Which Reports Do I Need articles – page 13

434 articles
Which Reports Do I Need6 min read

Reports needed for a nursery in a former bank unit

Moving a day nursery into a former bank unit rarely needs permission for the change of use itself. The evidence the council will want covers the works, outdoor play space, drop-off and extraction.

Read article →
Which Reports Do I Need6 min read

Reports for a scheme next to a designated wildlife site

Next to a designated site the assessment follows the pathways: land take, hydrology, air quality, recreation, lighting and noise. What to map, survey and submit.

Read article →
Which Reports Do I Need6 min read

Reports for a 1,000 square metre commercial building

A commercial building of 1,000 square metres is major development with no residential units involved. What that changes, and which reports the submission usually needs.

Read article →
Which Reports Do I Need7 min read

What the report pack adds at fifty dwellings

Major status starts at ten dwellings, but fifty is where the highway authority wants a Transport Assessment and the council wants consultation evidence. Here is what gets added, and when to commission it.

Read article →
Which Reports Do I Need6 min read

Reports for a site next to an operational railway

The infrastructure operator's requirements decide the programme more often than the planning application does. Engage before submission, not after permission.

Read article →
Which Reports Do I Need6 min read

Reports needed where a listed building is affected

The statement of significance is the analytical core of a listed building submission. Everything else either establishes the facts it relies on or tests the effect.

Read article →
Which Reports Do I Need6 min read

Reports needed for a site in Flood Zone 3

In Flood Zone 3 the vulnerability classification comes before the document list. It decides whether the exception test applies, or whether the use is ruled out entirely.

Read article →
Which Reports Do I Need7 min read

Reports for a small light industrial or storage unit

For a small workshop or storage unit, the yard drives the report list more than the building does. Here is the pack councils expect, and the order to commission it in.

Read article →
Which Reports Do I Need7 min read

Reports for an HMO conversion in an Article 4 area

An Article 4 direction turns a C3 to C4 change into a full application judged on local standards. The evidence councils expect, and the order to gather it in.

Read article →
Which Reports Do I Need6 min read

Reports for a residential basement excavation

A basement under a house needs ground, movement and flood evidence that ordinary extensions never touch, plus party wall notices outside the planning system.

Read article →
Which Reports Do I Need6 min read

Reports for converting an office to a children's nursery

Offices and day nurseries both sit in Class E, so the change of use is usually free. The evidence comes through the works, the conditions and environmental health.

Read article →
Which Reports Do I Need7 min read

What changes in the report pack at twelve units

At ten dwellings a housing scheme becomes major development. A twelve unit application picks up affordable housing evidence, the full statutory biodiversity metric and a thirteen week clock.

Read article →
Which Reports Do I Need6 min read

Reports for a nine unit scheme on a brownfield site

One unit below the major threshold changes the determination period, the consultees and the affordable housing position. Here is the evidence base a nine dwelling brownfield scheme still has to assemble.

Read article →
Which Reports Do I Need7 min read

Reports for a new house on a backland garden plot

A house on a subdivided garden needs a smaller evidence base than a greenfield plot, but a specific one. Access, trees, drainage and the biodiversity baseline decide what you commission and in what order.

Read article →
Which Reports Do I Need7 min read

Which reports a scheme beside a railway needs

Development beside a live railway brings a second organisation into the process with its own approvals. The noise, vibration, drainage, lighting and construction documents a council and the infrastructure manager expect.

Read article →
Which Reports Do I Need7 min read

Documents for demolition in a conservation area

Since 2013, demolishing an unlisted building in a conservation area needs planning permission for relevant demolition. Here is the evidence bundle councils ask for, from heritage assessment to bat surveys and the demolition method.

Read article →
Which Reports Do I Need6 min read

Which reports riverside flats in Flood Zone 3a need

Dwellings are more vulnerable development, so Flood Zone 3a means the exception test as well as the sequential test. Here is the evidence base, in the order it has to be produced.

Read article →
Which Reports Do I Need6 min read

Report bundle for flats on a former car park

A car park looks like an easy site until the ground investigation comes back. Here is the report bundle a residential scheme on hardstanding usually needs, and the order to commission it in.

Read article →
Which Reports Do I Need6 min read

Documents a dental or medical practice in a shop needs

A move from retail to a dental surgery or GP practice is normally a change within Class E, so no permission is needed for the use itself. The plant, extraction, shopfront and servicing are a different matter.

Read article →
Which Reports Do I Need6 min read

Reports for an electric vehicle charging hub

A standalone charging hub is a sui generis use with a heavy evidence base. Queuing, grid capacity, obtrusive light and transformer noise are the four that decide it.

Read article →
Which Reports Do I Need6 min read

Documents for extending a listed building

An extension to a listed building needs two consents and a far heavier document set than a standard householder application. The significance assessment sets the scope for everything else.

Read article →
Which Reports Do I Need7 min read

Which reports a twelve unit scheme adds

Ten dwellings is the major development threshold. A twelve unit scheme picks up affordable housing policy, lead local flood authority consultation, full biodiversity net gain and a 13 week determination period.

Read article →
Which Reports Do I Need8 min read

Documents for a new nursery in a residential street

Converting a dwellinghouse to a day nursery is a material change of use, and it turns on outdoor play noise and drop-off arrangements. Play noise falls outside BS 4142, which catches out consultants and applicants alike.

Read article →
Which Reports Do I Need7 min read

Which reports an upward extension to a block of flats needs

Part 20 of the GPDO 2015 allows additional storeys on a block of flats through prior approval, but the matters the council may consider are wide enough that the evidence bundle looks like a full application.

Read article →