Articles – page 47

9561 articles
Project Type Guides6 min read

Mosque planning permission: domes, minarets and parking

A purpose-built place of worship is a Class F1 use, and the application is usually decided on parking and highway safety rather than on design. Here is how domes, minarets, ancillary teaching and sound are assessed.

Read article →
Glossary6 min read

Entry level exception sites and how they qualify

Entry level exception sites allow small unallocated sites next to a settlement to come forward for homes aimed at first time buyers. Here are the size and location limits and how the route differs from a rural exception site.

Read article →
AI and Planning6 min read

The limits of automatic planning constraint detection

An automatic constraint check is a fast first pass over national datasets. It cannot see setting, locally held designations or last week's tree preservation order, so every flag needs verifying against the source.

Read article →
Neighbours, Objections and Community6 min read

Objecting to a solar farm on agricultural land

National policy supports renewable generation, so an objection to a ground-mounted solar scheme has to work on land quality, landscape effect, glint and glare and cumulative impact. Here is what councils can act on.

Read article →
Permitted Development6 min read

Class AD: upward extension of a house to create new flats

Part 20 Class AD allows new flats to be built on top of a detached house built between 1 July 1948 and 5 March 2018, subject to prior approval. The date window and the height caps rule out most candidates before design begins.

Read article →
Comparisons6 min read

Part 16 prior approval for masts beside a full application

Telecoms development under Part 16 of the GPDO 2015 is determined on siting and appearance alone, within 56 days. Here is where that route stops and a full planning application takes over.

Read article →
Which Reports Do I Need6 min read

Which reports flats above a shop parade need

Converting upper floors above a retail parade turns on two issues: noise from the units below and a separate street access. Here is the document bundle councils expect, and the parts that belong to building control instead.

Read article →
Project Type Guides6 min read

Winery planning permission: production and tasting rooms

Turning grapes into wine is processing rather than agriculture, so a winery building usually needs a full planning application even on a large holding. Here is how the use, the tasting room, the effluent and the harvest peak are assessed.

Read article →
Glossary7 min read

Blight notice: forcing a public body to buy your home

Statutory blight lets qualifying owner-occupiers require a public body to buy land affected by a published scheme. Here is what the notice covers, who can serve one, and the grounds an authority uses to object.

Read article →
Project Type Guides9 min read

Shooting and archery range planning permission

Gunshot is an impulsive noise source and the danger area is a land take constraint. Here is how a range application is assessed and what conditions to expect.

Read article →
Glossary9 min read

Discharge of conditions: the application after permission

A discharge of conditions application approves the details a condition reserved for later. Here are the fee rules, the eight week period and the risk of starting early.

Read article →
Neighbours, Objections and Community9 min read

Objecting to a hot food takeaway near a school

Takeaways are sui generis so permission is always needed. Exclusion zone policies and odour are the grounds that work, and here is the evidence to gather.

Read article →
Comparisons9 min read

Agricultural prior notification or Class Q: the ten year bar

Building under Part 6 can block a Class Q barn conversion for ten years on the same agricultural unit. Here is how the two rights compare and how to sequence them.

Read article →
Project Type Guides9 min read

Cat cafe planning permission and animal hospitality uses

A cat cafe may stay within Class E or may be a separate use needing permission. Here is how the classification works and what the layout, odour and licensing require.

Read article →
Glossary9 min read

Nutrient neutrality: what the requirement means for a site

Nutrient neutrality requires a development to add no nitrogen or phosphorus load to a protected site. Here is the legal basis, the budget method and the mitigation routes.

Read article →
Council Guides8 min read

Infrastructure delivery plans and where contributions go

An infrastructure delivery plan lists every project the local plan depends on, its cost, who delivers it and the funding gap. Here is how to read one and use it.

Read article →
AI and Planning9 min read

Telling a templated planning statement from a real one

Officers spot a template in under a minute. Here are the signals, the sections that must carry site facts, and the seven edits that fix a generic draft.

Read article →
Neighbours, Objections and Community9 min read

Objecting to a telecoms mast: what actually counts

Most masts come forward under Part 16, where the council can only consider siting and appearance and has 56 days to decide. Here is how to object within that scope.

Read article →
Comparisons9 min read

Flood Zone 3a and 3b on the same site: what changes

The Flood Map for Planning does not show the 3a and 3b split. Here is how the functional floodplain is defined, what each zone permits and how to lay out a split site.

Read article →
Project Type Guides9 min read

Scrap metal yard planning permission and ELV sites

A scrapyard is sui generis and assessed against waste plan policy. Noise impulsivity, depollution containment and weighbridge queuing decide the application.

Read article →
Glossary9 min read

Brownfield land register: what inclusion actually means

A Part 1 brownfield register entry grants nothing. A Part 2 entry grants permission in principle for housing. Here is what each one does and where the route is closed.

Read article →
Council Guides9 min read

Planning committee site visits and how they work

A committee site visit is fact-finding, not a hearing. Here is who decides one happens, what members can and cannot do on site, and how to request one.

Read article →
AI and Planning8 min read

Why a draft cites a superseded local plan policy

Local plans replace each other and reuse the same policy codes for different subject matter. Here is how to check which document a policy number actually belongs to.

Read article →
Neighbours, Objections and Community9 min read

Ecology objections and what the council must consider

Ecology objections usually succeed on survey adequacy rather than ecological merit. Here are the duties on the authority and the evidence a neighbour can supply.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope