Articles – page 264

9135 articles
Seasonal Calendar6 min read

Water vole survey season and works near a watercourse

The water vole survey season, why two visits are expected, when displacement can be carried out, and the consents that sit alongside planning permission.

Read article →
Planning Law Updates6 min read

Planning conditions: the national restrictions on drafting

What the six tests mean in practice, why pre-commencement conditions now need your written agreement, and the three routes to changing a condition after permission.

Read article →
Neighbours, Objections and Community6 min read

Petitions and template objections: the weight they carry

How councils record petitions and duplicate objection letters, why identical representations are counted once, and what makes an objection reach the officer's assessment.

Read article →
Professionals and Qualifications6 min read

Who can prepare an air quality assessment

How environmental health officers judge the author of an air quality assessment, the difference between monitoring and modelling competence, and how to scope the work.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a scheme in a nutrient neutrality catchment

An illustrative walkthrough of a residential scheme in a nutrient neutrality catchment, from the nutrient budget to the appropriate assessment the council must adopt.

Read article →
Templates, Checklists and Examples7 min read

Proof of evidence: a working structure for a witness

The structure an inspector expects in a proof of evidence, from the expert declaration to the summary required once the proof passes 1,500 words.

Read article →
Comparisons6 min read

Open space assessment or play space assessment

The two assessments overlap on the site plan and diverge in method. Child yield, age band walking distances and maintenance liability decide which one your scheme needs.

Read article →
Costs, Fees and Budgeting6 min read

Planning fees for a householder extension: what you pay

What the householder application fee covers, when no fee is payable, how the planning guarantee refund works, and the costs that sit outside the fee.

Read article →
Report Deep Dives7 min read

The SuDS maintenance schedule in a Drainage Strategy

The maintenance schedule is the part of a Drainage Strategy the lead local flood authority reads hardest. Here is what it needs to say about adoption, access, intervals and enforcement.

Read article →
Glossary6 min read

Article 9A fire statements: when your application needs one

Article 9A of the DMPO 2015 requires a fire statement with planning applications involving relevant buildings, and triggers consultation with the Health and Safety Executive at Planning Gateway One.

Read article →
Scenario Walkthroughs6 min read

Walkthrough: a shop becoming a children's nursery

An illustrative shop to day nursery change of use: why a condition on an old permission made an application necessary, and how drop off and play noise were dealt with.

Read article →
Templates, Checklists and Examples6 min read

Statement of common ground: structure for an inquiry

A statement of common ground records what the parties have stopped arguing about. Section by section, what to put in it and where the drafting usually goes wrong.

Read article →
Comparisons6 min read

Archaeological desk assessment or field evaluation

The desk study collates existing records and decides where trenches go. The evaluation puts holes in the ground. Most sites with potential need both, in sequence.

Read article →
Costs, Fees and Budgeting6 min read

VAT on planning and professional fees for self-builders

Construction services on a qualifying new dwelling are zero-rated. Professional fees are not, and the self-build refund scheme does not cover them. Budget them gross.

Read article →
Glossary6 min read

Nutrient budget

A nutrient budget compares the nitrogen or phosphorus load from a scheme with the existing land use. A positive figure means mitigation before permission can be granted.

Read article →
Costs, Fees and Budgeting6 min read

Budgeting an air quality evidence base

Air quality budgets usually price the report and forget the monitoring. Where the money and the months actually go, from screening through to the damage cost calculation.

Read article →
Which Reports Do I Need6 min read

Reports for a scheme next to a designated wildlife site

Next to a designated site the assessment follows the pathways: land take, hydrology, air quality, recreation, lighting and noise. What to map, survey and submit.

Read article →
Glossary6 min read

Planning contravention notice

A planning contravention notice is a demand for information about a suspected breach, not enforcement action. There is no appeal, but failing to reply within 21 days is an offence.

Read article →
Seasonal Calendar6 min read

Dormouse survey season and what it costs a scheme

Hazel dormouse surveys need most of the April to November season to reach the accepted probability threshold. What that means for licensing, clearance and the programme.

Read article →
Planning Law Updates6 min read

Neighbourhood plans: weight, review and referendum

Once made, a neighbourhood plan sits in the statutory development plan. How the stages work, what the basic conditions test, and what happens when a later local plan conflicts.

Read article →
Neighbours, Objections and Community6 min read

Speaking at planning committee as an objector

Committee speaking rules sit in your council's constitution: a registration deadline, a short slot often shared between objectors, and a narrow set of things members can act on.

Read article →
Professionals and Qualifications6 min read

Conflicts of interest when your designer writes the reports

Advocacy documents are expected to argue for the scheme. Assessment documents are meant to report what the method produces. The conflict lives in the second group.

Read article →
Scenario Walkthroughs6 min read

Walkthrough: retrospective application after enforcement

An illustrative householder case: an over-deep rear extension with a roof terrace, a planning contravention notice, and why applying before a notice is issued matters.

Read article →
Comparisons6 min read

Discharging conditions or amending a permission

A discharge application supplies details a condition asks for. An amendment changes what the permission authorises. Picking the wrong one costs a determination period.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope