Use Classes and Change of Use articles – page 10

266 articles
Use Classes and Change of Use6 min read

Pubs after 2020: why a drinking establishment is sui generis

Drinking establishments sit outside Class E and outside permitted development. Here is what that means for changing a pub, and the evidence councils expect.

Read article →
Use Classes and Change of Use6 min read

Betting shops, payday lenders and the sui generis trap

Taken out of Class A2 in 2015 and left outside Class E in 2020, betting shops sit in a class of their own. Here is what that means for occupiers and landlords.

Read article →
Use Classes and Change of Use6 min read

C3 to C4: small houses in multiple occupation

Two sharers is C3 and three is C4. How the Use Classes Order draws the line, the amenity standards councils apply and what an HMO application has to prove.

Read article →
Use Classes and Change of Use7 min read

Class F1 and F2: learning and local community uses

A village shop, a church hall, a school and a playing field all sit outside Class E, so none of them gets the free movement that makes Class E flexible. Here is what each F class covers.

Read article →
Use Classes and Change of Use7 min read

Class E to a hot food takeaway: why it needs permission

The 2020 Use Classes changes pushed hot food takeaways out of the classes altogether. A Class E restaurant cannot become one without an application, and extraction usually decides the outcome.

Read article →
Use Classes and Change of Use7 min read

Employment land policies that block a change out of B8

Storage and distribution was left out of the 2020 use class reforms, so Class MA and within-class movement are unavailable. Adopted employment land policies then decide the application.

Read article →
Use Classes and Change of Use7 min read

Holiday lets, short term rentals and the use class question

A dwellinghouse is Class C3 and short-term letting is not a separate use class in England. Whether permission is needed depends on intensity, occupancy and character, with a 90-night statutory allowance in Greater London.

Read article →
Use Classes and Change of Use8 min read

Shop to residential: the routes and their limits

Class MA is cheaper and narrower, a full application is slower and more flexible. Which you use depends mostly on whether the building qualifies at all.

Read article →
Use Classes and Change of Use7 min read

Micropubs and taprooms: the sui generis application

Drinking establishments left the use class system in 2020, so every micropub needs a full application. These are decided on noise, hours and the smoking area.

Read article →
Use Classes and Change of Use7 min read

Sui generis after 2020: the full list and what it means

Pubs, takeaways, cinemas and live music venues left the use class system in September 2020. Here is the full sui generis list and what it means for a change of use.

Read article →
Use Classes and Change of Use8 min read

Conditions that survived the 2020 use class reforms

Class E released units that were unconditioned. It released almost nothing that was tied by condition, and that is usually discovered after an offer is made.

Read article →
Use Classes and Change of Use7 min read

Dog day care and grooming: which use class applies

The Use Classes Order says nothing about animals. Working out which activity you actually run, grooming or day care or boarding, decides whether you need permission and what evidence goes with it.

Read article →
Use Classes and Change of Use8 min read

Padel, indoor golf and new leisure uses: E(d) or sui generis

Class E(d) covers indoor sport for visiting members of the public. Outdoor courts, a destination bar or a closed membership can take a padel or simulator venue outside it.

Read article →
Use Classes and Change of Use7 min read

Farm shop: Class E, F2 or sui generis

A farm shop can be ancillary to farming, Class E retail, Class F2 or partly sui generis. The proportion of goods from the holding usually decides which, and conditions police it.

Read article →
Use Classes and Change of Use7 min read

Places of worship in Class F1: the change of use route

Public worship sits in Class F1 alongside schools and public halls. What that means when the building you have found is a shop or a warehouse, and how the application is assessed.

Read article →
Use Classes and Change of Use7 min read

Retail to gym under Class E: what the council still controls

Retail and indoor fitness both sit in Class E, so the use change is free. The plant, extraction, noise, shopfront and old conditions on the unit are a different matter.

Read article →
Use Classes and Change of Use6 min read

Office to nursery: moving from E(g)(i) to E(f)

Moving an office to a day nursery stays inside Class E, so the use change needs no permission. The physical works, the play space and the drop-off arrangements are another matter.

Read article →
Use Classes and Change of Use7 min read

Mixed use and the planning unit: getting the description right

A composite mixed use falls outside every use class, which makes the description of development the only definition of what is permitted. Here is how to identify the unit and draft the wording.

Read article →
Use Classes and Change of Use7 min read

Class Q barn conversion: the tests that decide it

Four questions decide a Class Q prior approval, and all four can be answered before you spend money: qualifying agricultural use, structural suitability, the floorspace limits and the designations.

Read article →
Use Classes and Change of Use7 min read

Article 4 directions on C3 to C4: checking before you buy

Without a direction, converting a house to a small HMO needs no application. With one, it needs permission that a concentration policy may refuse. How to check, and what to do with the answer.

Read article →
Use Classes and Change of Use7 min read

C4 house in multiple occupation or sui generis HMO

Six residents is the dividing line. Below it a house in multiple occupation sits in Class C4 with a permitted change from C3; above it the use is sui generis and needs a full application.

Read article →
Use Classes and Change of Use7 min read

Dark kitchens and delivery only food: the use class

A delivery-only kitchen fits no use class cleanly. Here is why Class E arguments usually fail and what evidence actually decides these applications.

Read article →
Use Classes and Change of Use6 min read

Hot food takeaway or restaurant: where the line falls

The test is whether consumption is mostly on the premises. Get it wrong and a unit loses Class E flexibility permanently and becomes sui generis.

Read article →
Use Classes and Change of Use6 min read

Moving within Class E: the evidence to keep

No application, no decision notice, no record. Build the evidence file at the time of the change, while the documents are to hand and the people who know still work there.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope