PlanScope Blog – Page 41
Practical guides to UK planning applications: which reports your council expects, permitted development, constraints, costs and how to prepare each document.
Articles – page 41
9572 articlesCan a drafted statement be used in a written reps appeal
A planning statement argues accordance with the plan. An appeal statement answers the council's stated reasons for refusal, in order, with evidence. They are not the same document.
Smoke control in basement car parks
A smoke extract shaft is vertical, large and cannot bend around a problem found later. Routes, grille positions and plant noise all belong on the planning drawings.
Rooflights and the daylight case for a loft conversion
Rooflights are usually permitted development where a dormer is not, and they light a loft room more evenly. Height, not light, is what forces a dormer.
Permeable paving and the front garden driveway rule
A new front driveway needs no permission at any size if the surface is porous or the rainwater drains to a border inside your boundary. The dropped kerb is a separate consent.
Scheduled monuments in the setting of a development site
Development can harm a scheduled monument without touching it. The test is the contribution the surroundings make to significance, and there is no distance threshold.
Planning permission for a dance school or studio
A dance studio application turns on impact noise through the building structure and where parents park at 5.30pm. The use class question is the easy part.
Air quality action plans and planning decisions
An air quality action plan explains why your application is being asked for charging points, a travel plan and a mitigation payment. Each link in that chain offers a different argument.
Drafted statements and the local validation checklist
A drafted statement answers a validation requirement only where the requirement asks for an argument. Most returned applications fail on forms, fees and certificates instead.
Second staircase requirements and the effect on layout
A second protected stair consumes area on every floor and reshapes the corridor. On a small floorplate it decides the unit mix, not just the core layout.
Student accommodation and internal daylight expectations
Study bedrooms are habitable rooms, and the argument that short tenure justifies less daylight rarely succeeds. The shared kitchen is where these applications are won or lost.
SuDS adoption: who maintains the basin in year twenty
Who maintains a detention basin two decades after the developer has gone is a planning question, settled by condition or obligation before permission is granted.
Challenging a flood zone boundary with site specific data
The Flood Map for Planning is catchment-scale modelling, and at plot scale it is often wrong by a few metres of ground level. A topographic survey is the quickest way to find out.
Prior approval determination periods and deemed consent
Several permitted development classes let you start work if the council fails to decide in time. The mechanism only works where the application was valid and every condition in the Class is met.
Pick your own farm planning: retail and field parking
Growing the crop is agriculture. Selling it to visitors and parking their cars in a field for a whole summer are not, and both need to be dealt with in the application.
Green belt reviews in the local plan process
Green Belt boundaries move only through the local plan, and only where exceptional circumstances are evidenced. The parcel assessment methodology decides more than the merits of any one field.
Ownership certificates are the part you cannot delegate
Everything else in an application can be drafted and reviewed. The ownership certificate is a statement of fact about title, tenancy and service of notice, and a false one is an offence.
Fire appliance access distances on a long private drive
Approved Document B expects a fire service pump appliance to reach within 45 metres of every point inside a house. On a long private drive that one figure controls the layout.
Single aspect flats facing a tall neighbouring building
Single aspect flats fail on daylight when a tall obstruction and a deep room plan combine. One of those you cannot change; the other is a design decision you control.
Ordinary watercourse consent from the flood authority
Works in, over or under an ordinary watercourse need written consent from the lead local flood authority under the Land Drainage Act 1991. Planning permission does not carry it.
Waste site safeguarding and the proximity principle
Waste local plans protect existing and allocated waste management capacity from incompatible neighbours. If you are proposing housing next to a permitted facility, the burden of showing no prejudice sits with you.
Class M shop to dwelling: the ground floor frontage test
Class M prior approval converts a small shop to a dwelling without a full application, but the council can still refuse on a closed list of matters. Loss of active frontage is the one landlords underestimate.
Planning permission for a farm education centre
Opening a working farm to school groups is a change of use, not agriculture. The application turns on coach access, welfare facilities sized for groups, and the hours you ask for.
Site allocations: what an allocation actually gives you
An allocation in an adopted local plan establishes that your site should be developed. It grants no permission, and the site-specific requirements attached to it are harder to negotiate away than most promoters expect.
Groundwater abstraction and development near a borehole
Abstraction licensing and private water supply regulation both sit outside planning. What a council can condition, how derogation claims arise, and why foul drainage separations decide most rural layouts.
Not sure which documents your council will ask for?
Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.
Enter your postcode on PlanScope