Articles – page 287

9085 articles
Project Type Guides7 min read

Planning permission for a day nursery or creche

Class E(f) covers nurseries, so the use often needs no permission at all. The real arguments are drop-off parking at fixed peaks and how noise from outdoor play is assessed.

Read article →
Constraints and Designations6 min read

Special Protection Areas and recreational disturbance

Housing near an SPA usually needs a disturbance tariff and alternative greenspace secured before permission. Here is how zones, standards and in-combination assessment work.

Read article →
Heritage and Archaeology6 min read

Choosing a historic building recording level

Recording levels run from a basic photographic record to a full analytical account. Here is how to match the level to what is being lost and agree it before work starts.

Read article →
Ecology, BNG and Protected Species6 min read

eDNA sampling for great crested newts and its window

An eDNA test gives presence or absence for one pond in one season, and only between 15 April and 30 June. Here is how to use it, and the options when the window has passed.

Read article →
Trees and Arboriculture6 min read

Trees in the setting of a listed building

Trees in a listed building's curtilage need no listed building consent, but they can still be part of its setting. Here is how significance, harm and replacement planting are argued.

Read article →
Permitted Development7 min read

Curtilage and principal elevation in Class A cases

Most Class A disputes turn on defined terms rather than dimensions. Here is how curtilage, the original dwellinghouse and the principal elevation are established, including corner plots.

Read article →
Professionals and Qualifications7 min read

Wind microclimate assessment: who runs the model

Wind assessments for tall buildings are written by specialist wind engineers. Here is how tunnel testing compares with computational modelling, and what a reviewing officer checks first.

Read article →
Templates, Checklists and Examples6 min read

A worked parking stress survey for an urban site

Parking stress is parked vehicles divided by usable kerb capacity. Here is the catchment, the deductions, the survey timing and a worked calculation officers will accept.

Read article →
Comparisons7 min read

Ownership certificates A, B, C and D compared

Certificates A to D are statutory declarations under section 65 of the 1990 Act. Here is what each one says, the notices that follow and the consequences of getting it wrong.

Read article →
Project Type Guides7 min read

Planning permission for a glamping or holiday lodge site

Siting pods or lodges on a field is a material change of use. Here is how the countryside location test, the temporary use allowances, drainage and occupancy conditions decide these applications.

Read article →
Glossary6 min read

Design code: what it fixes and what it leaves open

Design codes fix the parameters that decide whether a street works and leave internal layout and detailed expression open. Which parameters are usually coded, how much weight a code carries, and how to argue a departure.

Read article →
Constraints and Designations7 min read

Special Areas of Conservation and the habitats test

Where a Special Area of Conservation could be affected, the council must reach certainty that site integrity is safe rather than weigh harm against benefit. How screening, appropriate assessment and mitigation actually work.

Read article →
Heritage and Archaeology7 min read

Written schemes of investigation: what gets approved

A written scheme of investigation is approved by the council's archaeological advisor, not the case officer. What the document needs to contain, from sampling strategy to archive deposition, and the mistakes that cost weeks.

Read article →
Ecology, BNG and Protected Species7 min read

Bat mitigation licences and the three derogation tests

A bat mitigation licence turns on three derogation tests under the Habitats Regulations, not on the planning balance. What each test requires, what Natural England expects, and how the timing shapes a build programme.

Read article →
Trees and Arboriculture7 min read

Pruning specifications and writing them properly

A pruning specification has to satisfy the tree officer, the contractor and the person inspecting afterwards. Using the right terms, expressing reductions as measurements, and wording that can be conditioned and enforced.

Read article →
Permitted Development7 min read

How the prior approval procedure actually works

The GPDO grants the permission; prior approval asks the council to consider a short list of specified matters. What the application must contain, how the 56-day period works, and why refusals for insufficient information are so common.

Read article →
Professionals and Qualifications6 min read

Who can prepare an overheating assessment to TM59

TM59 overheating assessments are judged on their assumptions, not their conclusions. What the methodology demands of a modeller, the inputs that decide pass or fail, and how the planning and Building Regulations routes differ.

Read article →
Comparisons7 min read

Advertisement consent or listed building consent for signage

Advertisement consent judges the display on amenity and public safety. Listed building consent judges the works on their effect on special interest. How the two differ and why the listed building risk never expires.

Read article →
Project Type Guides7 min read

How to get planning permission for a community workshop

Whether a community workshop is a meeting place or a light industrial use decides the application. How to settle the use class and answer the noise, extraction, parking and storage questions councils raise.

Read article →
Which Reports Do I Need7 min read

Which reports a scheme beside a railway needs

Development beside a live railway brings a second organisation into the process with its own approvals. The noise, vibration, drainage, lighting and construction documents a council and the infrastructure manager expect.

Read article →
Glossary7 min read

Standard method: calculating local housing need

The standard method produces one minimum annual housing need figure per authority. How the baseline and affordability adjustment work, how need differs from the adopted requirement, and what a supply shortfall actually changes.

Read article →
Constraints and Designations7 min read

Registered battlefields and the evidence they require

A registered battlefield carries the highest level of heritage protection in policy terms but no separate consent regime. What the register covers, why boundaries are contested, and the survey method that actually finds the evidence.

Read article →
Heritage and Archaeology7 min read

Designing an archaeological field evaluation

An evaluation before determination turns an open-ended archaeological liability into a measured one. Choosing techniques, setting sampling levels, and what positive and negative results mean for the layout.

Read article →
Ecology, BNG and Protected Species7 min read

What a preliminary roost assessment can conclude

A bat inspection can be done any time of year, but the surveys it triggers run only from May to September. What the assessment covers, what its suitability categories mean, and the conclusions it cannot support.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope