Articles – page 270

9124 articles
Wales, Scotland and Northern Ireland7 min read

Section 42 applications in Scotland to change conditions

Section 42 of the Town and Country Planning (Scotland) Act 1997 is the Scottish route for varying a planning condition. It creates a new permission, and the drafting has to be exact.

Read article →
Residential Scale Thresholds7 min read

Housing mix and space standards as schemes grow

Mix policies, the nationally described space standard and accessible dwelling percentages all arrive at different scheme sizes. Here is where each one starts to apply and what evidence supports it.

Read article →
Householder Extensions and Conversions8 min read

Extensions near trees and root protection areas

A protected tree rarely blocks an extension, but its root protection area decides where the foundations go and what the council asks for at validation.

Read article →
Commercial Occupiers7 min read

Farm cafe and glamping together: cumulative effects

A cafe added to a farm with glamping pitches is assessed against the whole holding. Traffic on a shared access and foul drainage capacity are usually the binding constraints.

Read article →
Residential Scale Thresholds7 min read

Construction management requirements as site size increases

There is no national threshold for a construction management plan. The trigger is unit count, the road outside and the neighbours, and the condition wording is negotiable before it is imposed.

Read article →
Householder Extensions and Conversions7 min read

Materials that match the existing house

Similar appearance is not the same as matching. Course height, mortar, tile profile and reveal depth do the work, and a sample panel is what gets the condition discharged.

Read article →
Neighbours, Objections and Community7 min read

What a Statement of Community Involvement should show

Two different documents share the name. This is the applicant's consultation report: what it should record, how feedback ought to change a scheme, and how to test one.

Read article →
Fire, Structural and Basements7 min read

Smoke control in common corridors at planning stage

Smoke control in a block of flats decides corridor length, core size, roof plant and the elevation. The three strategies and what each one needs reserving at concept stage.

Read article →
Daylight, Sunlight and Amenity7 min read

Assessing daylight to a property you cannot access

Where a neighbour refuses internal access, the external daylight metrics still work. The interior ones rely on assumed room depth and use, which have to be stated, sourced and sensitivity tested.

Read article →
Viability, Obligations and Commercial7 min read

Affordable housing on small sites and the national threshold

The small sites threshold has two limbs: ten dwellings and 1,000 square metres of gross internal floorspace. Designated rural areas can apply a lower figure, and vacant building credit can remove the contribution.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: office to flats under Class MA

An illustrative Class MA prior approval turning a 1970s office into nine flats, following the natural light test, the noise case against a neighbouring pub and the full document pack.

Read article →
Wales, Scotland and Northern Ireland7 min read

Planning permission in principle in Scotland

Permission in principle settles whether development belongs on a site in Scotland. The second stage is approval of matters specified in conditions, and the time limits run differently from England.

Read article →
Commercial Occupiers7 min read

Beauty salons and nail bars: extraction and hours

Nail bars and beauty salons fall within Class E, so the use rarely needs permission. Solvent extraction, duct termination, hours conditions and backflow protection are what decide the fit-out.

Read article →
Residential Scale Thresholds7 min read

Mayoral referral thresholds for London residential schemes

A residential scheme of more than 150 units in Greater London must be referred to the Mayor. The two stage process, the powers that apply at each, and the documents the Greater London Authority expects.

Read article →
Householder Extensions and Conversions7 min read

Outbuilding height limits within two metres of a boundary

Class E caps an outbuilding at 2.5 metres overall within 2 metres of any curtilage boundary. The measurement conventions, the eaves limit and the raised platform exclusion decide compliance.

Read article →
Neighbours, Objections and Community7 min read

Objecting to an HMO conversion in an Article 4 area

Small HMO conversions are permitted development unless an Article 4 direction removes the right. Where an application exists, concentration policy, parking and refuse evidence are what an objection has to supply.

Read article →
Fire, Structural and Basements7 min read

Dry risers, wet risers and the height that separates them

Approved Document B puts dry rising mains above 18 metres and wet mains above 50 metres. The switch brings a water store, pumps and a plant room that a core drawn for a dry main cannot absorb.

Read article →
Daylight, Sunlight and Amenity7 min read

Roof terraces, privacy screens and conditions

Roof terrace objections turn on drawings rather than argument. Here is the sightline analysis, the screen height and material choice, and the condition wording that officers accept.

Read article →
Viability, Obligations and Commercial7 min read

Section 278 works and section 38 adoption compared

A section 278 agreement pays for works to somebody else's road. A section 38 agreement hands over yours. The two carry different bonds, fees, approval routes and programme risks.

Read article →
Energy, Sustainability and Carbon7 min read

Modern methods of construction and the carbon case

Modular and offsite systems can cut waste and operational energy, but the embodied carbon answer depends on the frame material and the transport distance. What a defensible planning submission needs.

Read article →
Scenario Walkthroughs8 min read

Walkthrough: barn conversion under Class Q

An illustrative Class Q prior approval for a steel portal frame barn, following the structural evidence that decides these cases and the full document pack that went with it.

Read article →
Wales, Scotland and Northern Ireland7 min read

Pre-application advice in Wales: the statutory service

Pre-application advice in Wales is a statutory service with prescribed content, a regulated fee and a response deadline. Here is what the answer must cover and how to frame a request that earns a useful one.

Read article →
Commercial Occupiers7 min read

Funeral directors and the use class question

Funeral directors lost their express listing when Class E was created. The use usually falls inside Class E, though preparation facilities, extraction and service access decide what you actually have to apply for.

Read article →
Residential Scale Thresholds7 min read

Highways: from a single access to an internal road network

A private drive suits a handful of houses. Past that point the highway authority expects an adoptable street, which changes geometry, drainage, lighting and the legal agreement you need.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope