Articles – page 126

9417 articles
Report Deep Dives6 min read

Infiltration testing appendices in a drainage strategy

The infiltration rate decides whether the rest of the drainage design is possible, and the appendix has to show enough raw data for a reviewer to recalculate it.

Read article →
Which Reports Do I Need7 min read

Which reports a wedding venue in a farm building needs

Councils are generally sympathetic to rural diversification. The refusals come from the detail of how a hundred guests leave a field at midnight, and from the lane they leave along.

Read article →
Professionals and Qualifications7 min read

Who records a building to Historic England levels 1 to 4

The recording level decides who can produce the record. Levels 1 and 2 describe a building; level 3 explains it, which needs someone who can read phasing and produce measured drawings.

Read article →
Commercial Occupiers6 min read

A private hire operator base: a use of its own

An operator licence does not settle the planning position. Article 3(6) keeps taxi and private hire businesses outside the use classes, and parking is what decides most applications.

Read article →
Templates, Checklists and Examples6 min read

Viability appraisal inputs and assumptions: a section outline

Appraisals rarely fail on arithmetic. They fail on the justification for each input, which is why the section order and the evidence attached to it matter.

Read article →
Which Reports Do I Need7 min read

Which reports a rooftop plant enclosure on flats needs

Part 1 permitted development does not apply to flats, so rooftop plant needs permission. Two questions decide it: can the roof carry the load, and what does the plant sound like in the bedrooms below.

Read article →
Report Deep Dives6 min read

Limitations and assumptions sections that protect a report

Reviewers read the limitations section first, because it tells them what the conclusions are worth. Specific, short and uncomfortable in places beats a page of boilerplate.

Read article →
Professionals and Qualifications6 min read

Who verifies remediation once contaminated land work is done

Verification closes the loop on the conceptual site model. The evidence has to be gathered during the works, which is why appointing the verifier late is the main programme risk.

Read article →
Commercial Occupiers6 min read

A car showroom and the use class it sits outside

Article 3(6) of the Use Classes Order keeps vehicle sales outside the classes entirely. That means no Class E flexibility, no prior approval route, and conditions on display and lighting.

Read article →
Templates, Checklists and Examples7 min read

What to submit with a Class MA prior approval application

Prior approval under Class MA is deliberately narrow. Applications fail on an unaddressed prescribed matter or on thin evidence of the two-year Class E use, not on design.

Read article →
Report Deep Dives7 min read

The mitigation schedule and how it becomes conditions

A mitigation schedule consolidates commitments across an environmental statement and maps each one to a condition, an obligation or the approved drawings.

Read article →
Which Reports Do I Need6 min read

Which reports a site in a minerals safeguarding area needs

Mineral and waste safeguarding protects resources and operating facilities from being sealed over or squeezed out. What a council expects in the application, and the exemptions in most plans.

Read article →
Professionals and Qualifications6 min read

Who prepares a viability assessment and who reviews it

A planning viability assessment is an opinion with an audit trail, not a case. Who should write it, which inputs a council reviewer checks first, and how to keep the process short.

Read article →
Commercial Occupiers7 min read

A micro distillery: use class, fire and spirit storage

A micro distillery is general industrial use, and the quantity of spirit held on site brings a fire and dangerous substances regime that planning conditions sit on top of.

Read article →
Templates, Checklists and Examples6 min read

Annual probable sunlight hours: a worked example

Annual probable sunlight hours applies only to windows facing within 90 degrees of due south, and a loss counts as noticeable only when all three BRE limbs are satisfied.

Read article →
Report Deep Dives6 min read

Cumulative effects chapters and how schemes are selected

Cumulative chapters fail on the scheme list rather than the technical work. A tiered selection, a stated cut-off date and a receptor-led synthesis are what make one usable.

Read article →
Which Reports Do I Need7 min read

Which reports a site with a substation or gas governor needs

A substation or gas governor changes the layout before it changes the document set. Who owns it, whether it can stay, and what its presence does to the land around it.

Read article →
Professionals and Qualifications6 min read

Checking a surveyor's competence for a structural report

Protected engineering titles are verifiable on a public register, and the limitations section tells you more about a structural report than the conclusion does.

Read article →
Viability, Obligations and Commercial7 min read

Making the original section 106 bind a section 73 permission

Section 73 creates a fresh permission alongside the original. Whether the planning obligations follow it is a question of how the agreement was drafted, and the fix is usually a supplemental deed.

Read article →
Energy, Sustainability and Carbon7 min read

Carbon reporting in an outline planning application

Outline permission fixes the quantum, not the form. That limits what a carbon assessment can honestly say, and it decides how the commitment should be worded in the condition.

Read article →
Commercial Occupiers6 min read

A dry cleaner: the use class and the solvent permit

Planning and environmental permitting are decided by different teams on different legislation. For a laundry or dry cleaning unit, both have to line up before fit-out starts.

Read article →
Templates, Checklists and Examples7 min read

What a county archaeologist expects with your application

The council's archaeological adviser writes the consultation response your case officer relies on. Here is the evidence they expect, in the form they expect it, and the order to produce it in.

Read article →
Costs, Fees and Budgeting6 min read

Flood risk activity permits: when you need one and the cost

A flood risk activity permit is a separate Environment Agency consent that planning permission does not replace. Which distances trigger it, which exemptions exist and how the charges work.

Read article →
Report Deep Dives7 min read

Requesting an EIA scoping opinion and what to put in it

A scoping opinion fixes what your environmental statement must cover. Regulation 15 sets a short statutory minimum for the request; the useful part is what you choose to add.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope