Which Reports Do I Need articles – page 14

434 articles
Which Reports Do I Need7 min read

Documents for converting a stable block to holiday lets

A stable block is usually in equestrian rather than agricultural use, which rules out the Part 3 shortcuts. Foul drainage evidence and bat survey timing decide most of these applications.

Read article →
Which Reports Do I Need8 min read

What a small HMO application needs in an Article 4 area

Where an Article 4 direction has withdrawn Class L permitted development rights, turning a house into a small HMO needs a full planning application. Here is the evidence councils expect and the order to assemble it in.

Read article →
Which Reports Do I Need6 min read

Reports for a basement under a terraced house

Excavating between two Victorian terraces on shallow footings means evidence on stability, groundwater, surface water and construction traffic, plus a party wall process running alongside.

Read article →
Which Reports Do I Need7 min read

Report bundle for a single dwelling on an infill plot

A single dwelling is a minor application, and the pack is the national validation list plus the council's local list plus whatever the site constraints trigger. Usually six to nine documents.

Read article →
Which Reports Do I Need7 min read

Which documents a Class Q barn conversion needs

Class Q prior approval turns on two things: proving the building qualifies, and answering the narrow list of matters the council may consider. Here is the document pack that does both.

Read article →
Which Reports Do I Need6 min read

Documents for an annexe for a dependent relative

Councils are not assessing whether your annexe is nice. They are assessing whether it is a separate dwelling in disguise, and the drawings decide it.

Read article →
Which Reports Do I Need6 min read

Documents for a loft conversion with a rear dormer

Most rear dormers are permitted development. The ones that are not usually fail on volume, on a conservation area designation, or on a side window nobody obscured.

Read article →
Which Reports Do I Need6 min read

Which reports a single wind turbine planning application needs

A single turbine attracts a tighter but stranger evidence base than most rural schemes. Shadow flicker, radar safeguarding and ETSU noise are the three nobody expects.

Read article →
Which Reports Do I Need6 min read

Which reports a school expansion planning application needs

Expanding an existing school pulls in a narrow set of consultees and a predictable evidence base. Playing field loss, the school run and plant noise decide most of it.

Read article →
Which Reports Do I Need6 min read

Which reports a new livestock building needs

Prior notification stops where a livestock building falls within 400 metres of a protected building. This sets out that limit, ammonia modelling against designated habitats, odour, slurry and access evidence.

Read article →
Which Reports Do I Need6 min read

Which reports a veterinary practice needs

A veterinary practice raises a specific set of planning questions: use class, barking at night, clinical waste storage, anaesthetic extraction and emergency cover. This sets out the reports each one calls for.

Read article →
Which Reports Do I Need6 min read

Which reports padel or tennis courts need

Ball strike noise, light spill and playing field consultation decide most court applications. This sets out the report bundle, the standards each is assessed against, and the conditions to expect.

Read article →
Which Reports Do I Need6 min read

Which reports a microbrewery and taproom need

Brewing is industrial and a taproom is sui generis, so a combined scheme needs evidence on both. This covers trade effluent, boil odour, plant and event noise, servicing and hours.

Read article →
Which Reports Do I Need6 min read

Which reports a dog day care and kennels need

Kennels and dog day care always need planning permission. The application turns on a properly measured barking noise assessment and a workable waste and drainage strategy.

Read article →
Which Reports Do I Need7 min read

Which reports a place of worship conversion needs

Converting a building to a place of worship needs parking evidence taken at peak service times, a noise case that separates amplified sound from arrivals, and a clear capacity figure.

Read article →
Which Reports Do I Need7 min read

Which reports a rooftop extension to flats needs

Upward extensions to blocks of flats sit between Part 20 prior approval and full planning. Here is the evidence base each route needs, and what changes at 18 metres.

Read article →
Which Reports Do I Need7 min read

Which reports an EV charging hub needs

Chargers in an existing car park are often permitted development. A hub with its own transformer is not, and the noise from that transformer decides the application.

Read article →
Which Reports Do I Need7 min read

Which reports a petrol filling station needs

Buried tanks and the groundwater beneath them drive the evidence base for a filling station. What councils and the Environment Agency will ask for, and why.

Read article →
Which Reports Do I Need8 min read

Which reports an equestrian arena and stables need

A private manege and a commercial livery yard need very different evidence. Here is what councils ask for on equestrian applications, and why the private-or-commercial question comes first.

Read article →
Which Reports Do I Need7 min read

Which reports holiday lodges on a farm need

Holiday lodge applications on farms turn on landscape effects, foul drainage and access rather than on the business plan. Here is the evidence each of those requires.

Read article →
Which Reports Do I Need7 min read

Which reports a warehouse extension over 1,000 m2 needs

At 1,000 square metres of new floorspace an industrial extension becomes major development, with a 13 week period and the flood authority as a consultee. Transport and drainage decide most of these applications.

Read article →
Which Reports Do I Need7 min read

Which reports a house to HMO conversion needs

Whether a C3 to C4 HMO conversion needs any application at all depends on the Article 4 position. Where it does, the parking stress survey is usually the document that decides it.

Read article →
Which Reports Do I Need7 min read

Which reports an office to flats conversion needs

A full planning application to convert offices to flats needs internal daylight, noise and contamination evidence that the Class MA prior approval route never reaches. Here is the document list and the order to commission it in.

Read article →
Which Reports Do I Need8 min read

Which reports change at 150 units

Two things change at 150 dwellings: Active Travel England is consulted, and the scheme enters Schedule 2 of the EIA Regulations. Everything else follows from those.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope