Articles – page 197

9256 articles
Comparisons6 min read

Grampian condition or section 106 obligation: choosing

Money means a deed. A physical event that must happen before development proceeds usually means a negatively worded condition. The hard cases are off-site works on land the applicant does not control.

Read article →
Costs, Fees and Budgeting6 min read

Stopping up and diversion order costs on a development

Planning permission does not remove public rights over land. Sections 247 and 257 orders have their own procedure and costs, and an objection that forces an inquiry is the item that wrecks the programme.

Read article →
Planning Process6 min read

How to get an application referred to planning committee

Most English planning applications are decided by officers under a scheme of delegation. Here is how a councillor call-in works, when the window closes and what a committee hearing can and cannot change.

Read article →
Glossary7 min read

Section 70C: when a council can decline to determine

Section 70C of the Town and Country Planning Act 1990 lets an authority decline to determine an application covering matters already alleged in an enforcement notice. The order of events decides whether your planning merits are heard.

Read article →
Refusals and Appeals6 min read

Second applications and second appeals on one site

A refusal is not the end, but a second attempt that looks like the first invites a refusal to determine, a dismissed appeal and a costs award. What has to change, and why.

Read article →
Planning Process6 min read

Re-consultation when amended plans are submitted

Amendments during determination are normal. The limits on how far a scheme can move, and when fresh publicity is required, decide whether the permission is safe.

Read article →
Glossary6 min read

Reserved matters: the five defined in the DMPO

The five reserved matters have statutory definitions, and each one fixes something different. Knowing what each covers decides what an outline permission has actually settled.

Read article →
Neighbours, Objections and Community6 min read

Reading a decision notice as a neighbour

The decision notice, not the officer report, is the enforceable record of what was permitted. The approved plans condition is the part most neighbours never read.

Read article →
AI and Planning7 min read

Where site judgement cannot be drafted in a design statement

A draft can carry the structure, the policy references and the checklist. Context, character and the access arrangements that depend on levels come from looking.

Read article →
Use Classes and Change of Use6 min read

C3 to C4: when a house becomes a small HMO

Three unrelated sharers can move a house from C3 into C4. Whether that needs permission depends on an Article 4 direction, and licensing is a separate question again.

Read article →
Professionals and Qualifications6 min read

Registering under a bat mitigation class licence

Class licensing speeds up low impact bat work, but only for registered consultants, only for listed species and roost types, and only with the record keeping that goes with it.

Read article →
Daylight, Sunlight and Amenity6 min read

Construction period amenity and what conditions control

Building work is temporary, which is why councils control it with conditions rather than refuse permission. Knowing which body handles which complaint saves months of frustration.

Read article →
Energy, Sustainability and Carbon6 min read

The energy hierarchy applied to an existing building

The be lean, be clean, be green sequence assumes a blank site. On an existing building the constraints arrive in a different order, and the energy statement has to say so.

Read article →
Noise, Air, Odour and Light6 min read

Kennels and dog day care: assessing barking noise

Barking is impulsive, unpredictable and loudest at the worst times. Assessing it properly, and offering controls before being asked, is what separates a permission from a refusal.

Read article →
Costs, Fees and Budgeting7 min read

Section 106 deeds of variation and what they cost

Varying a section 106 agreement is rarely difficult in principle and often slow in practice. The delay and the cost usually come from the parties who have to sign, not from the council.

Read article →
Refusals and Appeals6 min read

Citing appeal decisions without overstating them

An appeal decision is evidence of how an inspector approached an issue, not a rule. Using two well-analysed decisions beats listing ten, and overstating one invites a costs application.

Read article →
Planning Process6 min read

Site notices, neighbour letters and the 21 day period

Which applications get a site notice, which get a letter, which get a press notice, and how the 21 day representation period is actually counted.

Read article →
Neighbours, Objections and Community6 min read

Engaging at a developer's pre-application event

A public exhibition run by a developer is not the council's consultation. Here is what to ask on the night, what to take away, and what you still have to do afterwards.

Read article →
AI and Planning6 min read

Explaining an AI-assisted draft to a client or a committee

Sooner or later a client, an officer or an objector asks how a document was produced. A planner who has thought about the answer in advance gives a better one.

Read article →
Use Classes and Change of Use6 min read

F1 and F2: which community uses sit where

The 2020 amendment split the old institutional and assembly classes into F1 and F2. Which side a use lands on decides whether a change needs permission and which policies protect it.

Read article →
Professionals and Qualifications6 min read

Accredited archaeologist grades and what each permits

Curators reject archaeological reports on competence grounds more often than on content. Knowing which accreditation grade covers which document saves a determination period.

Read article →
Daylight, Sunlight and Amenity6 min read

Amenity for the occupiers of the new development itself

Most amenity assessment looks outward at the neighbours. The living conditions of the scheme's own future occupiers are a separate test, and they refuse schemes on their own.

Read article →
Energy, Sustainability and Carbon6 min read

Solar photovoltaics on a pitched roof: what to model

Roof-mounted solar is usually permitted development, but the numbers in an energy statement still have to be defensible. Here is what to model and what to declare.

Read article →
Noise, Air, Odour and Light7 min read

Anaerobic digestion plant noise and odour together

An anaerobic digestion application usually fails on the combination of engine noise and feedstock odour rather than on either alone. Scoping both from the same operational description is what holds it together.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope