Articles – page 316

8850 articles
Use Classes and Change of Use7 min read

Farm shop: Class E, F2 or sui generis

A farm shop can be ancillary to farming, Class E retail, Class F2 or partly sui generis. The proportion of goods from the holding usually decides which, and conditions police it.

Read article →
Permitted Development7 min read

The 56 day prior approval deadline and deemed consent

If the council does not notify you within 56 days, you may build in accordance with the details submitted. What makes the clock start, what deemed consent carries and how to prove it.

Read article →
Planning Process7 min read

Delegated decisions versus planning committee

Most applications are decided by officers under a scheme of delegation. What sends one to committee instead, how councillor call-in works, and how to prepare for a members' decision.

Read article →
Comparisons6 min read

Construction Management Plan or Construction Traffic Plan

A traffic plan answers the highway authority, a management plan answers environmental health. What goes in each, and the four checks that stop them contradicting each other.

Read article →
Householder Extensions and Conversions7 min read

Eaves, ridge heights and the 2 metre boundary rule

Three height limits govern most permitted development rear extensions, and all of them turn on where you measure from. Sloping ground, flat roof build-ups and made-up levels explained.

Read article →
Daylight, Sunlight and Amenity6 min read

Average daylight factor and where it still applies

The 1, 1.5 and 2 per cent daylight factor targets came from a withdrawn standard, yet ADF still appears in adopted policies and prior approval assessments. What it measures and when to use it.

Read article →
Which Reports Do I Need6 min read

Reports needed for a hot food takeaway

Hot food takeaways sit outside every use class. The extraction and odour scheme, plant noise assessment, refuse arrangements and highway evidence that a submission needs.

Read article →
Report Deep Dives6 min read

The energy hierarchy sections of an Energy Statement

An Energy Statement is four calculations reported in sequence. What each hierarchy stage must demonstrate, how to report emissions at each step, and what the monitoring stage commits you to.

Read article →
Planning Law Updates6 min read

Electric vehicle charge points and permitted development

Wall boxes and car park upstands are covered by Part 2, subject to height and siting limits. The harder consents are the highway licence, Part S and accessible charging design.

Read article →
Use Classes and Change of Use7 min read

Places of worship in Class F1: the change of use route

Public worship sits in Class F1 alongside schools and public halls. What that means when the building you have found is a shop or a warehouse, and how the application is assessed.

Read article →
Permitted Development7 min read

Ground and water source heat pumps under Part 14

The planning rights for ground and water source heat pumps are the easy part. Abstraction licences, environmental permits, designated land and ground disturbance are what actually hold a rural scheme up.

Read article →
Planning Process7 min read

The 21 day consultation period and who is notified

Publicity on a planning application runs for at least 21 days. Which method applies to which application, who gets a letter, what happens to late comments and how to hear about the next one.

Read article →
Comparisons6 min read

Whole Life Carbon or Circular Economy Statement

A whole life carbon assessment counts emissions by module. A circular economy statement tracks material flows and diversion. Where they share a bill of materials and where they diverge.

Read article →
Householder Extensions and Conversions7 min read

Larger home extensions: the neighbour consultation scheme

The larger home extension route allows 6 or 8 metre single storey rear extensions subject to neighbour consultation. What to notify, what the council may consider, and how to handle an objection.

Read article →
Which Reports Do I Need7 min read

Reports needed for an office to residential conversion

Under Class MA the prior approval matters set the evidence list. What the council can and cannot consider, the reports each matter needs, and what you still have to do after approval.

Read article →
Report Deep Dives7 min read

Survey design in a Parking Survey

A parking survey answers one question: is there spare kerb space when demand peaks? How to set the survey area, time the counts and measure capacity so the highway authority accepts it.

Read article →
Planning Law Updates7 min read

Solar panels on commercial roofs: the permitted development limits

Commercial rooftop solar is permitted development under Class J of Part 14, subject to prior approval of design and external appearance. The limits, the exclusions and what actually sets the programme.

Read article →
Daylight, Sunlight and Amenity7 min read

Sun on ground: testing a garden at the equinox

The sun on ground test asks whether half an amenity area still gets two hours of sun on 21 March. How to define the area, build the model and present the result.

Read article →
Use Classes and Change of Use7 min read

Retail to gym under Class E: what the council still controls

Retail and indoor fitness both sit in Class E, so the use change is free. The plant, extraction, noise, shopfront and old conditions on the unit are a different matter.

Read article →
Permitted Development7 min read

Part 11 demolition: prior approval of method and restoration

Part 11 permits demolition subject to prior approval of the method and the restoration of the site. What to submit, how the 28 day period works, and the Building Act notice that runs alongside.

Read article →
Planning Process7 min read

What happens in the eight weeks after validation

The eight week clock starts at validation, not submission. What the case officer is doing each week, when your input still helps, and why applications slip past the target date.

Read article →
Comparisons7 min read

Energy Statement or Sustainability Statement: which is which

An Energy Statement proves a number against the Part L baseline. A Sustainability Statement answers adopted policy. Where the line falls and how to keep one set of figures across the pack.

Read article →
Householder Extensions and Conversions7 min read

Garden offices and the incidental use test

A garden office is permitted development only while its use stays incidental to the house. Where the line falls, what tips a home business over it, and how to get the position confirmed.

Read article →
Which Reports Do I Need8 min read

Reports needed for development in Flood Zone 3

Flood Zone 3 decides your report list before you design anything. What the flood risk assessment, sequential test and exception test each have to prove, and the conditions to expect.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope