Articles – page 286

9088 articles
London6 min read

The threshold approach to affordable housing and fast track

Meet the threshold level of affordable housing on the right tenure split and a London scheme avoids a viability assessment altogether. Miss it and the whole scheme is opened up to scrutiny, with review mechanisms attached.

Read article →
Heritage and Archaeology7 min read

Grade I and Grade II listings: what changes

Grade does not alter the scope of listing. It alters the consultation the council must carry out, the policy test applied to harm and the standard of evidence and competence expected from the design team.

Read article →
Heritage and Archaeology7 min read

Reporting archaeological discoveries during works

England has no general duty to stop work for archaeology. The obligations come from your planning condition, the Treasure Act and burial law, and each has a different trigger and a different timescale.

Read article →
Ecology, BNG and Protected Species6 min read

Temporal risk and time to target condition in the metric

Created habitat is worth less in the metric the longer it takes to reach target condition. Understanding the temporal discount changes which habitats you create, when you create them and how much land the scheme needs.

Read article →
Ecology, BNG and Protected Species6 min read

A tree survey is not an ecology survey

Both documents talk about trees, and councils ask for both. One protects trees from construction, the other protects wildlife from you. Knowing which answers which question stops a scheme stalling at validation.

Read article →
Ecology, BNG and Protected Species6 min read

What makes a landscape and ecological management plan work

Landscape and ecological management plans are secured by condition and judged on whether anyone could enforce them. Measurable prescriptions, monitoring triggers and a named obligation holder are what separate a plan that works from one that is refused.

Read article →
Templates, Checklists and Examples6 min read

A pre-application submission checklist for a minor scheme

Pre-application advice is only as good as the pack you send. Here is the drawing set, site information and question list that turns a minor scheme enquiry into a usable written response.

Read article →
Templates, Checklists and Examples7 min read

An outline for an appeal statement of case

A written representations appeal is decided on what you file at the start. This is the structure that answers each reason for refusal, handles policy weight and keeps a costs application open.

Read article →
Householder Extensions and Conversions6 min read

Garage conversions and the loss of a parking space

Converting a garage is usually permitted development. The council's parking standard, any Article 4 direction and the bedroom count decide whether that holds, and what evidence answers a highways objection.

Read article →
Householder Extensions and Conversions6 min read

Materials of similar appearance in permitted development

The materials condition in Class A asks for similar appearance, not a perfect match. Where that line falls decides whether a rendered or clad extension is permitted development or a planning application.

Read article →
Householder Extensions and Conversions7 min read

Hip to gable conversions and the roof volume budget

Class B gives a house 40 or 50 cubic metres of extra roof space. A hip to gable takes a share of that before the rear dormer is drawn, and the arithmetic decides whether the conversion is permitted development or a planning application.

Read article →
Ecology, BNG and Protected Species6 min read

Scoping a preliminary ecological appraisal properly

A good appraisal names the habitats, the species surveys triggered and the window each one falls in. Here is how to scope and commission it so it protects the programme.

Read article →
London6 min read

Urban Greening Factor: how the score is calculated

The Urban Greening Factor weights each surface type by function and divides the total by site area. Here is the method, the targets and what officers check.

Read article →
Templates, Checklists and Examples6 min read

An evidence checklist for a lawful development certificate

The applicant carries the burden on the balance of probabilities. Here is the evidence that works, how to build the chronology, and the gaps that cause refusal.

Read article →
Householder Extensions and Conversions6 min read

Side extension width and the half the original house rule

The half-width rule compares your extension with the house as first built, not as it stands. Here is how to establish the baseline, the height limits and what to submit.

Read article →
Project Type Guides6 min read

Planning permission for a vehicle repair garage or MOT centre

Vehicle repair is normally Class B2, outside Class E, so the change of use needs permission. The decisive issues are noise, extraction, vehicle storage and waste oil.

Read article →
Constraints and Designations7 min read

National Parks and the statutory purposes test

In a National Park, conservation outweighs public enjoyment where the two conflict, and major development starts from refusal. Here is what an application has to show.

Read article →
Heritage and Archaeology6 min read

Shopfronts in conservation areas: what officers assess

Shopfront applications turn on whether the historic frame survives, where the fascia sits, how the sign is lit and what happens at night. Advertisement consent runs separately.

Read article →
Ecology, BNG and Protected Species7 min read

Breeding birds and vegetation clearance timing

Damaging an active nest is an offence for every wild bird species. Here is how the March to August constraint works in practice, and how to plan clearance around it.

Read article →
Templates, Checklists and Examples6 min read

A checklist for a section 73 variation application

Section 73 varies conditions and creates a new permission alongside the original. Here is the wording, the documents, the consultation scope and the CIL consequences.

Read article →
Project Type Guides7 min read

Planning permission for a gym in an industrial unit

Class B2 and B8 sit outside Class E, so a gym conversion needs permission. The decisive issues are employment land policy and impact noise from dropped weights.

Read article →
Constraints and Designations6 min read

Ramsar sites and how planning treats them

A Ramsar site is protected as a matter of national policy rather than by the Habitats Regulations directly. Here is how that changes screening, and the features reports keep missing.

Read article →
Heritage and Archaeology7 min read

Heritage at risk and optimum viable use

For a building at risk, the optimum viable use is the one causing least harm to significance. Here is how to rank uses, evidence marketing and calculate a conservation deficit.

Read article →
Ecology, BNG and Protected Species7 min read

Barn owls and development: survey and mitigation

Barn owls have no reliable closed season, so a barn conversion needs inspection before strip-out. Here is the protection, the survey evidence and the mitigation that works.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope