Articles – page 18

9614 articles
Planning Process7 min read

Predetermination and interests at a planning committee

Members are expected to have views. The line is a closed mind at the point of decision. How predetermination, bias and disclosable pecuniary interests actually work at a planning committee.

Read article →
Council Guides7 min read

Pre-application advice: fees, scope and what it binds

Officer pre-application advice cannot bind the council, but it can scope your technical reports and hand you the local validation list. How fees are banded and how to get value from the meeting.

Read article →
Viability, Obligations and Commercial7 min read

Assuming CIL liability, and what happens if nobody does

The Community Infrastructure Levy falls on the landowner by default. How the assumption of liability form works, what the surcharges cost, and why relief claims depend entirely on sequence.

Read article →
Flood, Drainage and SuDS7 min read

When the flood risk sequential test does not apply

National guidance exempts changes of use from the flood risk sequential test, with an express exception for caravan and camping sites. The exception test, vulnerability classification and flood risk assessment still apply.

Read article →
Heritage and Archaeology7 min read

Historic shop interiors: when fittings are part of the listing

Listing covers the inside of a shop as well as its front, and section 1(5) of the 1990 Act extends it to objects fixed to the building. How to work out what is protected before a fit-out begins.

Read article →
Ecology, BNG and Protected Species7 min read

Otter resting sites and development near rivers

Otters breed year round, so a holt or couch is protected whether or not an animal is present. What a riverside scheme needs to survey, design and condition before it reaches validation.

Read article →
Permitted Development7 min read

Class B roof enlargements and the 50 cubic metre limit

The Class B volume allowance decides most loft conversions: 50 cubic metres for most houses, 40 for a terrace, measured against the original roof space. Here is how the limit and its conditions actually work.

Read article →
Wales, Scotland and Northern Ireland6 min read

Planning appeals in Wales: procedure, deadlines and costs

Planning and Environment Decisions Wales determines appeals on behalf of the Welsh Ministers, allocates the procedure itself, and expects your full case at the point of appeal. A guide for consultants working either side of the border.

Read article →
London7 min read

Fire safety information London boroughs expect at planning

Fire safety in a London application runs on two tracks: London Plan policy D12 for all development, and the national fire statement at Planning Gateway One for relevant buildings. Here is what each asks for and who should write it.

Read article →
Planning Process7 min read

Minded to approve: the gap before your decision notice

A committee resolution to grant subject to a section 106 agreement leaves the application undetermined. Here is what happens between the vote and the decision notice, and how to stop the gap running to months.

Read article →
London6 min read

Office loss and Article 4 directions in the central zone

In the Central Activities Zone and defined office areas, Class MA has been withdrawn. How to confirm whether a building is affected, and what marketing evidence a borough expects.

Read article →
Planning Process6 min read

Site notices, press notices and neighbour letters compared

For major, EIA and departure applications both a site notice and a newspaper advertisement are compulsory. For most householder work the council chooses one method. How to check which was used.

Read article →
Project Type Guides6 min read

Consenting a mooring and residential houseboat berth

A leisure mooring becomes a residential berth at the point the use changes, and two consent regimes then apply. Flood vulnerability, foul drainage and the land-based details that decide applications.

Read article →
Council Guides6 min read

Councillor call-in: how an application reaches committee

Call-in is a creature of the council's constitution, not planning legislation. Who can refer an application, the reasons required, and what it does to the timetable.

Read article →
Council Guides6 min read

Reading an adopted local plan and its saved policies

Section 38(6) requires determination in accordance with the development plan, so you need to know which documents that includes. Saved policies, the policies map and how to cite policy properly.

Read article →
Flood, Drainage and SuDS6 min read

The lead local flood authority as statutory consultee

The lead local flood authority reviews surface water drainage on major applications, not flood zones or sewer connections. What triggers consultation and how holding objections are cleared.

Read article →
Heritage and Archaeology6 min read

Inserted steelwork in a listed building

Listed building consent for inserted steelwork is decided on the loss of plan form and on the bearing detail. How to argue wall significance and specify the intervention.

Read article →
Ecology, BNG and Protected Species6 min read

Hazel dormouse surveys and their long season

The dormouse survey method weights each month of a long season, so a late appointment cannot reach adequate effort. Nut searches, nest tube effort, licensing and clearance timing.

Read article →
Permitted Development7 min read

Livestock buildings and the 400 metre separation distance

Part 6 of the GPDO excludes livestock housing and slurry storage within 400 metres of a protected building's curtilage. What counts, how to measure it, and the route when an application is unavoidable.

Read article →
Wales, Scotland and Northern Ireland6 min read

Northern Ireland: the development management categories

The three Northern Ireland development management categories decide who determines an application, what pre-application consultation is needed and how long it takes.

Read article →
London6 min read

Evidencing no net loss of industrial floorspace in a SIL

No net loss in a Strategic Industrial Location is tested against capacity rather than the sheds standing today. How to measure, evidence and present the floorspace case.

Read article →
Project Type Guides7 min read

Consenting a car wash on a petrol forecourt

Forecourt car wash applications turn on drainage and noise, not on the principle. Use class, queueing analysis, trade effluent consent and the plant specification to commit to.

Read article →
Flood, Drainage and SuDS7 min read

Sequential test for a single infill dwelling

The flood sequential test applies to a single unallocated plot, and the applicant defines the area of search. What evidence an officer accepts and why the test is rejected.

Read article →
Heritage and Archaeology7 min read

Removing cement render from historic walls

Cement render traps moisture in a solid wall, but removal can take the masonry face with it. Trial panels, hand removal, lime specification and the evidence a consent application needs.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope