Articles – page 35

9583 articles
Heritage and Archaeology7 min read

Converting a historic farmstead: the cartshed problem

In a traditional farmstead the barn usually converts well and the cartshed does not. The open elevation is the heritage interest, and glazing it is the harm.

Read article →
Viability, Obligations and Commercial6 min read

Indexation of financial contributions in planning obligations

An indexation clause can add a material sum between signing a section 106 agreement and paying the contribution. The base date and the index chosen matter more than the headline figure.

Read article →
Flood, Drainage and SuDS7 min read

Safe access depth and velocity thresholds in flood design

Safe access and dry access are different tests. The first is a hazard rating derived from depth, velocity and a debris factor; the second means the route never floods at all.

Read article →
Permitted Development7 min read

Part 4 Class D: temporary flexible use of commercial premises

Class D of Part 4 gives a one-off temporary flexible use right for qualifying commercial premises. It needs notification, it does not change the lawful use, and it cannot be used twice on the same site.

Read article →
Glossary6 min read

Section 215 notices for untidy land

Section 215 of the Town and Country Planning Act 1990 lets a council require steps to remedy land whose condition harms local amenity, with no breach of planning control needed.

Read article →
Commercial Occupiers7 min read

Opening a butcher with an on-site cutting room

Retail butchery sits in Class E, but a cutting room adds night-time refrigeration noise, animal by-product storage and drainage questions that an ordinary shop application never has to answer.

Read article →
Wales, Scotland and Northern Ireland6 min read

Welsh language impact and when an assessment is needed

Wales only. The Welsh language is a statutory material consideration in planning decisions, and larger housing schemes in Welsh-speaking areas are routinely asked for a linguistic impact assessment.

Read article →
Residential Scale Thresholds6 min read

Residential EIA screening at 150 homes or five hectares

Residential schemes become Schedule 2 development above 150 dwellings or five hectares, and the thresholds disappear entirely in a sensitive area. Here is how to handle screening.

Read article →
Householder Extensions and Conversions6 min read

Garden rooms used for business: where the line falls

The planning risk in a garden office is rarely the building. It is the use. Here is how councils judge whether business activity in a garden room has become a material change of use.

Read article →
Residential Scale Thresholds7 min read

Water neutrality and what it does to scheme size

In an affected supply zone, demand offsetting rather than a unit threshold decides how many homes a site can support. Where the calculation bites and what it costs.

Read article →
Householder Extensions and Conversions9 min read

Loft conversions in a terrace: party walls and escape

The planning limits are the easy part. Party wall notices on two sides and the protected stairway requirement are what shape a mid-terrace loft conversion.

Read article →
Glossary7 min read

M4(2) and M4(3) optional requirements in policy

Optional accessibility requirements bite only through a planning condition. The three Part M categories, the evidence a policy needs and the design consequences.

Read article →
Noise, Air, Odour and Light8 min read

Noise monitoring conditions and who pays for them

A noise monitoring condition needs a metric, position, period, standard, correction and limit. What is lawful, who pays, and how to negotiate one that works.

Read article →
Transport, Highways and Parking7 min read

Coach, taxi and drop-off at a visitor attraction

Daily trip totals tell a highway officer nothing about an attraction. How to design coach, taxi and accessible drop-off around the arrival and departure peaks.

Read article →
Heritage and Archaeology8 min read

Rebuilding a listed boundary wall after collapse

Make safe, record, then apply. How section 1(5) brings a garden wall into the listing, what the urgent works defence allows and what the specification must say.

Read article →
Viability, Obligations and Commercial7 min read

Cascade clauses when no provider takes the units

Where no registered provider bids, a cascade clause steps the obligation down through tenures to a payment. The marketing evidence authorities actually accept.

Read article →
Flood, Drainage and SuDS7 min read

Matching the climate change allowance to lifetime

Residential development is assessed over at least 100 years, which fixes the epoch. How to choose the allowance category, separate river flow from rainfall and record the lookup.

Read article →
Permitted Development7 min read

Part 2 Class B: forming a new access without permission

Class B of Part 2 is a supporting right, not a free-standing one. The classified road exclusion, the connection test and the separate highway licence explained.

Read article →
Residential Scale Thresholds7 min read

Nutrient neutrality: occupancy and bedroom mix

In an affected catchment the mitigation requirement follows occupancy by bedroom number. Where the budget inputs come from and which design changes reduce them.

Read article →
Planning Process7 min read

Serving notice on a dissolved or insolvent company

Ownership notice on insolvent or dissolved company land: the Companies House checks, service on administrators, bona vacantia and the unknown owner publicity route.

Read article →
Householder Extensions and Conversions7 min read

Replacing windows in a flat or maisonette

Flats and maisonettes have no householder permitted development rights. Whether window replacement needs permission turns on the section 55 test, and the lease matters too.

Read article →
Glossary7 min read

TPO exemptions for dead or dangerous trees

The 2012 Regulations dropped dying from the exemptions. What dead and immediate risk of serious harm actually mean, the notice periods and the replacement duty.

Read article →
AI and Planning7 min read

National development management policies: status now

The Levelling-up and Regeneration Act 2023 created national development management policies but none have been designated. How to cite policy now and structure for the change.

Read article →
Energy, Sustainability and Carbon7 min read

Arguing against demolition on carbon grounds

Embodied carbon is a material consideration in many authorities, but only a quantified option appraisal shifts a decision. How to build and test the comparison.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope