Articles – page 348

8382 articles
Project Type Guides7 min read

Equestrian planning permission: stables, menage and horses

Section 336 treats grazing as agriculture, but horses kept for riding are a different use of the land. That distinction decides most equestrian applications.

Read article →
Glossary6 min read

Air Quality Management Area: what it means for you

An AQMA is a formal declaration that an air quality objective is not being met. Inside one, expect an assessment requirement and close scrutiny of your traffic assumptions.

Read article →
Council Guides6 min read

Basement planning policy: what London boroughs require

There is no basement policy in the London Plan. The controls come from borough local plans and basement SPDs, and they shape the excavation before they shape the design.

Read article →
Householder Extensions and Conversions7 min read

Outbuilding size and height limits under Class E

Six numbers and one condition decide whether a garden building is permitted development. Here is how to calculate curtilage coverage, which height limit applies to which roof, and the traps in conservation areas.

Read article →
Report Deep Dives7 min read

Sequential and exception tests: what each one must prove

Two separate documents answering two separate questions. Here is how to define the search area, evidence reasonably available sites, and address both limbs of the exception test.

Read article →
Project Type Guides7 min read

Caravan and residential park home site planning permission

Permission authorises the use, a site licence regulates the layout, and the licence cannot be issued without the permission. Here is how the two consents fit together and why flood risk decides so many rural caravan applications.

Read article →
Glossary7 min read

Agent of change: who pays to mitigate the noise conflict

Build flats next to a venue and the flats carry the mitigation. Here is where the principle sits in national and London policy, what mitigation it buys, and the three limits operators should know about.

Read article →
Council Guides7 min read

How to object to a neighbour's planning application

An objection counts when it raises a material consideration, ties it to an adopted policy and gives the officer evidence. Here is what is material, what is not, and how to write the letter.

Read article →
Householder Extensions and Conversions6 min read

The 45-degree rule and how officers apply it to extensions

The 45-degree line is a screening device in council design guides, not national policy. Knowing how it is drawn tells you which part of the extension has to move.

Read article →
Report Deep Dives7 min read

VSC, NSL and ADF in a Daylight and Sunlight Assessment

VSC answers the blocked-window objection, no sky line answers the dark-back-room objection, and internal illuminance answers whether your own flats will be liveable.

Read article →
Project Type Guides7 min read

Creating a new vehicular access onto a rural lane

A rural access application turns on whether a driver emerging from the gateway can see far enough along the lane. The surfacing, gates and hedge all follow from that.

Read article →
Glossary6 min read

Source Protection Zone: groundwater and your site

Source protection zones are modelled on groundwater travel time to a drinking water borehole. They rarely stop a scheme, but they often rewrite the drainage strategy.

Read article →
Council Guides6 min read

SANG checks to make before you buy land

Zone of influence boundaries live in council strategy documents, not national datasets. Three questions answered before exchange will tell you whether a plot is buildable.

Read article →
Householder Extensions and Conversions7 min read

Garden room or separate dwelling: the ancillary test

A garden room stops being permitted development once someone can live in it independently. Here is the section 55 planning unit test, the Class E limits, and how councils tie an annexe to the main house.

Read article →
Report Deep Dives7 min read

Writing the archaeological desk-based assessment baseline

The baseline decides whether a desk-based assessment survives review by the county archaeologist. Here are the sources, the search radius, how to read disturbance, and how to turn data into a testable statement of potential.

Read article →
Project Type Guides7 min read

Holiday let planning permission and occupancy conditions

Holiday letting may or may not need permission, depending on intensity and location. Here is the section 55 test, the London 90-night exception, the evidence councils look for and the conditions to expect.

Read article →
Glossary7 min read

Annual probable sunlight hours: the BRE 209 sunlight tests

APSH, the winter component and the two-hour equinox test on gardens decide most sunlight arguments. Here is what each one measures and how to read a sunlight table without being misled.

Read article →
Council Guides7 min read

Planning committee or delegated decision: how yours is decided

Most applications are decided by officers under delegated powers. Here is where the scheme of delegation lives, what pushes a case to committee, and how call-in and public speaking actually work.

Read article →
Householder Extensions and Conversions7 min read

Side extensions on terraced and end-terrace houses

A mid-terrace house has no side elevation to build beyond. An end-terrace does, and then three Class A exclusions decide whether anything is permitted development.

Read article →
Report Deep Dives7 min read

Sun-on-ground and transient overshadowing methods compared

One method has a threshold, the other has a story. Choosing between sun-on-ground testing and a transient shadow sequence depends on the objection you are answering.

Read article →
Project Type Guides7 min read

Basement extension planning permission under a house

Digging out a basement under an existing house is an engineering operation, and Class A rarely covers it. Here is what councils ask for and in what order.

Read article →
Glossary6 min read

SANG: suitable alternative natural greenspace

A SANG gives new residents somewhere to walk instead of a protected heath or estuary. If your site sits in a zone of influence, a contribution or a bespoke SANG is not optional.

Read article →
Council Guides7 min read

Nutrient neutrality catchments: what your council will ask for

In affected catchments a council cannot grant permission for new overnight accommodation until a nutrient budget shows neutrality. Here is what that means for a small site.

Read article →
Council Guides8 min read

Green Belt councils: how to plan an extension that will pass

In the Green Belt an extension is acceptable in principle only if it is not a disproportionate addition to the original building. This explains how councils measure that, what happens to outbuildings, and what a Planning Statement must show.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope