Articles – page 104

9458 articles
Report Deep Dives7 min read

Limitations statements in an ecological appraisal

The limitations section fixes the point at which an ecological appraisal stops being reliable. Written properly it protects the author, gives the council something to condition and tells the applicant which surveys are still to come.

Read article →
Which Reports Do I Need8 min read

Document bundle for a Class Q barn conversion

Class Q prior approval tests six listed matters and a set of hard limits. Here is the evidence that answers each one, and the point at which a full application is the better route.

Read article →
Report Deep Dives7 min read

Writing a non-technical summary that matches the chapters

Most people who read an Environmental Statement read only the non-technical summary. Here is how to write one that covers every topic and survives scrutiny.

Read article →
Which Reports Do I Need7 min read

Document bundle for a rear dormer in a conservation area

A rear dormer in a conservation area always needs permission because Class B is withdrawn. Here is the drawing set and the evidence that gets one approved.

Read article →
Glossary6 min read

Nomination agreement with a registered provider

A nomination agreement decides who moves into affordable rented homes. It is a housing document, not a planning one, and it often sits on the critical path.

Read article →
Costs, Fees and Budgeting7 min read

Measured building surveys for a conversion scheme

A measured survey is priced by detail and access, not floor area. Here is how to specify one so the quotes are comparable and the assumptions list stays short.

Read article →
Report Deep Dives7 min read

Reconciling Environmental Statement chapters that disagree

Chapters written by different firms from different scheme versions contradict each other. Here is the control system that prevents it and the check to run before submission.

Read article →
Which Reports Do I Need7 min read

Documents for a crane oversailing neighbouring land

Oversailing a neighbour's airspace is trespass without a licence. Planning controls the method statement instead. Here is what each document has to carry.

Read article →
Glossary7 min read

Curtilage of a listed building and how it is determined

Curtilage is a question of fact, not a line on a map. Here are the three factors the courts apply, the 1948 test for ancillary structures, and how to get certainty.

Read article →
Residential Scale Thresholds6 min read

Committee or delegated: the scale that triggers referral

Committee referral is set by each council's scheme of delegation, not by national rules. Here are the usual triggers and what a committee date does to your programme.

Read article →
Comparisons6 min read

Larger home extension prior approval or standard limits

The larger home extension route doubles your permitted depth and hands your neighbours a say. Here is how the consultation works and when the standard limits win.

Read article →
Costs, Fees and Budgeting7 min read

Hedgerow removal notices and the cost of getting it wrong

A hedgerow removal notice costs nothing and takes 42 days. Removing an important hedgerow without one is a criminal offence with an unlimited fine and replanting.

Read article →
Report Deep Dives6 min read

What makes a Planning Statement too long

A Planning Statement is too long when the officer stops reading before your conclusion. Here is how to set a proportionate length and what to cut first.

Read article →
Which Reports Do I Need7 min read

Documents for an attenuation pond or balancing lagoon

An attenuation basin needs more than storage calculations. Here is the document set, the reservoir threshold that changes everything, and the adoption questions to ask first.

Read article →
Glossary7 min read

Searching the Historic Environment Record

An HER search is the archaeological baseline for most applications. Here is how to request one, what the records mean, and what the search cannot tell you.

Read article →
Residential Scale Thresholds7 min read

Planning publicity requirements by scheme scale

Whether a council must display a site notice, write to neighbours or advertise in a newspaper depends on the scale and type of development. Here is the rule, and how to check it.

Read article →
Comparisons7 min read

Part 1 Class A or Class AA for more space

Class A gives ground-floor space with no application. Class AA adds a storey but excludes designated land and houses built outside a set window. Here is the comparison.

Read article →
Costs, Fees and Budgeting7 min read

Flood modelling where no model exists for your river

No hydraulic model for your watercourse turns a desk assessment into a commission. Here is the cost structure, the survey traps, and why scoping first saves a rerun.

Read article →
Report Deep Dives6 min read

Figures and plans a Heritage Statement has to carry

A heritage argument is tested on its drawings. Here is the figure set a conservation officer expects, how to grade significance on a plan, and how to key it all together.

Read article →
Which Reports Do I Need7 min read

Documents for a single wind turbine on a farm

A single farm turbine needs full permission and a heavier evidence base than its size suggests. Here is the pack, from EIA screening to the decommissioning commitment.

Read article →
Glossary7 min read

Scheduled monument consent and who decides it

Works to a scheduled monument need consent from the Secretary of State, not the council. Here is what counts as works, where class consents help, and what the pack contains.

Read article →
Residential Scale Thresholds7 min read

Affordable Housing Statement content at ten units

At ten dwellings an Affordable Housing Statement becomes a validation item. Here is the content councils expect, table by table, and the omissions that stall validation.

Read article →
Comparisons7 min read

Nutrient neutrality: on-site mitigation or credits

On-site nutrient mitigation costs less per kilogramme and takes longer. Credits cost more and move faster. Here is how to choose, and what each route has to prove.

Read article →
Costs, Fees and Budgeting7 min read

Bat licence costs: the ecologist's time and the fee

A European protected species licence for bats is priced in ecologist days, not regulator fees. Here is where the money goes, and why a missed survey season costs more than the licence.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope