Articles – page 284

9092 articles
Heritage and Archaeology6 min read

Burial grounds and human remains in development

Planning permission does not authorise disturbing burials. The licensing regimes, notice periods, archaeological requirements and consultation that apply instead.

Read article →
Ecology, BNG and Protected Species6 min read

Wintering bird surveys and the October to March window

Wintering bird surveys run October to March and cannot be compressed. What they cover, how many winters are expected, and how disturbance is assessed.

Read article →
London6 min read

Circular Economy Statements: who needs one and what it covers

A London requirement rather than a national one. What a Circular Economy Statement covers, how it is evidenced, and how it must line up with the carbon assessment.

Read article →
Templates, Checklists and Examples6 min read

A structure for a design and access statement that works

How to organise a design and access statement so a case officer can lift the argument straight into the report, and what to leave out of it.

Read article →
Report Deep Dives6 min read

The tree constraints plan in a BS 5837 survey

Categories, root protection areas, crown spreads and shade, drawn before the layout. How the constraints plan is produced and what happens when it arrives too late.

Read article →
Transport, Highways and Parking6 min read

Designing cycle infrastructure to LTN 1/20

What LTN 1/20 expects from cycle routes inside and adjoining a development site, the drawings that evidence it, and how a departure from the standard is argued.

Read article →
Heritage and Archaeology6 min read

Archaeological archives and deposition charges

The archive stage runs long after the excavation ends. Ownership, museum acceptance, deposition charges and condition discharge, set out for a development budget.

Read article →
Templates, Checklists and Examples7 min read

A checklist for a travel plan with measurable targets

Baseline, targets, coordinator, monitoring and remedial triggers. The five parts of a travel plan that decide whether it survives past the decision notice.

Read article →
Ecology, BNG and Protected Species6 min read

Otters and holts in riverside development

Holts and couches are protected whether occupied or not, and otter cubs arrive in any month. What that means for survey timing, working distances and licensing.

Read article →
London6 min read

Whole life carbon assessments for referable schemes

What a whole life carbon assessment has to cover for a scheme referable to the Mayor, from module structure and benchmarks to the post-construction submission.

Read article →
Report Deep Dives6 min read

The mitigation hierarchy section of an ecological report

Avoid, mitigate, compensate is a sequence with a refusal at the end of it. Here is how each step is evidenced, secured and kept distinct from biodiversity net gain.

Read article →
Transport, Highways and Parking6 min read

Arguing for parking below the council standard

The four parts of a parking reduction case that highway officers accept, from measured accessibility and census car ownership to permit-free agreements.

Read article →
Heritage and Archaeology6 min read

Advertisement consent in a conservation area

Conservation area status cuts back the deemed consent classes that let shops sign up without applying. Here is what needs consent, what to submit and how illumination is judged.

Read article →
Ecology, BNG and Protected Species7 min read

Bats in trees: roost features and aerial inspection

Ground assessment, aerial inspection, suitability categories and licensing for bat roost features in trees, with the wording that separates no evidence from no bats.

Read article →
London6 min read

The energy hierarchy in a London energy statement

How to argue each stage of the London Plan energy hierarchy in an energy statement, including the monitoring duty that applicants most often underestimate.

Read article →
Templates, Checklists and Examples6 min read

A worked overshadowing test for a garden

A step by step sunlight on ground test for a rear garden, using the BRE 209 equinox criterion, with an illustrative calculation and the changes that recover a failing result.

Read article →
Report Deep Dives6 min read

The baseline section of a preliminary ecological appraisal

The baseline is the part of a preliminary ecological appraisal a council ecologist audits first. Here is what it has to record, and how limitations should be declared.

Read article →
Templates, Checklists and Examples6 min read

A scoping checklist for a noise survey brief

Most disputes about noise evidence come from a survey that measured the wrong thing in the wrong week. A checklist for briefing an acoustician before any equipment goes on site.

Read article →
Report Deep Dives6 min read

The residual risk section of a flood risk assessment

Residual risk is what happens when the mitigation fails. Breach assessment, warning lead times, the refuge or evacuation decision and the wording emergency planners accept.

Read article →
Householder Extensions and Conversions7 min read

Side return infill on a Victorian terrace

Side return infills are often permitted development, and the eaves height limit near the boundary decides the roof form. Daylight, party walls and build over agreements do the rest.

Read article →
Heritage and Archaeology7 min read

Amending or challenging a list entry

List entries can be corrected, amended or, rarely, removed. What evidence each route needs, why the description does not limit what is protected, and the risks of asking.

Read article →
Ecology, BNG and Protected Species7 min read

Net gain on outline permissions and phased schemes

Phased schemes need an overall biodiversity gain plan plus a plan for each phase. How baselines hold across a long build out, how units are allocated and what happens when phases are sold.

Read article →
London6 min read

Cycle parking standards for a London application

London Plan cycle parking standards are minimums by land use. How the residential calculation works, what the store dimensions have to allow for, and what boroughs add on top.

Read article →
Templates, Checklists and Examples7 min read

A checklist for a biodiversity gain plan submission

The gain plan is submitted after permission and before work starts. Which exemptions apply to small and self-build sites, what evidence the plan needs and why plans get refused.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope