and grading in an agricultural land assessment
Grades 1, 2 and 3a are protected and 3b is not, and the published provisional maps show grade 3 undivided. Most ALC work on an application exists to settle that one division by field survey.
Screening in an equalities impact assessment
Screening is the decision about whether a full assessment is needed, not a shorter version of one. The duty sits on the council, and that changes how the applicant's document should be written.
Water neutrality evidence in a water supply assessment
Water neutrality means total use in a supply area is no higher after your scheme is occupied than before. The evidence has two halves: a defensible demand calculation and a secured offset.
Servicing and deliveries in a transport statement
Servicing produces more highway objections on small commercial applications than parking does. Here is how to choose the design vehicle, draw the swept paths and handle refuse and delivery hours.
Credit strategy in a BREEAM pre-assessment
A BREEAM pre-assessment credit strategy decides what the planning condition will hold you to. Here is how to set the target rating, handle minimum standards and protect the credits the consented design controls.
The water calculator in a sustainability statement
The 110 litre standard comes from an optional requirement in Part G, applied through a planning condition. The calculation is fittings-based, and the shower is usually what decides it.
Cumulative effects in an environmental statement
The regulations ask for effects in combination with other existing and approved projects. The hard part is deciding which projects count, over what area, and what to do when nobody will give you their data.
The mitigation hierarchy in an ecological appraisal
Reviewers reject mitigation sections for asserting avoidance rather than evidencing it. Here is what each step of the hierarchy has to show, and how to word measures so a case officer can condition them.
Sensitivity testing in a viability appraisal
The residual is a small difference between two large numbers, so small input changes swing it heavily. Sensitivity analysis is how an appraisal shows its working.
Maintenance and adoption in a drainage strategy
Adoption decides the design standard, the materials and the easements. Here is what undertakers and highway authorities take, and how to write the private fallback.
Exceedance flow routing in a drainage strategy
Exceedance routing answers what happens when the drainage system is full. It needs a drawing, defined destinations and a blockage scenario, not a closing paragraph.
Grease and odour control in an extraction statement
The grease and odour section of an extraction statement has to link the cooking process to the filtration stages and the discharge point. Here is what environmental health officers look for.
Site set-up and demolition in a construction management plan
The site set-up and demolition sections describe what neighbours will experience first. Here is what belongs in them, which consents sit outside the planning permission, and how to word commitments an officer can check.
Daylight distribution in a daylight and sunlight report
Daylight distribution measures how far skylight reaches into a room, which the vertical sky component cannot show. Here is how the no sky line is plotted, what governs it and how to report it.
Occupancy accumulation in a parking survey
Counting parked cars is the easy part. Measuring usable kerb space, defining the catchment and choosing survey nights are what make a parking stress result stand up to a highway officer.
Receptor identification in an air quality assessment
A location only counts as a receptor where public exposure matches the averaging period of the objective. Here is how to build, justify and present a receptor schedule that survives review by environmental health.
Climate change allowances in a drainage strategy
Peak rainfall intensity allowances size drainage; peak river flow allowances model flood levels. How to choose the epoch, when to use the upper end figure, how urban creep compounds and what to do when the guidance is reissued.
Residual risk and safe access in a flood risk assessment
Residual risk and safe access are assessed separately from flood probability. How dry access differs from safe access, what the depth and velocity judgement involves, and how to write the section so it can be conditioned.
Finished floor levels in a flood risk assessment
The finished floor level is the main mitigation in most small-scheme Flood Risk Assessments. How to derive the design flood level, apply freeboard, state the figure against a datum, and what to do when raising the floor is impossible.
What a fire statement must cover at Gateway One
The fire statement submitted with a planning application answers a fixed set of planning-stage questions about access, water, layout and external walls. Here is what each section has to say, and who is competent to say it.
Ground parameters inside a Geotechnical Assessment
A characteristic value is a cautious estimate, not an average. How the ground model and parameter table are built, and which parts of the report planning actually needs.
Root protection areas in a BS 5837 tree report
Twelve times the stem diameter, capped at 707 square metres. How that figure shapes a layout, and the questions worth asking your arboriculturist before it does.
The further survey section of an ecological appraisal
The recommendations section of an ecological appraisal sets your programme. What a walkover can and cannot conclude, and which surveys have to happen before the application is decided.
The room schedule inside a daylight report
Officers read a daylight report through its room schedule. Here is how to name rooms, choose targets, record modelling assumptions and report shortfalls so the table can be audited.
Not sure which documents your council will ask for?
Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.
Enter your postcode on PlanScope