Articles – page 46

9564 articles
Project Type Guides8 min read

Planning permission for a micro-distillery

A micro-distillery is a Class B2 general industrial use. Vapour and odour control, spirit storage separation and plant noise are what decide the application.

Read article →
AI and Planning7 min read

Why word count is no measure of a planning statement

Nothing in validation sets a word count for a planning statement. Count the material considerations instead, give each one a section, and cut everything a drawing already shows.

Read article →
Neighbours, Objections and Community7 min read

Commenting on listed building consent next door

Listed building consent turns on the effect of works on special architectural or historic interest. Overlooking, light and parking belong in a comment on the planning application instead.

Read article →
Ecology, BNG and Protected Species7 min read

Spatial risk multipliers and where off-site BNG units sit

Off-site biodiversity units are discounted by the statutory metric according to where they sit. Cost per credited unit, not headline price, is what decides the right purchase.

Read article →
Permitted Development7 min read

The 50 per cent curtilage test on a subdivided plot

The coverage test limits buildings other than the original dwellinghouse to half the curtilage. Subdividing a plot shrinks the denominator permanently.

Read article →
Which Reports Do I Need7 min read

Reports needed on former industrial contaminated land

A former industrial site needs a Phase 1 desk study with the application, and a Phase 2 investigation where the conceptual site model identifies a plausible pollutant linkage.

Read article →
Project Type Guides8 min read

Planning permission for a model aircraft flying site

Regular club or commercial model aircraft and drone flying from open land is normally a material change of use. Noise and breeding birds decide most applications.

Read article →
AI and Planning7 min read

How a case officer reads your planning statement

A case officer reads your statement looking for sentences they can use in their own report. Structuring the document around the assessment headings is what gets your reasoning into the recommendation.

Read article →
Which Reports Do I Need7 min read

Which reports cover the setting of a listed building

Development affecting the setting of a listed building engages section 66 of the 1990 Act. Here is the document set that answers the duty, and when listed building consent is needed too.

Read article →
Neighbours, Objections and Community8 min read

Objecting to a dropped kerb or vehicle crossing

Vehicle crossings are authorised by the highway authority under the Highways Act 1980, not by planners. Here is where planning permission does apply and how to make a representation that lands.

Read article →
Ecology, BNG and Protected Species7 min read

The 30 January 2020 BNG baseline and degraded land

Where habitat was cleared after 30 January 2020 without the consent it needed, the biodiversity net gain baseline reverts to the value immediately before that clearance.

Read article →
Permitted Development8 min read

Converting an integral garage: do you need permission?

Most integral garage conversions need no planning permission. The thing that catches people out is a condition on the original permission requiring the garage to be kept for parking.

Read article →
Project Type Guides8 min read

Planning permission for an adventure golf course

Adventure golf needs planning permission as a sui generis leisure use. The application turns on themed structure heights, evening lighting, summer noise and peak parking.

Read article →
Project Type Guides6 min read

Mast planning permission in a conservation area

Designated land cuts back telecoms permitted development, so a mast in a conservation area often needs a full application. Here is the evidence that carries it and the design decisions that matter.

Read article →
Council Guides6 min read

Promoting land through a local plan call for sites

A call for sites is the point at which land can enter the local plan evidence base. Here is the information councils ask for, how the availability assessment screens sites, and how to follow one through examination.

Read article →
AI and Planning6 min read

How a draft should handle an unresolved policy conflict

A planning statement can identify a conflict between adopted policies, quote both accurately and set out the facts each one engages. It cannot decide which prevails, and a draft that pretends otherwise is worse than one that flags it.

Read article →
Neighbours, Objections and Community6 min read

Objecting to a short term let change of use

Letting a dwelling for short periods is not automatically a change of use. Whether permission is needed turns on intensity and character, and that is where an objection has to start.

Read article →
Permitted Development6 min read

What counts as the original house on a post-1948 build

On a modern estate the permitted development baseline is the house as first built, evidenced by the approved drawings rather than by a historic map. Here is how to establish it and what counts against the allowance.

Read article →
Which Reports Do I Need6 min read

Which reports a protected tree on the boundary needs

A protected tree on or near the boundary brings a defined set of documents: a BS 5837 survey, an impact assessment, a method statement and a tree protection plan. Here is what each one does.

Read article →
Project Type Guides6 min read

Pet crematorium planning permission and emissions rules

Animal cremation sits outside the Cremation Act siting rules but needs an environmental permit and an emissions case. Here is how the use is classified and what the council will ask for.

Read article →
Glossary6 min read

Crown development: planning applications by government bodies

Crown bodies lost planning immunity in 2006 and normally apply to the council like anyone else. Separate routes exist for urgent and nationally important development, where the Secretary of State decides.

Read article →
Council Guides6 min read

Local development orders and what they permit

Local development orders let a council grant permission in advance for specified development in a defined area. Here is how an order is made, what conditions it can carry and how to check whether one covers a site.

Read article →
AI and Planning6 min read

Swapping the policy framework for a devolved application

Policy sections written against the NPPF and English local plans have to be replaced rather than adjusted for Wales, Scotland and Northern Ireland. Here is what changes and who should check it.

Read article →
Neighbours, Objections and Community6 min read

Objecting to a battery energy storage scheme

Battery storage schemes are decided by the local planning authority in England whatever their capacity. The grounds that carry weight are fire safety management, tonal noise, firefighting water and restoration.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope