Use Classes and Change of Use – Page 9
What each use class covers, what moves freely within Class E and what needs permission.
Use Classes and Change of Use articles – page 9
266 articlesConditions naming a superseded use class and section 73
Class A1 was revoked in 2020, but conditions naming it still operate on the permissions that imposed them. Section 73 is the route out, and the replacement wording decides the outcome.
Serviced apartments, aparthotels and the C1 boundary
The C1 and C3 boundary for serviced apartments is decided on how units are actually occupied. Length of stay, service level, occupancy conditions and the London 90 night rule.
The 280 square metre local shop provision in Class F2
A shop that meets all three limbs of Class F2(a) sits outside Class E and loses its flexibility. How the floorspace, goods and distance conditions are tested.
Protecting a pub: community value and use class
Planning law decides whether a pub may lawfully become something else. Asset of community value listing only buys a community group time to raise the money.
Turning a shop into a hot food takeaway
Hot food takeaways left the use classes in 2020, so every change from a shop needs permission, and the application is decided on the flue route as much as on policy.
Light industrial under E(g)(iii) and the amenity test
The light industrial limb of Class E carries an amenity qualification the other limbs do not. A process that fails it is not in Class E at all, whatever the lease calls it.
Medical use in Class E and the practitioner residence exception
A clinic in a shop unit is a movement within Class E and needs no permission. A consulting room attached to the practitioner's own house is excluded from E(e) and has to be analysed from first principles.
Gyms and fitness studios under Class E(d)
Moving a gym into a Class E unit is not development, but plant, conditions and dropped weights still bite. The checks to run before fit-out starts.
Dark kitchens and delivery only food premises
A dark kitchen has no shopfront and no customers, which leaves its use class open to argument. The application usually turns on odour, plant noise and riders.
Proving a use has been abandoned
A lawful use can be lost through abandonment, leaving a site with no fallback. The four factors, the records that prove continuity, and why a section 191 certificate is worth buying first.
The planning unit and why it decides your change of use
Identify the planning unit wrongly and the whole change of use analysis fails. The three Burdle situations, the physical and functional separation tests, and the evidence that settles it.
Intensification: when doing more of the same needs consent
Intensification only becomes a material change of use where the character of the use changes as a matter of fact and degree. Most businesses are caught by a condition rather than by the use itself.
The planning unit: how councils decide what they assess
The correct planning unit is normally the unit of occupation, unless a smaller area is separate both physically and functionally. Both limbs matter, and applicants routinely argue only the first.
Drive-through units: classification and highway evidence
The drive-through lane is what makes these applications difficult. Classification, queue capacity and the right turn into the site decide most of them.
Self storage: which use class and what councils ask for
Self storage normally falls within Class B8, yet the classification argument is rarely what decides these applications. Servicing, visual impact and how you describe the use matter more.
Care homes and supported housing: C2 or C3
Extra care, supported living and care homes sit somewhere between C2 and C3. The classification is a question of fact, and it changes what the scheme has to pay.
Retail to residential above a shop
Upper floors above a shop are often part of the shop's planning unit rather than separate. That single point decides which application you make.
Offices to laboratories within Class E
Moving from offices to laboratory space is usually a movement within Class E and needs no planning permission. The external plant, the servicing and the containment level are the real questions.
Gyms and studios: Class E(d) and the conditions that follow
The use class question for a gym is usually easy. The dropped barbell is not, because the noise it makes travels through the structure rather than through the air.
Places of worship: use class, capacity and parking evidence
A move from a shop or industrial unit to a place of worship crosses a use class boundary, so permission is needed. The case is usually won or lost on peak attendance parking evidence.
Nurseries and childcare: use class and the practical tests
A day nursery falls within Class E(f), so a move from another Class E use needs no planning application. The conditions, parking evidence and play space are where these schemes are won or lost.
Farm shops: when produce sales become a retail use
There is no statutory percentage that turns a farm gate stall into a shop. This sets out the character test, the permitted development route under Class R, the highway evidence and the conditions councils impose.
When a storage yard stops being B8 and becomes sui generis
Open storage sits comfortably in Class B8 until something is done to the material. Sorting, breaking or processing changes the class, and the Use Classes Order names some yards as sui generis outright.
Light industrial or general industrial: the amenity test
The line between light and general industrial is a hypothetical question about any residential area, not about the street outside your unit. Getting it wrong costs you Class E flexibility.
Not sure which documents your council will ask for?
Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.
Enter your postcode on PlanScope