Articles – page 50

9557 articles
Neighbours, Objections and Community8 min read

How to request an EIA screening opinion

A screening opinion decides whether a scheme is EIA development. Third parties can ask for one, and the authority has three weeks to respond.

Read article →
AI and Planning8 min read

Candour with the council about an AI-assisted draft

Planning law has no duty to disclose drafting software. It does have consequences for inaccurate information, from rerun consultation to revocation.

Read article →
Daylight, Sunlight and Amenity8 min read

Classroom daylight and what school schemes must show

Planning assesses what a school block does to its neighbours' daylight. Classroom daylight is governed by the DfE output specification, BS EN 17037 and BREEAM.

Read article →
Energy, Sustainability and Carbon8 min read

Carbon obligations in a section 106: review and monitoring

Carbon clauses in a section 106 turn an energy strategy into a debt. Triggers, monitoring duties, tolerance bands and indexation decide what it actually costs.

Read article →
Comparisons7 min read

Resubmit or appeal after a planning refusal

A fresh application lets you change the scheme and may be fee exempt. An appeal defends the scheme as refused. The refusal reasons tell you which route fits.

Read article →
Costs, Fees and Budgeting7 min read

Phasing fees across outline and reserved matters

A two-stage consent means a fee at outline and a further fee for each reserved matters submission. How the arithmetic works and when a full application costs less.

Read article →
Project Type Guides8 min read

Planning permission for a dog exercise field for hire

Renting a field to dog owners by the hour is a material change of use. The fence height, barking noise and lane access decide whether it is approved.

Read article →
Glossary8 min read

Root protection area: how the BS 5837 radius is set

The root protection area is a radius of 12 times stem diameter, capped at 707 m2. How to measure it, reshape it defensibly and show it on the drawings.

Read article →
Costs, Fees and Budgeting7 min read

What a planning budget covers and what belongs in build cost

The planning budget is cash spent before you own a consent. Allocating surveys, fees and condition compliance correctly keeps the self-build mortgage drawdown and the planning spend apart.

Read article →
Project Type Guides7 min read

Consenting a betting shop or adult gaming centre

Betting offices and adult gaming centres sit outside the use classes, so an application is always required. Local clustering policy and frontage treatment decide the outcome.

Read article →
Glossary7 min read

Material operations and the moment development begins

Development begins on the earliest date a material operation listed in section 56(4) is carried out. An undischarged pre-commencement condition can defeat an otherwise valid start.

Read article →
Comparisons7 min read

Unilateral undertaking against a bilateral section 106 deed

Both instruments are made under section 106 and both bind the land. The difference is that a unilateral undertaking cannot contain any obligation on the authority.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting for the local validation checklist

Local validation requirements drive the cost of an application pack, not the national list. Price each triggered item as a named line before quoting, and challenge the items that cannot be material.

Read article →
Project Type Guides8 min read

Consenting a live music venue and the agent of change test

Live music venues are sui generis and the agent of change principle decides who bears the mitigation cost. Low frequency sound insulation and patron dispersal are what the case turns on.

Read article →
Which Reports Do I Need7 min read

Reports for a vertical farm in a warehouse

A controlled environment vertical farm in an existing warehouse needs permission, and the use class is unsettled. Grid capacity, light spill, plant noise and trade effluent drive the evidence.

Read article →
Council Guides7 min read

A council's statement of community involvement explained

Section 18 of the Planning and Compulsory Purchase Act 2004 requires every authority to publish a statement of community involvement. The statutory publicity minimum is a separate duty.

Read article →
Planning Law Updates7 min read

Grey belt and the golden rules for Green Belt release

The grey belt route gives a development management answer where a plan has not kept up, conditional on golden rules covering affordable housing, infrastructure and public green space.

Read article →
Neighbours, Objections and Community7 min read

Objecting on tree grounds and asking for a protection order

Asking for a Tree Preservation Order takes a letter and the right evidence. In a conservation area the six week notice under section 211 is the mechanism that actually saves trees.

Read article →
AI and Planning7 min read

Measuring whether a drafting tool saved time

Measure the whole cycle from instruction to a document you will sign, including verification and rework. Without a baseline from your own time records, there is nothing to compare.

Read article →
Daylight, Sunlight and Amenity7 min read

Temporary loss of light from scaffolding and hoardings

Temporary obstruction of light by scaffolding or a hoarding is not a planning matter. The controls sit in highway licences, construction management plans and private nuisance.

Read article →
Comparisons7 min read

Householder application against a full application

The householder category is defined by what you are proposing, not chosen. It carries a different fee, lighter validation and the 12 week expedited appeal route.

Read article →
Costs, Fees and Budgeting7 min read

Heritage budgeting: desk assessment against intrusive recording

Heritage spend splits between desk-based analysis and intrusive recording or evaluation. The recording level and the post-excavation assumption decide what the client actually pays.

Read article →
Project Type Guides8 min read

Consenting an anaerobic digestion plant on a farm

An on-farm anaerobic digestion plant needs planning permission and an environmental permit. Where the feedstock comes from and where the energy goes decides how the use is characterised.

Read article →
Which Reports Do I Need7 min read

Reports for a dental practice in a converted house

A house to dental surgery conversion needs full permission for a change of use from Class C3 to Class E(e). Parking demand and plant noise are what actually decide the application.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope