Articles – page 315

8860 articles
Which Reports Do I Need7 min read

Reports needed for a ground mounted solar farm

Solar farm refusals cite loss of best and most versatile land and landscape harm. Here is the report pack that answers both, plus the technical work consultees ask for.

Read article →
Daylight, Sunlight and Amenity7 min read

Single aspect north facing flats and amenity policy

No rule bans single aspect north facing flats, which is why they are argued on judgement. Here is how to reduce the count and evidence the units that remain.

Read article →
Use Classes and Change of Use7 min read

Sui generis after 2020: the full list and what it means

Pubs, takeaways, cinemas and live music venues left the use class system in September 2020. Here is the full sui generis list and what it means for a change of use.

Read article →
Data Tools How-To7 min read

Using MAGIC to check designations around a site

Twenty minutes on the Defra MAGIC map tells you which statutory designations touch your site, and which datasets you still have to check somewhere else.

Read article →
Refusals and Appeals7 min read

Costs awards on planning appeals for unreasonable behaviour

An appeal costs award turns on unreasonable behaviour that caused wasted expense, not on who won. Here is how inspectors apply the test and how to build the application.

Read article →
Planning Process6 min read

Withdrawing a planning application and what it costs you

Withdrawal is a one line letter, but it ends the appeal right and the fee is normally spent. Here is how to weigh it against taking the refusal.

Read article →
Householder Extensions and Conversions6 min read

Solar panels on a house under Part 14 of the GPDO

Class A of Part 14 allows solar panels on most houses, but the 200 millimetre projection limit and the protected land wall restriction catch a lot of installations.

Read article →
Which Reports Do I Need7 min read

Reports needed for a self storage facility

Self storage applications turn on the use class claimed, the employment land case and the traffic and noise customers generate. Here is the document pack councils expect.

Read article →
Report Deep Dives7 min read

Waste Management Strategy: storage, collection and swept paths

A Waste Management Strategy is an operational document about the building in use. Here is how to size the store, set the carry distance and prove the refuse vehicle can reach it.

Read article →
Daylight, Sunlight and Amenity8 min read

Assessing daylight inside your own proposed flats

The neighbour case argues from a baseline. The internal case has none. Here is how to test the flats you are proposing, and how to report the rooms that fall short.

Read article →
Use Classes and Change of Use8 min read

Conditions that survived the 2020 use class reforms

Class E released units that were unconditioned. It released almost nothing that was tied by condition, and that is usually discovered after an offer is made.

Read article →
Data Tools How-To7 min read

Finding the right climate change allowance for a catchment

Every climate change figure in a flood risk assessment should trace back to a named table on a stated date. Here is how to find the catchment, epoch and band.

Read article →
Planning Process8 min read

The planning register and how to read an application file

The register is a statutory record under article 40 of the 2015 Order. Here is how to search it, what councils redact and why, and how to read a live case file.

Read article →
Comparisons8 min read

Contamination Phase 1 or Phase 2: what triggers the dig

Phase 1 asks whether a source, a pathway and a receptor connect. If they plausibly do, Phase 2 goes into the ground. The trigger decides a five-figure cost.

Read article →
Householder Extensions and Conversions7 min read

Juliet balconies against full balconies in Class A terms

The line is whether there is somewhere outside the wall to stand. Guarding across a first-floor opening is usually permitted development, and a balcony always needs permission.

Read article →
Which Reports Do I Need8 min read

Reports needed for a place of worship

A whole week of activity in one or two hours drives every objection. Here is the attendance, parking, dispersal and accessibility evidence a worship application needs.

Read article →
Report Deep Dives8 min read

The construction phase sections of a management plan

A construction management plan gets approved on its numbers. Vehicle movements by phase, hours by activity, dust trigger levels and predicted noise at the nearest façade.

Read article →
Daylight, Sunlight and Amenity8 min read

Rooms lit only by a rooflight and the daylight tests

A rooflight has no vertical plane, so the familiar BRE tests do not apply. Here is the assessment route for top-lit rooms, and the modelling assumptions reviewers look for.

Read article →
Use Classes and Change of Use7 min read

Dog day care and grooming: which use class applies

The Use Classes Order says nothing about animals. Working out which activity you actually run, grooming or day care or boarding, decides whether you need permission and what evidence goes with it.

Read article →
Data Tools How-To7 min read

Checking surface water flood risk on the long term service

Surface water risk never appears on the Flood Map for Planning. Here is how to read the bands, get the depth and velocity layers, and use the result in a householder drainage statement.

Read article →
Planning Process8 min read

Agricultural holdings notices on a planning application

The council cannot entertain a farm application until the agricultural holdings certificate is provided. Who counts as a tenant, how to serve notice, and what a tenant can actually do.

Read article →
Comparisons7 min read

LVIA or Townscape and Visual Impact Assessment

Landscape and townscape assessments share one methodology and differ in four places: the baseline, the receptors, how viewpoints get agreed, and what cumulative means.

Read article →
Householder Extensions and Conversions8 min read

Loft conversions in a bungalow and the volume trap

Class B allows no part of the roof to exceed the existing ridge, and gives 50 cubic metres in total. On a wide hipped bungalow, two hip to gable ends and a dormer go straight past it.

Read article →
Which Reports Do I Need7 min read

Reports needed for a gym in a former retail unit

A shop is Class E(a) and a gym is Class E(d), so the use change is not development. The work is in the acoustics of dropped weights, the plant, the car park and the hours.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope