Articles – page 190

9302 articles
Which Reports Do I Need7 min read

Evidence base for a drive-through restaurant

Two issues decide a drive-through: whether the queue stays on site and whether the order point and extract can run without harming amenity. The rest is detail.

Read article →
Trees and Arboriculture7 min read

Crown reduction against felling: what councils approve

The amenity test favours keeping the tree. Most reductions are refused for a vague specification rather than a weak argument, and most felling applications fail on causation.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting the discharge of pre-commencement conditions

Permission is not a start on site. Sort the conditions into three piles, price the ones needing field work, and build the discharge programme backwards from your start date.

Read article →
Transport, Highways and Parking7 min read

Holding directions on the strategic road network

A holding direction removes the council's power to issue a decision. It is usually about evidence rather than principle, which means most are resolved by producing the right assessment.

Read article →
Constraints and Designations7 min read

Reading an article 4 direction map and schedule

The direction, the schedule and the map have to be read together. The council's constraints layer is a guide, not the instrument, and the date it took effect governs everything.

Read article →
Flood, Drainage and SuDS7 min read

Sewer connection rights and capacity refusals

An undertaker cannot refuse a connection simply because its network is busy. It can refuse on two statutory grounds, and it can tell the council to phase your occupation until improvements land.

Read article →
Templates, Checklists and Examples7 min read

Structural survey reporting outline for a conversion

The planning-relevant question is whether the building can take the new loads without being substantially rebuilt. Write the report so that answer is findable and evidenced.

Read article →
Project Type Guides7 min read

Converting an office floor into co-living rooms

Rooms with shared kitchens are not C3 dwellinghouses, so the permitted development route closes and you are making a full application for a use with no class at all.

Read article →
Which Reports Do I Need7 min read

Evidence base for a block of flats over shops

On a mixed use block you are designing residential amenity around a commercial occupier nobody has met yet. The evidence that matters is whatever fixes the operating envelope.

Read article →
Trees and Arboriculture7 min read

Street trees in highway works: pits, soil volume, services

The usual reason a street tree fails is rooting volume. Work back from the mature crown, find somewhere to put 40 or 90 cubic metres of usable soil, then settle the service corridor and the maintenance.

Read article →
Transport, Highways and Parking7 min read

Swept path analysis for a refuse vehicle on a new road

Highway and waste collection officers read the same tracking drawing for different reasons. Here is how to choose the design vehicle, dimension the clearances and present a sheet that can be checked in one round.

Read article →
Constraints and Designations7 min read

Curtilage of a listed building: how far protection reaches

Structures inside the curtilage of a listed building that stood before 1 July 1948 are protected as if listed, even after the land is sold off separately. Here is how the test works.

Read article →
Flood, Drainage and SuDS7 min read

Sequential test for a windfall housing site

A windfall site is unallocated, so nobody applied the sequential test for you at plan-making. This is how to define the area of search and evidence the alternatives an officer will accept.

Read article →
Templates, Checklists and Examples7 min read

Parking survey report outline and its data tables

A parking survey lives or dies on the survey area, the capacity method and the nights chosen. Here is the reporting structure, with the three tables that carry the analysis.

Read article →
Costs, Fees and Budgeting7 min read

Environmental Statement further information and its cost

The consultant's re-drafting fee is the small part. A regulation 25 request brings a fresh 30-day publicity period and often a missed survey season, which is where the money actually goes.

Read article →
Project Type Guides7 min read

Putting up polytunnels on a horticultural holding

Substantial polytunnel blocks are usually building operations under section 55, and one hectare of tunnels is more than twenty times the Part 6 permitted development ceiling. Here is how to apply for them properly.

Read article →
Which Reports Do I Need8 min read

Which reports a self-build dwelling on an infill plot needs

An infill plot sits below every major development threshold, so the evidence base is small. The work is knowing which of the trees, ponds, hedges and old garages on your plot pull in an extra survey.

Read article →
Templates, Checklists and Examples7 min read

Circular Economy Statement outline and the material passport

Two figures drive a Circular Economy Statement, and the commitment runs past determination. A section-by-section outline, from the baseline audit to post-completion reporting.

Read article →
Project Type Guides7 min read

Erecting a grain store under agricultural permitted development

A prior notification is not a planning application. The holding size test, the height and position limits, the 28 day period, and the conditions that attach automatically.

Read article →
Which Reports Do I Need7 min read

Evidence base for a crematorium or burial ground

Both uses fall outside the use classes and both are refused on water or air quality more often than on design. The evidence base, plus a statutory siting rule that catches good sites.

Read article →
Which Reports Do I Need7 min read

Evidence base for a dog day care business in a rural building

Two things decide a dog day care application: barking levels at the nearest dwelling and how the drop-off works on a rural lane. The evidence base, and the licensing regime beside it.

Read article →
Trees and Arboriculture7 min read

Evidencing tree canopy cover targets in a scheme

Meeting a canopy cover target on paper is easy. The calculation that survives review states the assessment age, the species crown spread and the soil volume behind every tree.

Read article →
Transport, Highways and Parking7 min read

Travel plan monitoring: baselines, targets and penalties

Work backwards from enforcement. Decide what happens when a target is missed, then write the baseline trigger, the survey timetable and the measures menu that prove it.

Read article →
Flood, Drainage and SuDS7 min read

SuDS treatment trains for a car park

Attenuation and water quality are separate questions. How to build a treatment train from permeable paving, bioretention and swales, and where a separator actually belongs.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope