Articles – page 268

9128 articles
Report Deep Dives6 min read

The junction capacity section of a transport assessment

Junction capacity modelling decides most highway objections. Here is how to scope the junctions, agree growth and committed development, and read the capacity and queue outputs a case officer will question.

Read article →
Costs, Fees and Budgeting6 min read

The fee exemption for disabled persons adaptations

Works that provide access or facilities for a disabled person can carry no planning fee at all under the 2012 fees regulations. The claim is made at submission, and the evidence you attach decides whether it is accepted.

Read article →
Refusals and Appeals6 min read

Interested party representations at appeal

Your objection to the application goes to the Planning Inspectorate automatically. Whether you can add anything depends on the appeal procedure, and householder appeals accept nothing new at all.

Read article →
Which Reports Do I Need7 min read

Reports for a new house on a backland garden plot

A house on a subdivided garden needs a smaller evidence base than a greenfield plot, but a specific one. Access, trees, drainage and the biodiversity baseline decide what you commission and in what order.

Read article →
Householder Extensions and Conversions7 min read

Front garden parking and permeable surfacing

Front garden parking is permitted development under Class F only where the surface is porous or the run-off is kept inside your boundary. The dropped kerb is a separate consent under the Highways Act 1980.

Read article →
Costs, Fees and Budgeting7 min read

What the householder application fee actually covers

The householder fee buys a determination and nothing else. Which works sit inside the category, and the four exclusions that invalidate applications.

Read article →
Refusals and Appeals7 min read

The appeal questionnaire and the council's statement

The questionnaire arrives early and is largely factual. Read it against the reasons for refusal, because the gaps between them are where appeals are won.

Read article →
Report Deep Dives7 min read

Rating penalties in a BS 4142 assessment

The correction is where measurement meets judgement, and where a BS 4142 assessment either shows its working or invites a challenge it cannot answer.

Read article →
Householder Extensions and Conversions7 min read

Front porches within permitted development limits

Three limits govern a porch under permitted development, and the two metre highway separation rules out more front porches than the size limit ever does.

Read article →
Wales, Scotland and Northern Ireland7 min read

Planning appeals to the Planning Appeals Commission

Northern Ireland appeals go to the Planning Appeals Commission, not the Planning Inspectorate. The deadlines, procedures and policy framework are all different.

Read article →
Refusals and Appeals7 min read

Reading reasons for refusal before you decide to appeal

A refusal notice is two paragraphs that decide your next move. Separating what the council found from what it concluded is where that decision starts.

Read article →
Report Deep Dives8 min read

Habitat condition assessment in a biodiversity metric

Condition multiplies straight into the habitat unit figure, so it is where baselines are challenged. Working the criteria sheets is what makes a call defensible.

Read article →
Householder Extensions and Conversions7 min read

Hip to gable conversions and where they fail

A hip to gable is permitted development on most houses. The volume it consumes, and what it does to a semi-detached pair, is where the trouble starts.

Read article →
Neighbours, Objections and Community7 min read

Objecting to a certificate of lawfulness application

Amenity objections carry no weight on a lawful development certificate. Dated factual evidence contradicting the applicant's account does.

Read article →
Fire, Structural and Basements7 min read

Foundation design on made ground and former industrial sites

Fill varies over metres, not hundreds of metres. The design has to cope with that variation, and differential settlement is the failure it must prevent.

Read article →
Daylight, Sunlight and Amenity7 min read

Presenting daylight results a committee can read

The numbers in a daylight report are usually right. What loses the argument is that nothing tells a councillor which of the 300 rows matters.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a bat roost found before a demolition

Droppings on a beam in February meant a demolition in October. Where the seven months went, and what could have been done differently.

Read article →
Wales, Scotland and Northern Ireland8 min read

Dwellings in the countryside in Northern Ireland

Northern Ireland has no presumption to balance. A countryside dwelling must fit one of a narrow set of policy routes, each with its own evidential tests.

Read article →
Refusals and Appeals7 min read

Proofs of evidence and rebuttals at inquiry

A proof is a witness's own evidence, not a second statement of case. The timetable, the summary convention and when an inspector will accept a rebuttal.

Read article →
Report Deep Dives8 min read

What triggers further survey in a PEA recommendation

Presence and absence surveys belong before determination. Mitigation detail can be conditioned. Knowing which is which decides whether ecology costs weeks or months.

Read article →
Householder Extensions and Conversions7 min read

Dormer design that survives a planning officer

Forty or fifty cubic metres is the permitted development allowance for a dormer. Building to the maximum is often what gets a scheme refused when it needs consent.

Read article →
Neighbours, Objections and Community7 min read

Petitions, template letters and individual objections

A petition registers a view; it does not raise a planning issue. How representations are weighed, and how to divide the ground between neighbours.

Read article →
Fire, Structural and Basements8 min read

Ground gas protection and BS 8485 measures

Protection design follows the characteristic situation, and that follows the monitoring data. Too few rounds in settled weather is where schemes lose a season.

Read article →
Daylight, Sunlight and Amenity7 min read

Courtyard blocks and sunlight to shared amenity space

At least half an amenity area should get two hours of sun on 21 March. Courtyards fail that for reasons fixed in the massing, not in the modelling.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope