Articles – page 186

9309 articles
Residential Scale Thresholds7 min read

Obligations and the levy at different scheme sizes

The levy is arithmetic and obligations are argument. Here is how the two divide at each scheme size, where they must not overlap, and what to budget.

Read article →
Templates, Checklists and Examples7 min read

Neighbour engagement before you apply: a short template

Talking to neighbours before you apply removes the objections that come from misunderstanding. Here is the order to do it in, and a letter structure that works.

Read article →
Transport, Highways and Parking7 min read

Travel plan monitoring fees and review triggers

Monitoring fees are lawful but must be built up from real cost. Here is how to test the figure, set targets that can be measured, and cap the remedial obligation.

Read article →
Daylight, Sunlight and Amenity7 min read

Sense of enclosure as a refusal reason

An overbearing impact objection is judged by eye, not by calculation. Here is what the reason alleges, how inspectors weigh it, and the sections that answer it.

Read article →
Constraints and Designations7 min read

Public safety zones at the ends of runways

A public safety zone limits how many people can be present off the end of a runway. Here is how the contours are drawn, what is allowed, and how it differs from safeguarding.

Read article →
Flood, Drainage and SuDS7 min read

Sustainable drainage on a steeply sloping site

On a steep site drainage is about slowing water down. Here is how velocity, terraced storage, infiltration risk and exceedance routing come together.

Read article →
Commercial Occupiers7 min read

Self storage in an industrial building: the use class question

Self storage is normally Class B8, and the real objection is usually job density on employment land. Here is how to answer it, and where ancillary uses cross the line.

Read article →
Residential Scale Thresholds7 min read

Eighteen metres, seven storeys and Planning Gateway One

Reach 18 metres or seven storeys in a residential building and a fire statement becomes a validation requirement. Here is how the tests are measured and what to submit.

Read article →
Templates, Checklists and Examples7 min read

A worked non-material amendment request

Section 96A amendments are decided in 28 days with no appeal if refused. Here is the test officers apply and a worked request for a window alteration.

Read article →
Trees and Arboriculture7 min read

Applying for consent to fell a tree under a TPO

TPO consent applications are free and decided in eight weeks. Here is what the council needs, which reasons work, and what happens if consent is refused.

Read article →
Transport, Highways and Parking7 min read

Parking accumulation surveys and the Lambeth method

A parking stress survey decides whether a scheme with no off-street parking is acceptable. Here is the method, the periods to avoid and how to present the result.

Read article →
Daylight, Sunlight and Amenity7 min read

Justifying a separation distance in a dense context

Separation standards come from local design guidance, not national policy. Here is how to argue the actual relationship on a tight urban site, and what to draw.

Read article →
Constraints and Designations7 min read

Major hazard pipelines and the consultation zones around them

High pressure pipelines and major hazard sites carry consultation zones that can stop a housing layout. Here is how the zones and sensitivity levels combine, and how to check early.

Read article →
Flood, Drainage and SuDS7 min read

Drainage strategy for a single infill plot

On one plot the drainage evidence is a short note, a percolation test and a levels plan. Here is what to include, in the order a case officer reads it.

Read article →
Commercial Occupiers7 min read

Brewery taprooms: Class B2 with ancillary sales

A taproom is lawful without permission only while it stays ancillary to the brewing. Here is how officers judge that, and what an application needs when the line is crossed.

Read article →
Residential Scale Thresholds7 min read

Householder or minor: where the single dwelling line falls

The householder category turns on the property and the kind of work, not the size. Here is where the line falls, and what changes when you land on the wrong side of it.

Read article →
Templates, Checklists and Examples7 min read

A worked planning fee calculation for a mixed submission

Mixed submissions are priced element by element. Here is the build-up method, the unit each fee category uses, and the reductions worth checking before you pay.

Read article →
Refusals and Appeals7 min read

Missing the appeal deadline and what is left

Six months for most refusals, twelve weeks for householder ones, and almost no discretion. Here is what is still available after the date has gone.

Read article →
Templates, Checklists and Examples7 min read

Tree protection plan and method statement: what each contains

One is a drawing, the other is a method. Councils reject submissions that mix them up, and the fencing has to be up before the first machine arrives.

Read article →
Residential Scale Thresholds7 min read

Self-build exemption from the infrastructure levy

The self-build exemption is worth thousands and is lost by paperwork more often than by anything else. The order of the forms is the whole game.

Read article →
Templates, Checklists and Examples7 min read

Written scheme of investigation: what the archaeologist needs

The written scheme is the document that turns an archaeology condition into a programme. Post-excavation and archive deposition are where the cost lands.

Read article →
Heritage and Archaeology7 min read

Registered battlefields and development in their area

A registered battlefield has no separate consent regime and the highest level of policy protection. The evidence sits in the plough soil, not in standing remains.

Read article →
Daylight, Sunlight and Amenity7 min read

Mirror massing as the alternative comparator

A cleared site produces huge percentage losses against an existing baseline. A notional comparator can put that in context, if the assumptions behind it survive scrutiny.

Read article →
Constraints and Designations7 min read

Historic landfill records and sites next door to one

A former tip next door is a ground gas problem rather than a contamination problem. The monitoring takes months, so find out before you exchange.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope