Articles – page 285

9090 articles
Transport, Highways and Parking7 min read

Agreeing a transport assessment scoping note

A scoping note agreed in writing with the highway authority fixes the study area, assessment years and methodology before any survey is commissioned. What to include and how to get it signed off.

Read article →
Constraints and Designations7 min read

Hazardous substances consultation zones explained

Applications near a hazardous installation or a high pressure pipeline are referred to the Health and Safety Executive. How the zones work, how advice is given and how to design around it.

Read article →
Heritage and Archaeology7 min read

Building preservation notices and spot listing

A building preservation notice treats an unlisted building as listed for six months while the Secretary of State decides. How the power works and how listing requests are made.

Read article →
Ecology, BNG and Protected Species7 min read

Biodiversity net gain on a section 73 application

A section 73 permission is a new permission, so the biodiversity gain condition has to be considered again. Which variations are exempt, when the metric must be rerun and how to sequence the work.

Read article →
London7 min read

Car-free development and residential parking policy

Car-free means no general residential parking plus a section 106 clause barring occupiers from parking permits. How PTAL drives the standard and what can still be argued.

Read article →
Templates, Checklists and Examples6 min read

A photographic viewpoint schedule for landscape work

Viewpoint photography is the evidence base for a landscape and visual assessment. The selection process, the recording conventions and the presentation that survives scrutiny.

Read article →
Householder Extensions and Conversions7 min read

Obscure glazing conditions and the levels that apply

Obscure glazing conditions are the standard council answer to an overlooking objection. The obscuration levels, the 1.7 metre opening rule and what happens when the glass is replaced.

Read article →
Project Type Guides7 min read

Planning permission for a cemetery or burial ground

A cemetery or churchyard extension stands or falls on the Environment Agency's groundwater assessment. What the separation criteria cover, how to time the ground investigation and what else the application needs.

Read article →
Transport, Highways and Parking7 min read

Choosing comparable TRICS sites for a trip rate

Trip rates stand or fall on the comparability of the surveyed sites behind them. Which filters change the answer, how much filtering is too much, and how to record the selection.

Read article →
Constraints and Designations7 min read

Common land, village greens and section 38 consent

Fencing, building or surfacing registered common land needs consent under section 38 of the Commons Act 2006, decided separately from planning permission. Deregistration, exchange land and green registration explained.

Read article →
Heritage and Archaeology6 min read

Urgent works and repairs notices explained

Section 54 urgent works stop a neglected listed building getting worse. A section 48 repairs notice opens the way to compulsory purchase. How both work and what an owner can do.

Read article →
Ecology, BNG and Protected Species6 min read

Watercourse units and river condition assessment

The statutory metric treats watercourses as their own module, so area habitat units cannot cover a watercourse shortfall. What a river condition assessment involves and how to programme it.

Read article →
London6 min read

Play space provision and the 10 square metre standard

The London Plan sets a minimum of 10 m² of playable space per child for schemes of ten or more homes. The child yield calculation, the age band distances and what boroughs count.

Read article →
Templates, Checklists and Examples6 min read

A template structure for a construction management plan

A construction management plan is a condition document. This is the section order officers read it in, from compound layout and routing to wheel washing, noisy operations and complaints.

Read article →
Householder Extensions and Conversions7 min read

Juliet balconies, balconies and the overlooking test

Class A of the GPDO excludes balconies, verandas and raised platforms, so a balcony on a house needs permission. A Juliet balcony with no floor to stand on is treated differently.

Read article →
Project Type Guides7 min read

Planning permission for a GP surgery or health centre

Health centres sit in Class E(e), so moving into an existing Class E unit is not development. The application turns on parking numbers, step-free access, waste storage and plant noise.

Read article →
Constraints and Designations6 min read

Water neutrality and how a scheme proves it

In a water neutrality area, total water use after development must be no greater than before. That means a water budget, a tight fittings specification and an offset delivered somewhere else in the same supply zone.

Read article →
Heritage and Archaeology7 min read

Certificates of lawfulness of proposed works

Unauthorised works to a listed building are a strict liability offence. A certificate of lawfulness of proposed works converts an officer's opinion into a binding confirmation that consent is not required.

Read article →
Templates, Checklists and Examples7 min read

A checklist for ownership certificates and notices

The ownership certificate is the shortest part of a planning application and the one most likely to invalidate it. Here is how to check title, choose the right certificate and serve notice properly.

Read article →
Project Type Guides6 min read

Planning permission for a school expansion

School expansions have strong policy support and two hard constraints: the playing field that Sport England protects, and the twenty minutes at the school gate that the highway authority worries about.

Read article →
Project Type Guides6 min read

Planning permission for extra care or retirement housing

Older persons accommodation sits on a line between a care home and a block of flats. Which side it falls determines affordable housing, levy liability and space standards, and the evidence is the care model.

Read article →
Project Type Guides6 min read

Planning permission for a hand car wash

Car washing sits outside the use classes, so almost every hand car wash needs planning permission. The application turns on where the wash water goes, how loud the equipment is and whether cars queue on the highway.

Read article →
Constraints and Designations6 min read

Mine entries, permits and coalfield planning conditions

Coalfield sites carry a second consent regime alongside planning. What a development high risk area means for foundation design, why drilling needs a permit, and how the conditions actually discharge.

Read article →
Constraints and Designations6 min read

National Landscapes and the duty on decision makers

The rebrand changed nothing in law, but the Levelling-up and Regeneration Act did. What the duty on public bodies now asks, and how a scheme in a National Landscape builds its landscape evidence.

Read article →