Articles – page 354

8725 articles
Project Type Guides7 min read

Data centre planning permission: site, power and cooling

A data centre application is decided on power, noise and water long before it is decided on architecture. Here is how each of those arguments is evidenced.

Read article →
Glossary6 min read

Housing mix: how councils set unit size policy

Housing mix policy sets the bedroom split a council expects on your site. It comes from a housing needs assessment, and departing from it takes site-specific evidence rather than a preference.

Read article →
Project Type Guides7 min read

Telecoms mast or rooftop antenna: the Part 16 route

Most mobile network development in England is permitted by Part 16 of the GPDO, subject to a 56 day prior approval on siting and appearance. Health objections carry no weight once an ICNIRP declaration is supplied.

Read article →
Council Guides7 min read

Bin storage requirements for flat conversions

Refuse storage is one of the most common reasons a flat conversion is refused or held up at validation. The standards sit in the council's waste guidance, not the local plan.

Read article →
Which Reports Do I Need6 min read

Which reports for a shop to restaurant change of use

A shop and a restaurant both sit in Class E, so the use change alone is not development. The application, when there is one, is about the extraction flue and what comes out of it.

Read article →
Glossary6 min read

Vacant building credit: the affordable housing offset

The vacant building credit deducts the floorspace of an existing vacant building from the affordable housing calculation. The fight is almost always about whether the building counts as vacant.

Read article →
Council Guides7 min read

Parking stress surveys: the Lambeth methodology explained

Councils asking for parking stress evidence usually mean an overnight beat survey run to the Lambeth methodology. Here is how the survey is set up, counted and presented.

Read article →
Council Guides7 min read

Council highway standards: access widths and visibility splays

A new access stands or falls on visibility. The X and Y dimensions come from measured speeds and local design guidance, and the splay land has to be within your control.

Read article →
Which Reports Do I Need7 min read

Which reports Class MA office to flats prior approval needs

A council can only refuse Class MA prior approval on the matters the Order lists. Evidence each one and the application is hard to refuse. Assert them and it is easy.

Read article →
Project Type Guides7 min read

Shopfront alterations and signage: the consents you need

Three regimes meet at a shopfront. Advertisement control considers only amenity and public safety, planning covers the physical alterations, and listed building consent is never deemed.

Read article →
Glossary7 min read

Residual land value: the arithmetic behind viability

Value of the finished scheme, less costs, less the developer's return, equals what the land can bear. The dispute is never about the formula, always about the inputs.

Read article →
Council Guides7 min read

Lead local flood authority comments on your drainage

Most holding objections from a lead local flood authority come from missing evidence, not unworkable engineering. Infiltration testing, calculations and exceedance routing clear the majority.

Read article →
Glossary6 min read

Fallback position in planning and the real prospect test

The fallback argument shifts the comparison from the existing situation to a lawful alternative. Its weight turns on whether that alternative has a real prospect of being implemented.

Read article →
Which Reports Do I Need7 min read

Reports for 12 homes on a greenfield village-edge site

Crossing ten units changes the determination period, the consultees and the affordable housing position. On a village edge the landscape and heritage evidence decides the rest.

Read article →
Project Type Guides6 min read

Mezzanine floors: when installation needs permission

Section 55(2A) makes a retail mezzanine over 200 square metres development in its own right. Any mezzanine needs permission where it amounts to a material change of use.

Read article →
Council Guides6 min read

Council ecologists and who checks your BNG submission

Biodiversity net gain submissions are reviewed by in-house or shared-service ecologists. The gain plan is approved after permission and before commencement, which is where programmes slip.

Read article →
Which Reports Do I Need7 min read

Reports for one new dwelling in Flood Zone 2

In Flood Zone 2 a dwelling is more vulnerable development and is appropriate, so the exception test does not apply. The work is the site-specific assessment, the sequential test and the drainage.

Read article →
Project Type Guides7 min read

Waste transfer station and scrapyard planning permission

Waste and metal recycling sites need permission from the waste planning authority and a permit from the Environment Agency. The permit does not answer the planning objections on dust, noise and amenity.

Read article →
Glossary6 min read

Enabling development: funding heritage repair with new build

Enabling development is an open departure from policy, granted to fund the repair of a heritage asset. It stands or falls on an evidenced conservation deficit and a quantum sized to it.

Read article →
Council Guides6 min read

Conservation officers: what they check and when

Conservation officers apply the statutory duties in sections 66 and 72 of the 1990 Act. Their consultation response usually sets the recommendation, and you can read what they said about your neighbours first.

Read article →
Which Reports Do I Need7 min read

Which reports a garden annexe for a parent needs

An annexe that is ancillary to the house is a householder application with a short document set. A separate dwelling brings CIL, biodiversity net gain and a full application.

Read article →
Project Type Guides7 min read

Self-storage and trade counter units: planning permission

Self-storage is normally Class B8, so the question is employment land policy and access. A trade counter is harder, because public sales can tip the use into retail.

Read article →
Glossary6 min read

Non-designated heritage assets and the local list

Local listing creates no new consent requirement. It creates a balanced judgement on the scale of harm against the asset's significance, and that judgement turns on the evidence you supply.

Read article →
Council Guides6 min read

Local government reorganisation and your planning application

A new unitary authority inherits several local plans, several validation lists and several design guides. The plan for your site is the one adopted by the predecessor district containing the land.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope