Articles – page 276

9113 articles
Noise, Air, Odour and Light6 min read

Glint and glare assessment near an aerodrome

Glint and glare modelling predicts where reflections from panels or glazing will fall across the year, and pilots and controllers are the receptors that decide it.

Read article →
Energy, Sustainability and Carbon6 min read

Hydrogen ready heating and what planning can require

Planning conditions cannot require a building to burn a fuel that is not delivered to it, which limits what a hydrogen ready claim is worth at application stage.

Read article →
Data Tools How-To6 min read

Finding borehole and geology records for a site

A free hour with the national geological records usually tells you what the ground is likely to be, which is enough to write a sensible investigation brief.

Read article →
Planning Process6 min read

From heads of terms to a completed section 106

Most decisions that slip past the statutory period are waiting on a deed, not on an officer. The delays are usually about title and parties rather than money.

Read article →
Glossary6 min read

Written ministerial statements in planning

Statements made to Parliament can change how applications are decided overnight, without a consultation and without touching the Framework text.

Read article →
Planning Law Updates6 min read

Permitted development rights for EV chargepoints

Most home chargepoints go in without a planning application, but the casing size, the upstand height and the distance to the highway all have limits.

Read article →
Neighbours, Objections and Community6 min read

Asking the council to serve a section 215 notice

Section 215 lets a council require steps to remedy land whose condition harms the amenity of the area. It is discretionary, so the request has to be built properly.

Read article →
Viability, Obligations and Commercial6 min read

Getting a planning obligation released once complete

A spent section 106 still shows on the local land charges register until someone asks the council to cancel it, and buyers' solicitors will not ignore it.

Read article →
Fire, Structural and Basements6 min read

Demolition method statements and structural stability

The stability case is the part of a demolition method statement that gets rejected, and it belongs to the structural engineer rather than the contractor.

Read article →
Glossary6 min read

The duty to cooperate and why plans fail on it

Section 33A of the 2004 Act obliges authorities and prescribed bodies to engage constructively on strategic matters. Unlike soundness, a breach cannot be fixed by main modifications.

Read article →
Noise, Air, Odour and Light6 min read

Ammonia deposition from livestock near designated sites

Ammonia travels further than odour and is assessed against habitat thresholds rather than human receptors, so a unit can be screened in by a site 10 kilometres away.

Read article →
Energy, Sustainability and Carbon6 min read

Post-occupancy reporting conditions on major schemes

Reporting actual energy use after handover sounds simple until you find the building has no sub-metering that separates what you agreed to report.

Read article →
Data Tools How-To6 min read

Using the coalfield interactive map before you buy a site

The published coalfield mapping tells you in a minute whether a site sits in a development high risk area, which decides whether a coal mining risk assessment is needed at all.

Read article →
Planning Process6 min read

Reserved matters: what layout, scale and appearance cover

The five reserved matters have statutory definitions, and the boundary between them decides what a council can still object to after outline permission is granted.

Read article →
Data Tools How-To7 min read

Checking title and ownership before you submit

Wrong certificates and short red lines cause most validation failures. What to order from Land Registry, what to overlay, and what the plan will not tell you.

Read article →
Planning Process6 min read

Delegated decisions, committee and call-in

Most applications never reach committee. What the scheme of delegation does, how a ward member calls an application in, and what happens when members disagree.

Read article →
Glossary6 min read

Holding directions in planning and what they stop

A holding direction under article 31 restricts the grant of permission, not the refusal. What it means for a scheme awaiting a call-in decision.

Read article →
Fire, Structural and Basements7 min read

Ground movement from piling next to existing buildings

Vibration that damages nothing still generates complaints. How piling method, damage categories and trigger levels are handled in a planning application.

Read article →
Noise, Air, Odour and Light7 min read

Odour from a poultry unit: modelling and distance

England sets no statutory separation distance for intensive livestock. What decides a poultry odour case: ventilation discharge, muck storage and the cleanout peak.

Read article →
Energy, Sustainability and Carbon6 min read

MEES and EPC ratings on a conversion scheme

A conversion can be consented, built and still be hard to let. Where the minimum energy efficiency standard bites, and the design choices that decide the rating.

Read article →
Data Tools How-To6 min read

Reading a council planning register for site history

A planning register search costs nothing and usually changes the design. Where the useful material sits, and how to assemble a planning history that works.

Read article →
Planning Process6 min read

What to do when an application is made invalid

Invalidation is administrative, not a decision on merits. The six items that cause most returns, how to respond, and the pre-submission check that prevents them.

Read article →
Glossary6 min read

Non-determination and the deemed refusal appeal

A missed determination deadline creates a right of appeal under section 78, not a deemed refusal. When to use it, and why waiting is often faster.

Read article →
Viability, Obligations and Commercial7 min read

Grampian conditions as an alternative to an obligation

Negatively worded conditions deliver off-site works without a deed, but only if the trigger, the completion test and the drawing references are precise.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope