Articles – page 243

9172 articles
Planning Process6 min read

Prior approval applications and how the clock works

Prior approval runs on a fixed period with deemed consent at the end of it. Here is when the clock starts, what the submission must contain, and where authorities push back.

Read article →
Transport, Highways and Parking6 min read

Car-free development and how the restriction is secured

A condition cannot stop an occupier parking on the street, so permit-free development is secured by obligation. How the mechanism works and what evidence supports it.

Read article →
Viability, Obligations and Commercial6 min read

Affordable housing review mechanisms in section 106

A review mechanism converts a viability concession into a conditional obligation. Here is how the triggers work, which appraisal inputs are fixed, and what to negotiate.

Read article →
Fire, Structural and Basements7 min read

Basement excavation near trees and structural roots

Digging near a mature tree usually means the basement moves, the tree goes, or you pay for an engineered solution. What decides which, and how to present it.

Read article →
Energy, Sustainability and Carbon6 min read

Overheating assessment for a planning application

Overheating mitigation shows on the elevations, which is why authorities want the assessment before permission. Modelling routes, weather files and the noise conflict.

Read article →
Noise, Air, Odour and Light6 min read

Biomass boilers and the air quality case for one

A biomass boiler puts combustion emissions at roof level. Here is the air quality case it has to make, and when a heat pump is the simpler consent.

Read article →
Data Tools How-To6 min read

Reading a geological map for a development site

Published geology is a hypothesis to test, not a survey. How to read it, pair it with borehole records, and turn the result into a site investigation brief.

Read article →
Commercial Occupiers6 min read

Outdoor seating for cafes and restaurants

Whether outdoor seating needs a pavement licence or planning permission depends on who owns the ground. Here is how each route works and where they overlap.

Read article →
Costs, Fees and Budgeting6 min read

Calculating your CIL liability from the charging schedule

The levy is floorspace times an indexed rate, less any deduction you can evidence. Here is how to calculate it before the liability notice arrives.

Read article →
Planning Law Updates7 min read

Biodiversity net gain: the phased commencement dates

Which biodiversity net gain regime applies depends on when the application was made, not when it was decided. The two commencement dates, the exemptions and the transitional rules.

Read article →
Refusals and Appeals7 min read

Answering a refusal based on loss of employment land

Employment protection policies turn on whether a site has a reasonable prospect of continued employment use. Here is the marketing and viability evidence that answers them.

Read article →
Planning Process6 min read

What must be submitted before work starts on site

The costly mistakes before a start on site are administrative. Here is the order to discharge conditions, claim levy exemptions and get building control in place.

Read article →
Professionals and Qualifications6 min read

Choosing an acoustician and reading their credentials

Environmental health officers judge a noise report by its author, its instrumentation and its method. Here is what to verify before you instruct, and what to check after.

Read article →
Transport, Highways and Parking6 min read

Section 278 works: process, bond and realistic timescales

A section 278 agreement usually takes longer than the planning application that required it. Here is the sequence, the costs beyond the works, and where programmes slip.

Read article →
Viability, Obligations and Commercial7 min read

Whole plan viability and site specific viability

National policy expects viability to be resolved at plan making. Here is what distinguishes whole plan from site specific assessment, and how to frame the exception.

Read article →
Fire, Structural and Basements6 min read

Temporary works and construction stability conditions

Planning cannot duplicate construction safety controls, but it can control effects beyond the site boundary. How to answer a temporary works condition efficiently.

Read article →
Energy, Sustainability and Carbon7 min read

Zero carbon conditions and how they are discharged

Design-stage energy modelling wins the permission. As-built verification discharges the condition. Here is how the two differ and where schemes come unstuck.

Read article →
Noise, Air, Odour and Light7 min read

Noise conditions that cannot be enforced, and the fix

Most noise conditions fail on precision and enforceability. Here is why inaudibility wording does not work, and the two-stage structure that does.

Read article →
Data Tools How-To6 min read

The planning data service and how current its datasets are

The national planning data platform is the fastest first pass on a site, and every entity tells you who published it and when. How to use that, and where to go behind it.

Read article →
Commercial Occupiers7 min read

Electric vehicle charging hubs on commercial land

Adding chargers to an existing car park and building a charging hub are different planning propositions. What the GPDO covers, and what a hub application has to answer.

Read article →
Costs, Fees and Budgeting6 min read

Hearings and inquiries compared with written appeals

The Planning Inspectorate charges no appeal fee, so procedure drives cost. A comparison of written representations, hearings and inquiries for a developer budgeting an appeal.

Read article →
Refusals and Appeals6 min read

Appeal timetables and what actually drives delay

Appeal delay usually comes from a rejected submission, an escalating procedure or late evidence. Here is the programme stage by stage, and where the time actually goes.

Read article →
Report Deep Dives6 min read

The interpretation section of a geotechnical report

The interpretative section is the part of a ground investigation report that commits to a view. Here is what belongs in it and what reviewers check first.

Read article →
Planning Process7 min read

Planning fees: how the schedule is applied and indexed

Planning fees in England come from one national schedule, not from your council. Here is how the bands work, which exemptions exist, and why the figure moves each April.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope