Articles – page 196

9257 articles
Costs, Fees and Budgeting6 min read

Hazardous substances consent: the fee and the triggers

Hazardous substances consent is separate from planning permission, with its own fee and decision maker. The trigger is presence at or above a controlled quantity, aggregated across the site.

Read article →
Planning Process6 min read

Statutory consultees and the 21 day response duty

A statutory consultee has 21 days to give a substantive response, and the authority may determine without one. The harder problem is the holding objection that arrives on day 20.

Read article →
Glossary7 min read

Background sound level: how LA90 is determined

The representative background sound level drives every BS 4142 result. This is how LA90,T is measured, how a representative value is chosen, and what a reviewing officer will question.

Read article →
Planning Process6 min read

How to search a site's planning history properly

The statutory register answers questions a survey cannot: removed permitted development rights, live unimplemented permissions and obligations that bind the land. Here is how to search it without missing half the file.

Read article →
Glossary6 min read

Freeboard in a flood risk assessment, explained

Freeboard covers the uncertainty in a modelled flood level rather than adding arbitrary height. Understanding what it is protecting against explains why the figure varies between sites.

Read article →
Costs, Fees and Budgeting6 min read

Sewer connection and infrastructure charges explained

The statutory right to connect does not make capacity available, and none of the undertaker's charges sit inside the planning fee. Start the enquiry before you exchange on the land.

Read article →
Glossary6 min read

Greenfield runoff rate and why it sets the discharge limit

The greenfield runoff rate describes how a site would drain if nothing had been built on it. It sets the discharge ceiling under the national sustainable drainage standards, and the storage volume follows from it.

Read article →
Comparisons6 min read

Temporary permission or personal permission: which

A time limit answers an untested effect. A personal condition answers a use that is only acceptable because of the operator. Choosing the wrong one produces a consent you cannot sell or renew.

Read article →
Costs, Fees and Budgeting6 min read

Bat mitigation class licence costs and registration

A bat mitigation class licence saves weeks at the licensing stage, not at the survey stage. The cost sits in mitigation, supervision and years of monitoring rather than in the licence charge.

Read article →
Planning Process6 min read

When a council refuses to validate your application

An unvalidated application does not exist and no clock is running. Separating national information requirements from local list items is the first step in any validation dispute.

Read article →
Neighbours, Objections and Community6 min read

How to check what a section 106 agreement delivered

Planning obligations are public documents and councils must report on them annually. Reading the triggers before the totals is what turns a general grievance into a specific question.

Read article →
Use Classes and Change of Use6 min read

Class G: adding flats above a shop or office

Class G of Part 3 keeps the commercial ground floor and adds flats above through prior approval. The change of use is permitted, the new door and staircase are not.

Read article →
Professionals and Qualifications6 min read

Appointing an ecological clerk of works on site

Ecological supervision fails when nobody defines it. Settle the trigger list, the competence requirement, the authority to stop work and the reporting outputs in the appointment itself.

Read article →
Daylight, Sunlight and Amenity6 min read

Amenity conditions that cannot be enforced, and why

Amenity conditions fail on precision and enforceability more often than any other kind. Converting a subjective effect into a measurable requirement is what makes them stand up.

Read article →
Energy, Sustainability and Carbon6 min read

Heat pump noise and the assessment planning expects

The permitted development right for a domestic air source heat pump depends on an MCS noise calculation at the neighbour's window. Where the right falls away, expect a BS 4142 assessment instead.

Read article →
Noise, Air, Odour and Light6 min read

Ventilation strategy where windows cannot be opened

Where external noise means windows stay closed at night, ventilation and overheating both have to work without them. One shared assumptions register keeps the acoustic and thermal models describing the same building.

Read article →
Comparisons6 min read

Extension of time or non-determination appeal

Agreeing an extension of time keeps influence with the officer but can displace the fee refund. Appealing non-determination takes the decision away and lets the council write its reasons after seeing yours.

Read article →
Costs, Fees and Budgeting6 min read

Asbestos survey costs before demolition or conversion

The Control of Asbestos Regulations 2012 require an intrusive survey before works disturb the fabric. Ordering the wrong survey type is the mistake that costs a month on a conversion.

Read article →
Planning Process6 min read

Late objections: must a planning officer consider them?

The publicity period fixes the earliest date a council may decide, not the last date for a comment. What changes after it closes is procedure, and how you write matters more than the deadline.

Read article →
Neighbours, Objections and Community6 min read

How to get involved in a neighbourhood plan

A made neighbourhood plan decides applications alongside the local plan. Joining the qualifying body and responding at Regulation 14 gives you far more influence than objecting later.

Read article →
Use Classes and Change of Use6 min read

Places of worship and class F1(f): what it allows

Places of worship sit in class F1(f) of the Use Classes Order. The wording covers connected activity, which is why congregation halls are usually fine and commercial hire often is not.

Read article →
Professionals and Qualifications6 min read

Who is competent to write a GLVIA3 landscape assessment

No statute says who may write a landscape and visual impact assessment. Chartered membership, a transparent method and a viewpoint schedule agreed with the authority are what make the evidence stand up.

Read article →
Daylight, Sunlight and Amenity6 min read

Cooking odour and the flats above a food business

Extraction that discharges above roof level, at sufficient velocity, with filtration matched to the cooking type, is what keeps cooking odour out of the flats upstairs. Retrofits start with the termination, not the filters.

Read article →
Energy, Sustainability and Carbon6 min read

Post-occupancy energy reporting conditions explained

Energy monitoring conditions are easy to accept at committee and hard to discharge years later. The fix is a metering strategy designed around the reporting metrics before the building is built.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope