Articles – page 105

9457 articles
Report Deep Dives7 min read

Appendices that complete a Transport Assessment

Highway engineers read the appendices first. Here is what each appendix of a Transport Assessment has to contain so the capacity results can be audited rather than argued about.

Read article →
Which Reports Do I Need7 min read

Documents for a scheme in a scheduled monument's setting

Development in the setting of a scheduled monument needs a setting assessment, archaeological baseline and agreed visual material. Here is the pack, and who has to be consulted.

Read article →
Glossary7 min read

The Wheatcroft principle on amended plans

Amended plans can be accepted mid-determination only if the change would not deprive consultees of the chance to comment. Here is how that test is applied, and what to do when it is borderline.

Read article →
Costs, Fees and Budgeting6 min read

Transport Assessment cost: what makes one expensive

Surveys, modelling and mitigation drawings make up most of a Transport Assessment fee. Most of the cost is fixed by decisions taken before anyone is appointed.

Read article →
Refusals and Appeals6 min read

Answering a lead local flood authority drainage objection

Drainage objections are technical, so the answer is calculations and evidence rather than policy argument. Often the right move is to offer a tightly drafted condition.

Read article →
Report Deep Dives6 min read

The appraisal inputs section of a viability assessment

A viability conclusion is only as good as its input schedule. Here is what each input needs by way of evidence, and where reviewing surveyors attack.

Read article →
Which Reports Do I Need6 min read

Documents for a vehicle wash on a commercial site

Vehicle washing is sui generis, so it needs permission even on a commercial site. The application turns on where the wash water goes and how loud the equipment is.

Read article →
Residential Scale Thresholds6 min read

Self-build plot provision on larger residential sites

Serviced plot has a statutory meaning, and plots that miss it do not count. Here is the specification, the marketing period, the reversion mechanism and the section 106 drafting.

Read article →
Comparisons6 min read

High hedge complaint or a private nuisance claim

The statutory high hedge scheme only covers evergreen hedges over two metres acting as a barrier to light or access. Everything else is a civil matter or self-help.

Read article →
Costs, Fees and Budgeting6 min read

What drives the cost of an acoustic survey

Engineer time, not equipment, sets the price of an acoustic survey. Here is what each cost driver does and which scoping decisions actually reduce the fee.

Read article →
Refusals and Appeals6 min read

Answering a daylight and sunlight refusal with BRE 209

Daylight refusals are answered with the right measure, a defensible baseline and a contextual argument. BRE targets are advisory and the guidance says so.

Read article →
Which Reports Do I Need7 min read

Documents for a soft play centre in a retail warehouse

Soft play in a retail warehouse is a within-class change on paper and a full application in practice, because unit conditions restrict the use. Here is the evidence the authority will want.

Read article →
Report Deep Dives6 min read

The tree schedule in an arboricultural impact assessment

The tree schedule is the part of an arboricultural impact assessment an officer checks line by line. Here are the BS 5837 fields, the measurement conventions and the errors reviewers find.

Read article →
Glossary6 min read

Veteran tree features and the planning consequences

Veteran status comes from decay and habitat features rather than age. It makes a tree irreplaceable habitat, with a 15 times stem diameter buffer and a very narrow policy test.

Read article →
Residential Scale Thresholds6 min read

Transport Assessment or Statement: where the line falls

The 50 dwelling and 2,500 square metre figures are conventions, not law. Trip generation, the network and the authority's local list decide whether you need a statement or a full assessment.

Read article →
Comparisons6 min read

Class E flexibility or a change of use application

Changes within Class E are not development, so no application is needed. Conditions restricting use, sui generis destinations and Article 4 directions are the three things that close the door.

Read article →
Costs, Fees and Budgeting6 min read

Grampian conditions and the cost of third party land

Grampian conditions move the whole commercial risk of third party land onto the applicant. Here is how the exposure builds, and what to do before consent rather than after.

Read article →
Refusals and Appeals7 min read

Answering a heritage harm refusal with public benefits

Heritage refusals turn on the balance between harm and public benefits. The statutory duties tilt that balance, so benefits have to be specific, quantified and secured.

Read article →
Which Reports Do I Need7 min read

Documents for adding storeys to a block of flats

Adding storeys to an existing block needs structural, daylight, fire and construction logistics evidence. Here is the document set and the order to produce it in.

Read article →
Report Deep Dives6 min read

Limiting factors in an agricultural land classification

Agricultural land classification grades are decided by the worst factor, not an average. Here is how climate, site, wetness and droughtiness each set a ceiling, and what the table must show.

Read article →
Glossary6 min read

Fallback position in planning and the real prospect test

A fallback position argues that refusing the application leads to something else lawful being built instead. The test is a real prospect of implementation, and the weight depends on the evidence.

Read article →
Residential Scale Thresholds6 min read

Refuse, recycling and servicing as unit numbers rise

Refuse provision is set by the collection authority, not national policy. Here is how the container calculation, carry distances and vehicle tracking evidence change as unit numbers climb.

Read article →
Comparisons6 min read

Class Q or Class R for a redundant farm building

Class Q and Class R both let a redundant agricultural building change use without a full application, but the allowed works, floorspace ceilings and prior approval matters differ sharply.

Read article →
Costs, Fees and Budgeting6 min read

Tree works applications are free: what the evidence costs

Applications for consent to work on a protected tree carry no council fee. The spending is the arboricultural report, access and equipment for the works, and evidence if the council refuses.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope