Articles – page 200

9250 articles
Planning Process7 min read

Correcting an error in a planning decision notice

A council cannot simply withdraw a decision notice it has issued. Section 96A, section 73, the statutory correction power for inspectors' decisions and a fresh application each cover different errors.

Read article →
Refusals and Appeals7 min read

Round table sessions at a planning inquiry

At a round table the inspector asks the questions and advocates step back. It is less adversarial, not less consequential, and it rewards a table of positions rather than a proof to be defended.

Read article →
Planning Process7 min read

Requesting information from a planning file

Most of a planning file is already public and the part you want usually is not. Which regime to use, what councils withhold, and how to frame a request that gets answered.

Read article →
Wales, Scotland and Northern Ireland7 min read

The two tier planning system in Northern Ireland

Eleven councils determine most applications and the Department for Infrastructure takes the regionally significant ones. The category decides the consultation, the decision-maker and the appeal route.

Read article →
Costs, Fees and Budgeting7 min read

What drives the price of a flood risk assessment

The same plot can need a two-page screening statement or a modelled assessment with breach analysis. The cost is set by the data available, not by the size of the scheme.

Read article →
Refusals and Appeals7 min read

Nullity and invalidity of an enforcement notice

A nullity has no legal effect at all. An invalid notice takes effect unless appealed and its errors may be corrected. Knowing which you have decides how the appeal is run.

Read article →
Planning Process7 min read

Unilateral undertakings against bilateral agreements

Both instruments are made under section 106 and both bind successors. The choice turns on whether the council needs to promise anything in return, and on how fast you need the deed completed.

Read article →
AI and Planning7 min read

Editing a drafted heritage statement to match the asset

A drafted heritage statement describes a type of building well and yours poorly. The edit that matters replaces generic description with what is actually there and assesses effect element by element.

Read article →
Daylight, Sunlight and Amenity7 min read

High hedges, trees and light to a neighbouring house

Loss of light to a hedge is a complaint to the council under the Anti-social Behaviour Act 2003. Loss of light to a tree has almost no remedy. Knowing which applies saves a fee and six months.

Read article →
Energy, Sustainability and Carbon7 min read

Peak electrical demand and all-electric heating

All-electric heating replaces a gas connection with a much larger electrical one, and reinforcement sits outside the developer's control. What the application has to show about demand, capacity and phasing.

Read article →
Noise, Air, Odour and Light7 min read

Sports pitch floodlighting and curfew conditions

Floodlighting applications turn on spill and hours. The documents that settle them are an iso-illuminance plot, an aiming schedule and a condition that controls lighting hours, use hours and the timer.

Read article →
Wales, Scotland and Northern Ireland7 min read

Notification of planning applications to Scottish Ministers

Notification bites after a Scottish authority has decided to approve, not before. The categories that trigger it, what happens during the pause, and why withdrawing a statutory objection is the whole game.

Read article →
Refusals and Appeals8 min read

Enforcement appeal grounds (f) and (g) in practice

Grounds (f) and (g) accept the breach and attack what the council demands. They can turn demolition into modification and two months into a year, and section 173(11) may leave you with a permission.

Read article →
Planning Process7 min read

How long a decision notice takes after a committee vote

Planning permission exists only when the decision notice is issued. On a small site with a section 106 agreement that is commonly six to twelve weeks after the vote. Here is what is happening and what you can influence.

Read article →
AI and Planning8 min read

Why drafts over-cite national policy and miss the local plan

The development plan decides the application and the Framework is a material consideration. Why automated drafting inverts that, and the ten-minute correction that puts local policy back at the front.

Read article →
Daylight, Sunlight and Amenity8 min read

Privacy and overlooking distances between dwellings

England has no national separation distance. The 21 metre figure comes from local design guidance, and knowing that tells you when it can be argued with and what evidence a departure needs.

Read article →
Energy, Sustainability and Carbon8 min read

Roof space competition: plant, solar panels and green roof

Policy asks a flat roof to carry plant, panels, greening and attenuation as though the others were not there. How to allocate the area, what biosolar needs, and how to condition it without freezing the plant.

Read article →
Noise, Air, Odour and Light8 min read

EV charging as air quality mitigation in planning

Most charge points offered as air quality mitigation are already required by Part S. What the baseline is, how to specify passive provision that works, and where charging sits in the mitigation hierarchy.

Read article →
Wales, Scotland and Northern Ireland7 min read

The hierarchy of developments in Scotland explained

In Scotland the development category decides whether you must consult the community twelve weeks before applying, how long determination takes and where an appeal goes. Here is how to work out which category applies.

Read article →
Refusals and Appeals8 min read

Enforcement appeal ground (d) and immunity periods

Ground (d) says the breach was already immune when the notice was issued. The time limits have changed, the transitional line depends on when the breach arose, and the burden of proving continuity is yours.

Read article →
Planning Process8 min read

Conditions added at committee and how they get drafted

A condition proposed from the floor carries the same force as one drafted in the officer report, with none of the scrutiny. What officers may change under delegation, and the four routes to fixing a bad condition.

Read article →
Neighbours, Objections and Community7 min read

When must a council tell you about a neighbour's plans

For a householder application the council can choose a site notice instead of writing to you, and that is lawful. Here is what article 15 requires, who counts as adjoining, and how to act if the publicity failed.

Read article →
AI and Planning8 min read

The public datasets behind automatic constraint checks

Automated constraint screening is only as good as the datasets behind it. What each national layer records, the gaps that matter on a real site, and the checks that close them.

Read article →
Energy, Sustainability and Carbon8 min read

Data centre heat recovery into a district heat network

Heat offtake is the benefit most likely to win support for a data centre, and the one most often asserted without evidence. What the application has to show about temperature, route, plant and the offtake agreement.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope