Articles – page 210

9233 articles
Scenario Walkthroughs7 min read

A listed place of worship reordering, start to finish

An illustrative reordering of a Grade II church, from the first list of wants to the conditions on the consent, including whether the ecclesiastical exemption applied.

Read article →
Templates, Checklists and Examples7 min read

The first month after planning permission: what to do

Permission granted is not permission usable. Work through the decision notice, the conditions triggers, the CIL forms and the material start before the digger arrives.

Read article →
Glossary8 min read

Twin tracking planning applications: when it works

Running a duplicate application alongside an appeal can buy negotiating room. It can also cost you the free resubmission and invite a refusal to determine.

Read article →
Permitted Development8 min read

Class Q barn conversions: qualifying date and limits

Class Q starts with a date. If the building was not in agricultural use on the qualifying date, nothing you do to it afterwards brings it within the class.

Read article →
Residential Scale Thresholds7 min read

How planning fees escalate with unit numbers

Planning fees are charged per dwelling up to 50 units, then on a different basis. Here is the structure, the indexation and the fees people forget.

Read article →
Scenario Walkthroughs7 min read

A self build plot where drainage decided the layout

Three trial pits in February moved the house four metres, reshaped the drive and cost seven weeks. An illustrative walkthrough of drainage setting a layout.

Read article →
Templates, Checklists and Examples7 min read

A neighbour consultation letter before you submit

A letter a fortnight before submission gives neighbours the information first and gives you their concerns while the drawings can still move.

Read article →
Ecology, BNG and Protected Species8 min read

Nesting bird checks before vegetation clearance

There is no development exemption for destroying an active nest. The pre-clearance check, and its written record, is what stands between clearance and an offence.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight targets for new rooms and how they are tested

Daylight inside new dwellings is now assessed against illuminance targets rather than daylight factors. Here is how the tests work and what the model has to state.

Read article →
Constraints and Designations7 min read

Source protection zones and development over groundwater

Source protection zones do not prohibit development. They change which activities the Environment Agency will accept, starting with infiltration and piling.

Read article →
Professionals and Qualifications7 min read

Reading a CV against a validation requirement

Competence in the abstract is not the test. The test is the wording on the local list, and matching a CV against it takes ten minutes.

Read article →
Permitted Development7 min read

Dropped kerbs and access under Part 2 Class B

A dropped kerb needs two things checked: whether Class B of Part 2 covers it, and whether the highway authority will consent to the crossing at all.

Read article →
Residential Scale Thresholds7 min read

Determination periods and what sets them

Determination periods follow the scale category of your application. Here is what sets each one, what stops the clock, and how to handle an extension of time.

Read article →
Scenario Walkthroughs7 min read

A farm diversification scheme across three applications

An illustrative walkthrough of a diversification programme delivered through three applications, showing how sequencing built the highways evidence base.

Read article →
Templates, Checklists and Examples7 min read

An illustrative worked example of the 45 degree test

The 45 degree test is local guidance rather than national policy. Here is how it is drawn, where councils differ, and a worked illustrative example.

Read article →
Ecology, BNG and Protected Species7 min read

Bat emergence survey effort and roost suitability

The suitability category assigned at the preliminary roost assessment decides how many emergence visits follow, and therefore your programme for the whole season.

Read article →
Daylight, Sunlight and Amenity7 min read

Sunlight to gardens and amenity areas on 21 March

Gardens are tested on one date: 21 March. At least half the area should receive two hours of direct sunlight, with a further comparison where an existing garden loses out.

Read article →
Constraints and Designations7 min read

World heritage site buffer zones and development control

Buffer zones are not a statutory designation in England. Control comes from plan policy, national heritage policy and the designations inside the zone.

Read article →
Professionals and Qualifications7 min read

When a council asks for a chartered structural engineer

Councils ask for chartered structural input when the planning judgement depends on whether a building can be kept, converted or excavated beside safely.

Read article →
Permitted Development7 min read

Hard surfaces under Class F and the drainage condition

Paving a front garden is permitted development under Class F, but only if the surface is porous or run-off goes to a permeable area inside your boundary.

Read article →
Residential Scale Thresholds7 min read

Active Travel England and the 150 unit referral

At 150 dwellings, 7,500 square metres of floorspace or five hectares, your application is referred to Active Travel England. Here is what the agency looks for.

Read article →
Scenario Walkthroughs7 min read

A basement under a terraced house in London

An illustrative walkthrough of a single-storey basement under a London mid-terrace, showing where the evidence base went and which conditions followed.

Read article →
Templates, Checklists and Examples8 min read

A tree protection plan checklist to BS 5837

A tree protection plan is a scale drawing that has to survive contact with the engineer's layout. Here is what it must show and the checks to run before submission.

Read article →
Permitted Development7 min read

What incidental to the enjoyment of a dwellinghouse means

Incidental is the word that decides whether a garden building is permitted development. It is an objective test, and it excludes primary living accommodation however the owner describes it.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope