Articles – page 275

9115 articles
Planning Law Updates6 min read

Permitted development for larger rear extensions

The larger rear extension right doubles the standard Class A depth limits, subject to the neighbour consultation scheme. Here is how the procedure runs and what an objection can actually be about.

Read article →
Neighbours, Objections and Community6 min read

Using environmental information requests in planning

Most planning material held by a council falls under the Environmental Information Regulations 2004, which carry a presumption in favour of disclosure. Here is how to word a request and challenge a refusal.

Read article →
Viability, Obligations and Commercial6 min read

Applying the sequential test to offices and leisure uses

Gyms, cinemas, hotels and offices are main town centre uses, so a site outside a defined centre has to pass the sequential test. Here is how the flexibility argument works in practice.

Read article →
Energy, Sustainability and Carbon6 min read

Energy masterplanning across a phased site

An energy strategy written at outline stage will be obsolete before the last phase is built. Here is what to fix at outline, what to leave open, and how to draft conditions that survive the programme.

Read article →
Rural and Agricultural6 min read

New agricultural buildings under Part 6

New farm buildings on holdings of five hectares or more are usually permitted development under Part 6, subject to size, siting and the prior notification procedure. Here are the limits that decide it.

Read article →
Data Tools How-To6 min read

Reading habitat inventories and classification data

National habitat inventories tell you where to look, not what is there. Here is how their polygons relate to a statutory metric baseline and how to use them to scope ecological survey work.

Read article →
Costs, Fees and Budgeting6 min read

The fee for a section 73 application to vary a condition

A section 73 application to vary a condition carries a fixed, annually indexed fee. The larger costs sit in the new permission it creates, the levy recalculation and the deed of variation.

Read article →
Planning Process6 min read

Advertisement consent: procedure and the five year term

Signage applications turn on amenity and public safety, not planning policy. Here is how deemed consent classes work, what an express consent application needs, and what happens after five years.

Read article →
Planning Law Updates7 min read

Class MA prior approval: the limits and conditions

Class MA allows class E premises to become dwellings through prior approval, but the qualifying conditions decide most applications. Here is what to check before you commission anything.

Read article →
Neighbours, Objections and Community7 min read

Complaining to the Ombudsman about a planning decision

An ombudsman complaint about a planning decision succeeds on procedural fault and injustice, not on disagreement with the outcome. Here is what to include and what the Ombudsman can actually recommend.

Read article →
Viability, Obligations and Commercial6 min read

Competing viability appraisals at appeal

Inspectors do not split the difference between two viability appraisals. They make findings on individual inputs, so the appeal turns on benchmark land value, build costs, values and return.

Read article →
Fire, Structural and Basements6 min read

Basement flood risk: sumps, valves and safe egress

A basement used for sleeping is highly vulnerable development, which rules it out in Flood Zone 3 and triggers the Exception Test in Zone 2. Here is what the assessment has to cover.

Read article →
Energy, Sustainability and Carbon7 min read

External wall insulation in a conservation area

Class A withdraws cladding rights on article 2(3) land, so solid wall insulation in a conservation area needs planning permission. Here is what the detailing, the moisture evidence and the heritage case have to show.

Read article →
Residential Scale Thresholds6 min read

Counting units correctly for the major development test

The major development definition in the Development Management Procedure Order counts dwellings provided rather than the net increase. Here is how to count replacements, conversions, flats and mixed use schemes correctly.

Read article →
Rural and Agricultural7 min read

Class Q barn conversions: the qualifying tests

Most Class Q refusals happen before the prior approval matters are ever reached. Here are the qualifying tests a barn has to pass, and when a full planning application is the better route.

Read article →
Data Tools How-To6 min read

Checking public rights of way on the definitive map

A recorded right of way exists whether or not anyone has walked it. Here is how to order the definitive map and statement, read the classification and width, and run a diversion order before development starts.

Read article →
Planning Process7 min read

Section 70C and declining to determine a retrospective bid

Section 70C of the Town and Country Planning Act 1990 allows a council to decline to determine an application for development already covered by an enforcement notice. There is no appeal against that choice.

Read article →
Glossary8 min read

Settlement boundaries in local plans

Settlement boundaries separate the built-up area from open countryside in a local plan. Here is what the line does, how inspectors test it at examination, and what an edge-of-boundary case has to prove.

Read article →
Energy, Sustainability and Carbon6 min read

Biosolar roofs: combining panels and green roof

A green roof and a solar array share one build-up, one structure and one maintenance regime, so the two specifications have to be written as one.

Read article →
Data Tools How-To6 min read

Using historic mapping in a contamination desk study

The map sequence is the backbone of a Phase 1 desk study, and reading the annotation properly is what turns a pretty figure into evidence.

Read article →
Planning Process6 min read

Correcting a mistake in a decision notice

There is a statutory power to correct errors in appeal decisions. For a council decision notice there is no equivalent, which changes the options entirely.

Read article →
Glossary6 min read

Habitats regulations assessment

The applicant can write it, but the local planning authority must adopt it. And mitigation belongs in appropriate assessment, not in screening.

Read article →
Planning Law Updates6 min read

The Building Safety Act gateways explained for applicants

The planning stage definition of a relevant building and the building control definition of a higher-risk building are not the same, and that mismatch causes most of the confusion.

Read article →
Neighbours, Objections and Community6 min read

Objecting to tree works in a conservation area

A section 211 notice gives the council six weeks to decide whether to protect the tree. After that the works can go ahead, so timing is everything.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope