Articles – page 340

8439 articles
Transport, Highways and Parking6 min read

Visibility splays: where x and y distances come from

The x distance is a setback, the y distance comes from measured traffic speeds. How to evidence a splay that the highway authority will accept.

Read article →
Which Reports Do I Need6 min read

Which reports for works to a Grade II listed house

Two consents, one evidence pack. What a Grade II listed house application needs, how to record significance properly, and the curtilage rule that catches owners out.

Read article →
Glossary6 min read

Nutrient neutrality vs water neutrality: two different rules

Two constraints, one legal route. What water neutrality and nutrient neutrality each measure, how the mitigation differs, and the evidence councils ask for.

Read article →
Council Guides6 min read

Heritage at risk registers and your listed building

A local heritage at risk entry is evidence you can use. What councils record, how the deliberate neglect rule limits it, and the six documents a repair-led scheme needs.

Read article →
Transport, Highways and Parking6 min read

Scoping a Transport Assessment with the highway authority

A scoping note agreed in writing sets the cost of the whole transport evidence base. What to propose, how to fix the committed development list, and what to do when the authority does not reply.

Read article →
Which Reports Do I Need6 min read

Which reports for a rear extension in a conservation area

Conservation area status changes the evidence you must supply for a rear extension more than it changes the size limits. Here is the pack that gets validated first time.

Read article →
Glossary6 min read

Prior notification: the 28 day agricultural and demolition route

Prior notification tells the council what you intend to build or demolish and gives it 28 days to require approval of a short list of details. Here is how the agricultural and demolition routes work.

Read article →
Council Guides6 min read

Construction working hours conditions and site controls

Construction hours are set by condition, not by national law. What the standard wording covers, which management plans sit alongside it, and how to get an unworkable restriction varied.

Read article →
Council Guides6 min read

Water efficiency policy: 110 litres per person per day

Part G sets 125 litres per person per day, and a planning condition can tighten it to 110. Here is how the standard is adopted, calculated and discharged.

Read article →
Which Reports Do I Need6 min read

Reserved matters on a self-build plot with outline consent

After outline consent come two separate applications: reserved matters and discharge of conditions. Here is what each needs, and the CIL paperwork you cannot fix later.

Read article →
Glossary6 min read

Nationally significant infrastructure and the DCO route

Power stations, motorways and reservoirs are decided nationally, not by the council. Here is how the development consent order process runs and the two dates that matter.

Read article →
Council Guides6 min read

EV charging requirements for new homes in planning

Charge points for new homes come from building regulations, not planning, but local policies often ask for more. Here is what to design, condition and draw.

Read article →
Which Reports Do I Need6 min read

Which reports student accommodation schemes need

PBSA sits outside the use classes, so every scheme is judged on its merits. Here is the evidence base, from car-free management to daylight in single-aspect study bedrooms.

Read article →
Glossary6 min read

The retail impact test and the 2,500 square metre hurdle

Above the floorspace threshold, an out-of-centre proposal has to show it will not harm a defined centre. Here is what the test asks and how the arithmetic works.

Read article →
Council Guides6 min read

Space standards: which councils apply the NDSS

The space standard only applies where a council has adopted it, except on permitted development schemes where it is national. Here are the figures and how to draw them.

Read article →
Which Reports Do I Need6 min read

Which reports a 60-bed care home application needs

A 60-bed home is major development on floorspace and site area, not on dwelling numbers. Here is the evidence base, and the two work streams that set the submission date.

Read article →
Glossary6 min read

Employment land safeguarding and what it stops you doing

Safeguarding policies resist the loss of employment floorspace and run on marketing evidence. Here are the tests, the Class MA gap, and the assessment that answers them.

Read article →
Council Guides6 min read

Flats above shops: the amenity and access tests

Councils want empty space above shops in use, then refuse schemes on access, noise and amenity. Here is what those policies ask for and how to answer them on the drawings.

Read article →
Which Reports Do I Need7 min read

Which reports a 20 ha solar farm application needs

A 20 hectare array is Schedule 2 development, so screening and the soil survey come before the layout. Here is the evidence base and the order to commission it in.

Read article →
Glossary6 min read

Hot food takeaway: why it sits outside the use classes

Hot food for consumption off the premises is a use class of its own. Here is what that means for changing use, and the extraction, odour and health policy that decide the application.

Read article →
Council Guides6 min read

Garden room and outbuilding rules beyond the GPDO

A garden office is incidental. A garden room with a bed and a kitchen is not. Here are the Class E limits, the local policies that decide applications, and how to get certainty.

Read article →
Which Reports Do I Need6 min read

Which reports a telecoms mast prior approval needs

A Part 16 submission is not a planning application. Here is what the council may consider, what the ICNIRP declaration does, and the visual evidence that decides the 56 days.

Read article →
Glossary6 min read

Class E: what one use class now covers

Movements inside Class E are not development, so a shop can become a gym without permission. Here are the sub-classes, the uses that dropped out, and the conditions that still bite.

Read article →
Council Guides6 min read

Annexe planning policy: ancillary use and the condition

An annexe is either part of your house or a new dwelling. Here is the test councils apply, the condition they attach, and the design decisions that settle the answer.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope