Report Deep Dives articles – page 9

377 articles
Report Deep Dives7 min read

Overheating criteria inside a TM59 assessment

A TM59 assessment applies an adaptive comfort test to occupied rooms and a fixed 26 degree test to bedrooms at night. Here is what each measures and where the assumptions decide the outcome.

Read article →
Report Deep Dives7 min read

The four stages of an Energy Statement

An Energy Statement reports the same scheme four times and every figure has to reconcile with the last. Here is what each stage covers and how the residual shortfall is reported.

Read article →
Report Deep Dives7 min read

Survey nights and stress counts in a Parking Survey

Parking stress is the ratio of parked vehicles to usable kerb capacity, and the denominator is where surveys are challenged. Here is how to design and present one that holds up.

Read article →
Report Deep Dives8 min read

Choosing trip rates in a Transport Assessment

Trip rates are agreed before any junction is modelled, and everything downstream inherits them. Here is how to build a site selection a highway officer can reproduce and will accept.

Read article →
Report Deep Dives7 min read

The access chapter of a Design and Access Statement

The access half of a Design and Access Statement is usually reduced to a sentence about level thresholds. Here is what Article 9 of the DMPO 2015 actually asks for, and how to write it so an officer can use it.

Read article →
Report Deep Dives7 min read

Pre-redevelopment audit content for material reuse

A pre-redevelopment audit quantifies what is in the existing buildings and says where each material will go. Here is what to record, when to survey and how the evidence links to a circular economy case.

Read article →
Report Deep Dives7 min read

Health determinants inside a health impact assessment

A health impact assessment only works if the determinants are ones your scheme can actually move. Here is how to screen, choose determinants, build a baseline and report findings for a planning committee.

Read article →
Report Deep Dives6 min read

Access and inclusion in an equalities impact assessment

The assessment is evidence for the decision maker, not a description of your building. How to write the access and inclusion content so it can be quoted.

Read article →
Report Deep Dives6 min read

Utilities capacity evidence for a residential scheme

What a utilities assessment has to prove, how to raise pre-development enquiries that produce usable answers, and why substation land take decides layouts.

Read article →
Report Deep Dives7 min read

Waste storage calculations in a waste management strategy

The bin store sum that planning officers actually check, from generation rates and container volumes to drag distance, vehicle access and the drawings the strategy must cross-refer to.

Read article →
Report Deep Dives6 min read

Evidence for a retail sequential test that survives scrutiny

A sequential test is a documentary audit before it is an argument. Here is how to agree the catchment, show flexibility, and record why each site was discounted.

Read article →
Report Deep Dives6 min read

Sound insulation content for flats above a licensed premises

Measure the pub on its noisiest lawful night, not a quiet one. Here is what the acoustic report must contain, from spectral source data to verification testing.

Read article →
Report Deep Dives6 min read

A Travel Plan a monitoring officer can enforce

Promises to encourage sustainable travel cannot be monitored. Here is how to set baselines, targets, survey methods and remedial measures that an obligation can actually secure.

Read article →
Report Deep Dives6 min read

Structural appraisal content for a barn conversion

Most Class Q refusals on structure come from appraisals that describe condition without answering the question. Here is the evidence that settles it.

Read article →
Report Deep Dives6 min read

Mitigation wording a noise condition can actually secure

A noise condition that names a fan model fails the first time the supplier changes it. Here is wording that sets a measurable limit, a test position and a remedy if verification fails.

Read article →
Report Deep Dives7 min read

What a highway officer reads first in a Transport Statement

Three things decide a highways consultation on a small scheme: the splay, where the trip numbers came from, and the parking count against the adopted standard.

Read article →
Report Deep Dives7 min read

Survey limitations and how to declare them in an ecology report

A thin limitations section reads as evasive. A specific one, which names the constraint and says whether it changes the conclusion, reads as competent.

Read article →
Report Deep Dives7 min read

Photomontage standards in a townscape and visual assessment

A verified view is evidence; an unverified montage is an artist's impression. The difference lies in the camera data, the survey control and the stated viewing distance.

Read article →
Report Deep Dives7 min read

An illustrative greenfield runoff calculation for a small site

Work the greenfield runoff arithmetic for a third of a hectare and you get about 1.5 litres per second. Here is the calculation, the storage volume it implies, and where the local flood authority overrides it.

Read article →
Report Deep Dives7 min read

What an Environment Agency consultee rejects in an FRA

Most Environment Agency objections are about missing information, not unacceptable development. Here is what the officer checks and how to clear a holding objection.

Read article →
Report Deep Dives7 min read

The source characterisation section of an Odour Assessment

A dispersion model can only redistribute what you feed it. Here is how odour sources are identified, quantified and reported so the assessment stands up.

Read article →
Report Deep Dives7 min read

The obtrusive light section of a Lighting Assessment

Obtrusive light limits are set by environmental zone. Here is how to choose the zone, report against the limits and design a scheme that meets them after curfew.

Read article →
Report Deep Dives7 min read

The residual land value section of a viability assessment

Residual land value decides whether a scheme is said to be unviable. Here is how the section is built, which inputs reviewers test, and how to evidence them.

Read article →
Report Deep Dives8 min read

The viewpoint selection section of an LVIA

Choose the viewpoints and you have largely chosen the answer. Here is how the zone of theoretical visibility, viewpoint types and photographic method are handled so a reviewer can retrace every step.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope