Articles – page 199

9253 articles
Costs, Fees and Budgeting7 min read

Certificate D planning applications: notices and costs

Certificate D applies where you cannot name any owner of the application land, and it brings a newspaper notice with it. Here are the searches to run first, how the advertisement is priced and how to time publication against validation.

Read article →
Refusals and Appeals7 min read

Why a breach of condition notice cannot be appealed

A breach of condition notice under section 187A of the Town and Country Planning Act 1990 has no appeal route to the Planning Inspectorate. Here is what to do with the 28 day compliance period instead.

Read article →
Planning Process7 min read

Split decisions: approving part of a planning application

Split decisions are lawful in England only where the development is severable in fact. Here is how severability is judged, how conditions are used to exclude elements, and what a partial permission is worth.

Read article →
Neighbours, Objections and Community7 min read

Does your planning objection letter become public?

The substance of a representation is nearly always published. Names usually are, addresses vary by council, and contact details are redacted. Ask before you write, not after.

Read article →
AI and Planning7 min read

Version control when report sections are regenerated

A report assembled from independently produced sections is only consistent if somebody checks it after the last edit. The dependencies that break, and the controls that catch them.

Read article →
Daylight, Sunlight and Amenity7 min read

Amenity impacts of raising a boundary wall or fence

Class A allows 2 metres, or 1 metre next to a vehicular highway, measured from original ground level. Above that, outlook and enclosure usually matter more than measured light loss.

Read article →
Energy, Sustainability and Carbon7 min read

SAP and SBEM outputs a planning officer will ask for

SAP for dwellings, SBEM or a dynamic model for everything else. Which output pages a planning officer expects, and the mismatches that get an energy statement sent back.

Read article →
Noise, Air, Odour and Light7 min read

Vibration effects near a railway at planning stage

For housing beside a railway the reradiated noise criterion usually drives the structural design. How the assessment works, what to measure, and where barriers are useless.

Read article →
Costs, Fees and Budgeting7 min read

What a discharge of conditions programme costs

The discharge programme on a major permission usually costs more than the application fee did. Where the money goes, and why the negotiation happens before the notice is issued.

Read article →
Refusals and Appeals7 min read

Refused for insufficient information: resubmit or appeal

Supplying a missing document to the council is faster and costs less than supplying it to an inspector. The exceptions turn on survey seasons, contested requirements and the cost of a second refusal.

Read article →
Planning Process7 min read

When the case officer changes mid-application

The file survives a reallocation. Undocumented agreements do not. What to write down as you go, what to send a new officer, and when to escalate.

Read article →
Neighbours, Objections and Community7 min read

How neighbours comment on listed building consent

Section 16 requires special regard to preserving the building and its features of special interest. Representations that speak to that duty carry weight; others are recorded and set aside.

Read article →
AI and Planning7 min read

What AI drafts get right, and wrong, in planning reports

A drafting tool knows what a Transport Statement contains. It does not know what the traffic count said. Where the real review time goes on an AI-assisted planning document.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight evidence for a rear dormer in a terrace

A dormer sits high, set back and narrow, so daylight loss to a neighbour is usually negligible. Overlooking is the real issue, except in four recognisable terrace layouts.

Read article →
Energy, Sustainability and Carbon7 min read

Passive cooling features and how officers assess them

A shading strategy that exists only in the thermal model has no planning consequence. What officers look for on elevations and sections, and where passive measures run out.

Read article →
Noise, Air, Odour and Light7 min read

Wind turbine noise assessment for a small rural scheme

ETSU-R-97 and the Institute of Acoustics good practice guide still govern wind turbine noise in England. For a small scheme the simplified route can remove a monitoring campaign entirely.

Read article →
Costs, Fees and Budgeting7 min read

Advertisement consent fees and what signage needs consent

The 2007 advertisement regulations split signs into excluded, deemed consent and express consent. Lighting, listed status and areas of special control decide which group a shop sign falls into.

Read article →
Refusals and Appeals7 min read

How a reason for refusal frames a planning appeal

Article 35 requires clear and precise reasons naming the relevant policies. What that produces varies widely, and the wording decides how much evidence an appeal needs.

Read article →
Planning Process7 min read

Reserved matters submitted in phases on a large site

Access, appearance, landscaping, layout and scale can be approved phase by phase. The section 92 clock, parameter plans and fee per application decide how far you can split them.

Read article →
Neighbours, Objections and Community7 min read

Retrospective planning applications and how to respond

Section 73A lets a council grant permission for development already carried out. The fact that it was built first carries no weight either way, which changes how an objection should be written.

Read article →
AI and Planning7 min read

Using drafted documents to discharge planning conditions

Conditions asking for details, samples and schemes need different submissions. Where AI-assisted drafting helps, where a licensed professional is legally required, and what causes refusals.

Read article →
Daylight, Sunlight and Amenity7 min read

Artificial light spill into bedroom windows

Vertical illuminance at the glass, not brightness at the lamp, is what obtrusive light guidance controls. How zones, curfews and verification conditions fit together.

Read article →
Energy, Sustainability and Carbon7 min read

Air tightness targets claimed at planning stage

Design air permeability is a modelling input. The pressure test measures what was built. What drives the two apart, and how councils now condition as-built evidence.

Read article →
Noise, Air, Odour and Light7 min read

Light nuisance objections: what counts and where to complain

A floodlight shining into a bedroom is usually an environmental health matter, not a planning one. How the two systems divide, what evidence helps, and which conditions actually control light.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope