Articles – page 274

9117 articles
Professionals and Qualifications6 min read

Who is competent to carry out a BS 4142 assessment

BS 4142 leans on the assessor's judgement at three points. Here is the competence, instrumentation and measurement record councils expect to see.

Read article →
Viability, Obligations and Commercial6 min read

CIL relief for extensions and annexes to your own home

CIL relief for home extensions and annexes has to be claimed and granted before work starts. Here is the sequence, the clawback and why claims fail.

Read article →
Energy, Sustainability and Carbon6 min read

Carbon in the infrastructure a scheme has to build

Building-level carbon assessments leave out the roads, drainage and earthworks a scheme has to build. Here is how to set a boundary that holds up.

Read article →
Commercial Occupiers6 min read

Hand car wash on a forecourt: drainage and effluent

Wash water is the issue that refuses hand car wash applications. Here is what the drainage, effluent consent and highway case need to show.

Read article →
Residential Scale Thresholds7 min read

Fire Statement thresholds: when Gateway One applies

Article 9A of the DMPO requires a Fire Statement for relevant buildings at 18 metres or seven storeys. Here is how the measurement works and what it triggers.

Read article →
Rural and Agricultural6 min read

Solar farms on agricultural land: the policy tests

Solar farm applications turn on land quality, views, restoration and the grid connection. Here is the evidence each of those four questions needs.

Read article →
Costs, Fees and Budgeting6 min read

What drives the price of a Planning Statement

Planning Statement quotes vary widely because the research behind them does. Here is what drives the price and where you can reasonably do more yourself.

Read article →
Planning Process7 min read

Crown development and the urgent Crown route

Most Crown schemes are ordinary applications to the council. Section 293A sends urgent development of national importance straight to the Secretary of State.

Read article →
Planning Law Updates6 min read

Demolition and rebuild under Part 20 Class ZA

Class ZA allows a detached commercial building or block of flats to be demolished and rebuilt as homes. Here are the gates most sites fail and the evidence needed.

Read article →
Neighbours, Objections and Community6 min read

Commenting on a planning appeal as a neighbour

Neighbours can write to the Planning Inspectorate when an application goes to appeal, usually within five weeks. Householder appeals work differently.

Read article →
Professionals and Qualifications6 min read

Arboriculturist qualifications for a BS 5837 survey

BS 5837 asks for an arboriculturist without naming a qualification. Here is what councils actually look for, and how to check the survey you have paid for.

Read article →
Viability, Obligations and Commercial6 min read

The CIL commencement notice and what happens if you miss it

A missed CIL commencement notice costs instalment rights and up to £2,500 in surcharge, even where full relief applies. Here is the sequence and the fix.

Read article →
Energy, Sustainability and Carbon6 min read

All-electric new homes and the gas connection decision

Leaving gas out of a new housing scheme is a design decision that has to be evidenced at application stage. Here is what councils expect to see.

Read article →
Commercial Occupiers7 min read

Microbrewery with a taproom: the sui generis trap

A taproom in the corner of a brewery creates a sui generis drinking establishment alongside an industrial use. Here is how to apply for it and what conditions follow.

Read article →
Costs, Fees and Budgeting7 min read

CIL surcharges and how to avoid them

Community Infrastructure Levy surcharges punish paperwork failures, not underpayment. Here is what each one costs, when it bites and how to appeal within 28 days.

Read article →
Residential Scale Thresholds7 min read

The rural exception site threshold and how it works

Rural exception sites release edge-of-village land for affordable homes in perpetuity. Here is how the threshold works and what makes a scheme deliverable.

Read article →
Rural and Agricultural6 min read

Equestrian use: where agriculture stops

Grazing is agriculture. Keeping horses is not. Here is where the line falls, and what it means for stables, manege applications and livery yards.

Read article →
Data Tools How-To7 min read

Finding housing land supply and delivery test figures

The five year supply position and the Housing Delivery Test result decide whether the presumption applies. Here is where each is published and how to check it.

Read article →
Planning Process8 min read

Making and confirming an Article 4 direction

Article 4 directions withdraw permitted development rights in a defined area. Here is how one is made, publicised and confirmed, and where compensation under section 108 still bites.

Read article →
Residential Scale Thresholds6 min read

Active Travel England and the 150 unit consultation trigger

Active Travel England is consulted on major schemes at 150 dwellings, 7,500 square metres or 5 hectares. Here is what its assessment looks for and how to answer it before submission.

Read article →
Data Tools How-To6 min read

Checking whether the strategic road network is engaged

A site within 67 metres of a trunk road, or putting material traffic onto it, engages the national network operator. Here is how to test that and scope the transport work before it stalls.

Read article →
Costs, Fees and Budgeting6 min read

How a CIL charge is calculated on a new dwelling

The Community Infrastructure Levy calculation turns on four inputs: the rate, the gross internal area, the existing floorspace deduction and the index. Here is how each one works.

Read article →
Planning Process6 min read

Regulation 25 requests for further environmental information

Regulation 25 of the EIA Regulations 2017 lets an authority require further environmental information before determining an application. Here is how to answer one and how to avoid it.

Read article →
Data Tools How-To6 min read

Ordering sewer records and pre-development enquiries

Asset location searches and pre-development enquiries answer different questions. Here is how to order both, what the records do not show, and how the responses feed a drainage strategy.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope