Articles – page 283

9095 articles
Commercial Occupiers7 min read

Fitting out a gym on an upper floor: noise and vibration

A gym is Class E(d), so the use change is often free. The hard part is structure-borne impact noise from free weights, which BS 4142 does not measure.

Read article →
London7 min read

Protected vistas and the London View Management Framework

London protects designated views with mapped geometry rather than policy wording. If your site sits in an assessment area, the framework sets your upper floors before design begins.

Read article →
Templates, Checklists and Examples6 min read

A cover letter structure for a planning submission

The validation officer reads it first and the case officer second. A two-page letter with a proper document schedule saves days on the determination clock.

Read article →
Report Deep Dives7 min read

The viewpoint assessment section of a townscape appraisal

The matrix is an aid to reasoning, not a calculator. A viewpoint section that publishes its component ratings and explains each judgement is far harder to dislodge at appeal.

Read article →
Heritage and Archaeology7 min read

Industrial heritage: converting mills and warehouses

A scheme that keeps the elevations and strips out the cast iron columns can cause more harm than one that alters the facade. Structure and process evidence carry the significance.

Read article →
Council Guides7 min read

Tracking a planning application on the public register

Article 40 of the Development Management Procedure Order sets out what every council must keep on its planning register. Knowing that tells you what to ask for when the website falls short.

Read article →
Transport, Highways and Parking8 min read

Dropped kerbs and vehicle crossover applications

The kerb needs a section 184 vehicle crossing licence. The access and the driveway may also need planning permission, depending on road classification and how the surface drains.

Read article →
Ecology, BNG and Protected Species7 min read

Lighting design that protects bats and invertebrates

Lighting a roost access point can amount to disturbance of a protected species whatever the ground-level lux. The evidence councils want is vertical illuminance at the habitat features.

Read article →
Commercial Occupiers7 min read

A day nursery in a residential street: the noise question

A nursery in a house needs full permission, and the decision turns on outdoor play noise. BS 4142 does not apply to sound from people, so the assessment has to be constructed differently.

Read article →
London7 min read

Which applications are referable to the Mayor of London

Referral is automatic on the facts set out in the Mayor of London Order 2008. The borough still decides, but it cannot issue a decision without going through the Mayor twice.

Read article →
Templates, Checklists and Examples7 min read

A neighbour consultation record template for applicants

A two-page record of who you contacted, what they said and what you changed gives the case officer something to quote. It also shows where voluntary engagement is the wrong move.

Read article →
Report Deep Dives7 min read

The daylight results section of a BRE 209 assessment

BRE 209 gives guidelines, not standards. What decides an appeal is which rooms were assessed, whether daylight distribution was tested, and how honestly the failures are reported.

Read article →
Transport, Highways and Parking7 min read

Construction traffic routing, wheel washing and hours

Highway authorities condition construction traffic rather than refusing over it. The route evidence, the wheel wash detail and the pre-construction survey are what get the condition discharged first time.

Read article →
Heritage and Archaeology7 min read

Converting historic farm buildings sensitively

The significance of a farmstead usually lies in the plan form and the relationship between ranges, not in one barn. That changes how openings, yards and subdivision are judged.

Read article →
London7 min read

Mayoral CIL: bands, rates and when it becomes payable

The Mayor charges a levy on new floorspace across all of Greater London, on top of the borough charge. The banding, the six-month lawful use deduction and the commencement notice decide what you actually pay.

Read article →
Ecology, BNG and Protected Species7 min read

How long an ecology survey stays valid for planning

Habitat data older than about two years and species data older than about 18 months will be queried. An update walkover by the original ecologist is usually the proportionate answer.

Read article →
Commercial Occupiers7 min read

Putting a dental practice into a vacant shop unit

Shop and medical uses both sit in Class E, so the change of use itself needs no permission. The consents you do need are for the compressor, the extract duct, the shopfront and the signage.

Read article →
Report Deep Dives7 min read

The sound insulation section of a noise impact assessment

The facade section of a noise report has to prove 35 dB LAeq in living rooms and 30 dB LAeq at night with the windows shut. Here is what the calculation needs and where these sections usually fail.

Read article →
Templates, Checklists and Examples7 min read

Outline planning application checklist: matters to reserve

Access, appearance, landscaping, layout and scale are the five matters you can reserve. Which you hold over decides what you must draw now, what conditions you get, and how much flexibility the permission keeps.

Read article →
London6 min read

The sustainable drainage hierarchy in London

Each step above your chosen drainage solution has to be rejected on evidence. The London hierarchy in order, and the five things a borough officer checks.

Read article →
Templates, Checklists and Examples6 min read

A worked example of a drainage hierarchy decision

An illustrative infiltration test calculation, the evidence needed to rule infiltration out, and the record a lead local flood authority expects on a small site.

Read article →
Report Deep Dives6 min read

The construction phase section of an air quality assessment

Risk categories, receptor distances, plant emission standards and monitoring. What the construction section of an air quality assessment has to show, and how templates give themselves away.

Read article →
London6 min read

Air Quality Neutral and Air Quality Positive explained

One is a benchmark calculation, the other a design process for large schemes. What each requires, what evidence boroughs expect and where assessments fail.

Read article →
Templates, Checklists and Examples6 min read

A checklist before submitting a prior approval application

Prior approval confirms specified matters for development already permitted by the Order. Here is what to establish before submitting, and how deemed consent works.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope