Which Reports Do I Need articles – page 8

434 articles
Which Reports Do I Need7 min read

Reports for a dog day care or kennels business

Animal boarding sits outside the Use Classes Order, so a change of use application is the only route. Here is the evidence a council will look for, and where barking noise decides the outcome.

Read article →
Which Reports Do I Need6 min read

Reports for converting a church to another use

Once a church stops being used for worship, the exemption that allowed reordering falls away. Add burials, bats and a single tall volume, and the document set grows quickly.

Read article →
Which Reports Do I Need6 min read

Reports for a rainwater and greywater reuse scheme

A tighter optional efficiency standard and water neutrality areas are the two reasons water reaches the planning file. They ask for different evidence, so identify the constraint before sizing a tank.

Read article →
Which Reports Do I Need7 min read

Reports for a padel or tennis court with floodlighting

A court surface can be permitted development; the floodlights and a padel enclosure usually are not. Here is the document set, from obtrusive light limits to the noise of evening play.

Read article →
Which Reports Do I Need7 min read

Reports for a dropped kerb and off-street parking space

A domestic crossover involves two approvals: a section 184 highway application and, where the front garden surfacing falls outside Class F, a householder planning application. The document list is shorter than most people expect.

Read article →
Which Reports Do I Need7 min read

Reports for an industrial extension inside an AQMA

An AQMA adds an air quality assessment, dust controls and lorry routing evidence to the usual industrial pack. Here is what a council will expect and where applications in these areas tend to fail.

Read article →
Which Reports Do I Need8 min read

Reports for a self-build plot on a serviced site

The site-wide permission normally carries the ecology, flood risk and transport evidence. What is left is a design code compliance case and two exemptions that are easy to lose.

Read article →
Which Reports Do I Need7 min read

Which reports an equestrian use in the Green Belt needs

Keeping horses is not agriculture, so none of the shortcuts open to a working farm apply. Here is the report pack a Green Belt equestrian application usually needs, and why the pack is larger than owners expect.

Read article →
Which Reports Do I Need8 min read

Reports for a livestock building on a working farm

A livestock building on a holding of five hectares or more may need only a Part 6 prior notification. The 400 metre rule decides most schemes, and the evidence that follows depends on where the building can sit.

Read article →
Which Reports Do I Need7 min read

Reports for a large HMO of seven or more people

Above six occupants an HMO leaves Class C4 and becomes sui generis, with no permitted development route. Here is the evidence pack a council expects for a large HMO, and the conditions that follow permission.

Read article →
Which Reports Do I Need8 min read

The evidence base for a nine dwelling greenfield scheme

Nine dwellings is the most efficient scale in the English planning system, sitting under several thresholds at once. The surveys are still seasonal, and that is what governs the programme.

Read article →
Which Reports Do I Need8 min read

Documents needed for a Class MA office to flats conversion

Class MA prior approval turns on a short list of prescribed matters, and natural light to habitable rooms is the one that sinks deep office floorplates. Here is the evidence pack that answers each of them.

Read article →
Which Reports Do I Need8 min read

Reports for a single new dwelling in a garden plot

One house in a back garden is a minor full application, not a householder one. These are the documents councils actually ask for, and the two grounds that refuse most of these schemes.

Read article →
Which Reports Do I Need8 min read

Reports needed for half a hectare of greenfield land

Undisturbed ground brings a fuller ecology baseline, surviving archaeology, agricultural land questions and a drainage catchment with no existing system.

Read article →
Which Reports Do I Need8 min read

Reports needed for a scheme adjoining a railway

Noise and ground-borne vibration, the physical relationship with the operator's land, and where surface water goes decide a scheme adjoining an operational railway.

Read article →
Which Reports Do I Need8 min read

Documents for a nursery change of use in a housing street

Two issues decide a nursery application in a residential street: drop-off and collection parking, and noise from outdoor play. Here is the evidence each one needs.

Read article →
Which Reports Do I Need8 min read

Reports needed for housing in Flood Zone 3a

Residential development in Flood Zone 3a engages both the sequential test and the exception test, whatever the scale. Here is the document bundle and the order to produce it in.

Read article →
Which Reports Do I Need7 min read

Reports needed when a transport assessment is triggered

Crossing the transport assessment threshold brings a package of documents, not one report. Here is what travels with it, how each is secured and what belongs in a scoping note to the highway authority.

Read article →
Which Reports Do I Need7 min read

Reports needed for a scheme at the ten unit major threshold

Ten dwellings makes a scheme major development. The determination period, the consultee list, the drainage evidence and the biodiversity route all change at once, and planning for it at nine units is much less expensive.

Read article →
Which Reports Do I Need8 min read

Reports needed for a self-build house on an infill plot

A subdivided garden is greenfield in policy terms, so one house needs more evidence than most self-builders expect. Here is the document bundle, the survey seasons that govern it and the biodiversity exemption worth checking first.

Read article →
Which Reports Do I Need8 min read

Reports needed for a garage conversion to a habitable room

Garage conversions rarely need specialist reports. What they do need is a check on the original estate permission for conditions removing permitted development rights, and a measured parking case if permission is required.

Read article →
Which Reports Do I Need8 min read

Evidence base for a caravan and camping site

A campsite in open countryside is a change of use with a licensing regime attached. Here is the evidence that carries the planning case and the order to do it in.

Read article →
Which Reports Do I Need8 min read

Evidence base for a telecoms mast under Part 16

Prior approval for a mobile mast is decided on siting and appearance alone. Here is the evidence that actually moves a Part 16 application, and the 56 day trap.

Read article →
Which Reports Do I Need6 min read

Evidence base for a petrol filling station redevelopment

A former forecourt is a contamination-led site. This sets out the reports a filling station redevelopment needs, in the order that stops the layout being redrawn twice.

Read article →