Articles – page 106

9456 articles
Which Reports Do I Need6 min read

Planning documents for a scheme on a former landfill

Building on a closed landfill needs a Phase 1 and Phase 2 contamination evidence base, months of gas monitoring and a verified protection design. Here is the pack and the order to produce it in.

Read article →
Report Deep Dives7 min read

Odour assessment benchmarks and offensiveness categories

The offensiveness category chosen in an odour assessment sets the exposure benchmark the modelled results are tested against. Here is how that choice is reasoned and where consultees attack it.

Read article →
Glossary6 min read

Benchmark land value in a viability appraisal

Benchmark land value is the figure a viability appraisal is tested against. It starts from existing use value plus a reasoned premium, and the price paid for the site is not the starting point.

Read article →
Costs, Fees and Budgeting7 min read

Wind tunnel testing: when the cost is unavoidable

What makes a wind tunnel study expensive is doing it twice. Fix the massing before the model is built, and use computational modelling for the design iteration.

Read article →
Residential Scale Thresholds8 min read

Phasing a larger permission: conditions and obligations

Phasing changes almost every condition on the notice. Negotiate the phasing condition first, then work through the schedule against it.

Read article →
Scenario Walkthroughs8 min read

Walkthrough: holiday let in a redundant outbuilding

An illustrative conversion of a redundant cart shed to a holiday unit. Permitted development did not help, and the bat survey season set the programme.

Read article →
Comparisons7 min read

Ownership certificate A or B on the planning form

Certificate A means sole ownership of every square metre inside the red line with no agricultural tenant. A strip of highway verge is enough to make it Certificate B.

Read article →
Refusals and Appeals8 min read

Flood refusals and a failed sequential test

The sequential test asks whether the development could go somewhere at lower risk. A flood risk assessment showing the house will be safe does not answer it.

Read article →
Which Reports Do I Need7 min read

Documents for a district heating energy centre

Flue height is calculated by dispersion modelling, not chosen. Model the plant before the elevations are fixed, or the flue will not be able to rise where it must.

Read article →
Report Deep Dives7 min read

Reading capacity responses in a utilities assessment

The correspondence from each undertaker is the assessment. A positive point of connection offer often hides a reinforcement lead time longer than the permission.

Read article →
Glossary7 min read

Irreplaceable habitat: what it means in planning

Irreplaceable habitat is a defined list, not a judgement. A scheme affecting it cannot be fixed by buying biodiversity units; it either avoids the habitat or fails.

Read article →
Residential Scale Thresholds7 min read

Design codes and the scale at which one applies

Codes do not scale down gracefully. The test is delivery pattern, not unit count: more than one designer, builder or phase is what makes a code worth preparing.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: appeal after non determination

An illustrative major scheme that ran out of determination period. What the appeal statement contained, how the putative reasons narrowed, and the real time saving.

Read article →
Comparisons7 min read

Section 106 or the levy: which pays for what

The levy is arithmetic from a published schedule and effectively non-negotiable. A section 106 obligation is drafted, tested against regulation 122 and viability-tested.

Read article →
Costs, Fees and Budgeting7 min read

Extending the life of a planning permission

Section 73 cannot lengthen a time limit and the extension procedure has gone. The choice is a lawful material operation or a fresh application on current policy.

Read article →
Refusals and Appeals7 min read

Answering an odour refusal: the extraction case

Odour refusals are won on a drawn extraction system. Risk rating, abatement stages, discharge height and a maintenance regime do the work, not policy argument.

Read article →
Which Reports Do I Need7 min read

Documents for a microbrewery with a taproom

Brewing is industrial, a taproom is sui generis, so the application is for a mixed use. Trade effluent, odour and customer noise outside decide the outcome.

Read article →
Report Deep Dives7 min read

Forecast and reconciliation in a site waste plan

The 2008 Regulations were revoked, but conditions and the duty of care keep site waste management plans alive. The forecast and reconciliation are the parts that pay.

Read article →
Glossary7 min read

Critical drainage area: what it means for a site

Critical drainage areas are about surface water and sewers, not rivers. Inside one, even a single infill dwelling in Flood Zone 1 needs an FRA and a drainage strategy.

Read article →
Residential Scale Thresholds7 min read

Play space and child yield by scheme size

Play space requirements follow the child population a scheme generates, not the unit count. Two 60-unit schemes can face requirements differing threefold.

Read article →
Scenario Walkthroughs8 min read

Walkthrough: a scheme amended mid-build

Seven changes arose during construction on an illustrative nine-unit scheme. Four went through section 96A in 24 days; three needed a section 73 and eight weeks.

Read article →
Comparisons7 min read

Arboricultural assessment or landscape appraisal

One measures trees as physical assets with root protection areas. The other judges landscape character and views. A scheme can affect one and not the other.

Read article →
Costs, Fees and Budgeting7 min read

The 30 year cost of a landscape management condition

A management condition is the longest-lived cost on a scheme. Build it up from the prescriptions, price the monitoring events, then discount the whole term to a present value.

Read article →
Refusals and Appeals7 min read

Answering a noise refusal with BS 4142 evidence

Most noise refusals are refusals about evidence. The cure is defensible background monitoring, honest BS 4142 character corrections and a drawn, conditionable attenuation scheme.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope