Articles – page 335

8692 articles
Planning Process7 min read

Habitats regulations assessment: what an applicant supplies

Under the Conservation of Habitats and Species Regulations 2017 the local planning authority is the competent authority. Your job is to give it enough evidence to reach a lawful conclusion.

Read article →
Permitted Development7 min read

Part 6 agricultural development and the prior notification

Schedule 2 Part 6 of the GPDO gives farms two different sets of rights depending on the size of the unit. Both need a prior notification before most building work starts.

Read article →
Professionals and Qualifications6 min read

Checking a technical report before it is submitted

Most defects in a technical report are found in twenty minutes by someone who reads the conclusion before the summary. Here is the order to read in and what to send back.

Read article →
Costs, Fees and Budgeting6 min read

Discharge of conditions fees and how to reduce them

Conditions are discharged by application, and the fee is charged for each request regardless of how many conditions it covers. Which changes how you should bundle them.

Read article →
Project Type Guides7 min read

Planning permission for a purpose-built shared house

Building a shared house from scratch takes you outside Class C4 and outside permitted development. Here is what the council will test and what evidence to file with the application.

Read article →
Planning Process7 min read

CIL liability notices, assumption and the surcharges

The Community Infrastructure Levy catches self-builders on procedure rather than price. Here is the order the notices have to follow, what each failure costs, and how to challenge a determination.

Read article →
Costs, Fees and Budgeting7 min read

The free go: when a resubmission carries no fee

The fee regulations exempt one further application from the fee where the applicant, the site and the character of development are unchanged and twelve months have not passed. Here is exactly what that covers.

Read article →
Project Type Guides7 min read

Planning permission for a veterinary practice

A veterinary practice is usually a Class E use, which makes the use class the easy part. The application turns on animal noise, anaesthetic extract, clinical waste storage and out-of-hours access.

Read article →
Permitted Development7 min read

Part 20 upward extension of blocks of flats

Airspace development on a detached block of flats is permitted development subject to prior approval, but ownership, structure and fire safety decide whether a scheme is deliverable. Here are the limits and the practical gates.

Read article →
Professionals and Qualifications7 min read

Writing a scope of works that gets the report you need

A scope of works that names the deliverable, the standard, the revision rounds and the exclusions makes fee proposals comparable. Here is how to write one and how to normalise the quotations that come back.

Read article →
Costs, Fees and Budgeting6 min read

Building regulations charges compared with planning fees

Planning permission and building regulations approval are separate consents with separate charging structures. Here is how each is priced, where the routes differ, and the costs that sit outside both.

Read article →
Planning Process6 min read

Unilateral undertaking or section 106 agreement

A unilateral undertaking and a section 106 agreement do the same legal job, but only one needs the council's signature. Here is how to choose, who has to be a party, and how to draft so the deed completes quickly.

Read article →
Project Type Guides7 min read

Planning permission for a natural burial ground

A natural burial ground is a sui generis change of use, and the Environment Agency's groundwater separation distances decide more applications than landscape or traffic ever do. Here is how to test a site and build the case.

Read article →
Permitted Development6 min read

Class ZA demolition and rebuild: the route nobody uses

Class ZA permits demolition and residential rebuild through prior approval, but the replacement is confined to the old footprint and the building must have stood empty for six months. Here is what qualifies and when a full application is better.

Read article →
Professionals and Qualifications6 min read

Who can produce a whole life carbon assessment

Whole life carbon assessment has no licensing regime, so the report itself has to demonstrate competence. Here is what the RICS methodology requires, why the quantities matter most, and how to review an assessment for scope gaps.

Read article →
Costs, Fees and Budgeting6 min read

What a refusal costs once redesign is added in

A refused householder application costs far more than the fee once redesign, repeated surveys and months of delay are counted. Here is how the bill builds and how to decide between resubmitting and appealing.

Read article →
Planning Process7 min read

Certificates of lawful existing use: evidence that persuades

Section 191 certificates are decided on fact and law, with the burden on the applicant. Here is how the immunity periods changed in 2024, which evidence carries weight, and how to deal with the thin years.

Read article →
Project Type Guides7 min read

Planning permission for a co-living scheme

Large-scale purpose-built shared living sits outside every use class, which gives councils wide discretion over the standards applied. Here is how to frame the classification, the amenity case and the obligations.

Read article →
Permitted Development6 min read

Class R: agricultural buildings to flexible commercial use

Class R turns redundant agricultural buildings into storage, offices, shops or workshops through prior approval rather than a planning application. Here are the current limits, the four matters the council can consider, and the trap around Class Q.

Read article →
Professionals and Qualifications6 min read

CIEEM membership grades explained for ecology reports

Councils asking for a suitably qualified ecologist usually mean Full CIEEM membership. Here is what each grade covers, where Chartered Ecologist status fits, and why the survey licence matters more than the post-nominals.

Read article →
Costs, Fees and Budgeting7 min read

Judicial review costs and the environmental cost cap

Judicial review is the only route to challenge a granted planning permission, and cost exposure decides most cases before the law does. Here is how the Aarhus cap works, what it leaves exposed and what to try first.

Read article →
Refusals and Appeals7 min read

Refused on flood risk: the sequential test at appeal

Sequential test failures are decided before the merits of a scheme are ever weighed. Here is how to define the search area, evidence site availability, answer both limbs of the exception test and judge the appeal prospects.

Read article →
Planning Process6 min read

Time limits on permissions and how to keep one alive

Section 91 gives most permissions three years to begin, section 92 sets a two-stage clock for outline schemes, and renewal applications no longer exist. Here is how to protect a permission before it expires.

Read article →
Project Type Guides7 min read

Planning permission for a care home or extra care scheme

The C2 classification decides more about a care scheme than the design does, from affordable housing policy to CIL. Here is how to evidence the use class, the overheating criteria for vulnerable occupants and the parking case.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope