Articles – page 27

9599 articles
Comparisons6 min read

Transport Assessment or Travel Plan: different jobs

One predicts the traffic a development will generate. The other commits its occupiers to reducing it. How Transport Assessments and Travel Plans differ, and when a scheme needs both.

Read article →
Refusals and Appeals6 min read

Appealing a refusal of reserved matters approval

A reserved matters refusal is appealed under section 78, but the dispute is confined to the matters reserved and the conditions on the outline permission. Here is how to run it.

Read article →
Glossary7 min read

TRICS parameters and trip rate selection

Every TRICS filter moves the trip rate. A practitioner's guide to choosing the land use category, setting the filters and writing a selection the highway authority can rebuild.

Read article →
Scenario Walkthroughs8 min read

A self-build plot in flood zone 2: the application route

A house is more vulnerable development, appropriate in Flood Zone 2 without the Exception Test. What the sequential test, levels and access evidence looked like.

Read article →
Comparisons7 min read

Whole life carbon or circular economy: two different asks

A whole life carbon assessment produces numbers and a circular economy statement produces commitments. How they overlap and where reviewers find contradictions.

Read article →
Refusals and Appeals7 min read

Rebuttal evidence and when an inspector will accept it

Inspectors admit rebuttals that answer unforeseeable points and disregard material that expands the issues. How the timetable works and why statements of case matter.

Read article →
Glossary7 min read

Lawson wind comfort criteria and how to read the results

Comfort categories match wind conditions to activities, while a separate safety threshold deals with rare high speeds. How to review a wind microclimate assessment.

Read article →
Planning Law Updates7 min read

Section 73B: the new power to vary a planning permission

The 2023 Act inserted a power to vary a permission, including its description, where the effect is not substantially different. How to choose between the routes.

Read article →
Permitted Development7 min read

Domestic wind turbines and the permitted development limits

Part 14 permits one standalone turbine per curtilage, up to 11.1 metres, set back by its own height plus ten per cent. Why the separation rule defeats most plots.

Read article →
Professionals and Qualifications7 min read

Reading the limitations page of a consultant's report

A conclusion is only as good as the scope behind it. How to read exclusions, data currency and reliance wording before a report goes into a planning submission.

Read article →
Fire, Structural and Basements7 min read

Gas meters, risers and fire separation on the elevations

Approved Document B keeps gas out of the protected escape stair, so the meters land on your elevation. How to position, ventilate and detail them for planning.

Read article →
Scenario Walkthroughs8 min read

A listed pub converted to two flats and a shop

Two cases run in parallel on a pub conversion: the loss of a community facility and the alteration of listed fabric. How both were answered on an illustrative scheme.

Read article →
Comparisons7 min read

Building recording or watching brief: which applies

A recording condition has a fixed scope and a known fee. A watching brief carries a stop-work trigger. How the two differ and when a scheme attracts both.

Read article →
Refusals and Appeals7 min read

Appealing a condition attached to a prior approval

Paragraph W only allows conditions reasonably related to the subject matter of the prior approval. How to challenge one, and when compliance is the better route.

Read article →
Glossary7 min read

Planning injunctions under section 187B explained

A planning injunction is enforced by contempt of court, which makes it the sharpest power a council has. How section 187B works and what the court actually decides.

Read article →
Planning Law Updates7 min read

Nutrient neutrality: the habitats duty behind the constraint

The nutrient neutrality requirement rests on regulation 63 of the Habitats Regulations 2017. What that means for budgets, mitigation, timescales and refusal risk.

Read article →
Permitted Development7 min read

Outbuilding height limits within 2 metres of a boundary

The 2.5 metre limit near a boundary, the 2.5 metre eaves limit everywhere, and measurement from the highest adjacent ground. What Class E allows for a garden building.

Read article →
Professionals and Qualifications7 min read

Who can write a drainage strategy a council will accept

Nobody licenses drainage strategy authors, so the test is competence and evidence. What the lead local flood authority checks and how to scope the appointment.

Read article →
Fire, Structural and Basements7 min read

Firefighting access into courtyard and perimeter blocks

A perimeter block with one arched entry rarely works for firefighting access. How the distances are measured, what gates need, and the alternatives when access fails.

Read article →
Energy, Sustainability and Carbon7 min read

Solar on farm buildings: permitted development limits

Roof and ground mounted renewables on an agricultural unit fall under Part 14, while Part 6 covers agricultural buildings. How the purpose test decides which applies.

Read article →
Scenario Walkthroughs7 min read

A padel court at a cricket club: the planning route

Two floodlit padel courts on a cricket outfield, followed from siting decision to decision notice. Noise, lighting, parking and the Sport England consultation.

Read article →
Commercial Occupiers7 min read

When intensifying a use needs planning permission

Longer hours, more covers, earlier deliveries. When does busier become a material change of use under section 55, and what evidence does the council want?

Read article →
Comparisons7 min read

Lawful development certificate or listed building certificate

A lawful development certificate answers a planning question. A section 26H certificate answers a listed building question. The difference, the evidence and the fees.

Read article →
Refusals and Appeals7 min read

Refusal or withdrawal: which serves the application better

The case officer offers you the chance to withdraw before refusal. What you gain and lose either way, from section 78 appeal rights to the fee-free second attempt.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope