Articles – page 49

9559 articles
Costs, Fees and Budgeting7 min read

Budgeting a noise survey: duration, equipment and attended periods

Noise survey quotes diverge on duration, attended hours and whether modelling is included. How to write a brief that makes quotations comparable.

Read article →
Project Type Guides7 min read

Consenting a shisha lounge or outdoor smoking shelter

Smoke-free law needs open sides, amenity policy wants containment. How to resolve that in the drawings, and what the council will condition.

Read article →
Comparisons7 min read

Extension of time against a fresh application for a lapsing consent

Time limit conditions cannot be extended by application in England. What counts as a material operation, why condition precedents defeat token starts, and when to reapply instead.

Read article →
Glossary6 min read

Called-in applications under section 77

A call-in moves the decision from the council to the Secretary of State without a new application. The criteria, holding directions, the inquiry procedure and what it costs in time.

Read article →
Comparisons7 min read

Grampian condition against securing the same thing by obligation

Negative conditions cannot require money, land or rights, and obligations cannot bind a party who will not sign. How to pick the mechanism before the committee report does it for you.

Read article →
Glossary7 min read

Ancillary and incidental use distinguished

Incidental and ancillary are different planning tests doing different jobs. Where each applies to garden buildings, annexes, home working and farm shops, and when permission is needed.

Read article →
Neighbours, Objections and Community7 min read

Reserved matters: the second chance to comment

Outline permission fixes the principle, not the detail. Which of access, appearance, landscaping, layout and scale you can still influence, and when to write in.

Read article →
Comparisons7 min read

Retrospective application against appealing on ground (a)

Two ways to regularise unauthorised development, with sequencing traps in sections 70C and 174(2A). Which route to pick before and after an enforcement notice lands.

Read article →
Glossary7 min read

The planning unit and how it is identified

Materiality is judged against the planning unit, so the unit has to be fixed first. The three categories from Burdle, the occupation and separation tests, and the consequences for enforcement and certificates.

Read article →
AI and Planning7 min read

Drawings: the one thing a drafting tool cannot produce

A drafting tool can write the statement. It cannot measure your house. Which drawings a planning application needs, and the order to produce them in.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting an arboricultural package stage by stage

A tree package is four commissions at four points in a project. Commission the survey before the layout and the rest costs less.

Read article →
Glossary7 min read

Habitat distinctiveness in the biodiversity metric

Distinctiveness belongs to the habitat type, condition to the parcel. Get the classification wrong on the baseline and everything downstream is wrong too.

Read article →
Comparisons8 min read

Use class F1 against F2 and which applies to a hall

A hall can sit in F1 or F2 depending on who uses it. The classification decides what you can change without permission, and the bookings diary is the evidence.

Read article →
Neighbours, Objections and Community8 min read

Non-material amendments and the absence of consultation

A section 96A amendment changes approved plans with no site notice and no neighbour letters. How to find them and what the limits on them are.

Read article →
AI and Planning8 min read

Factual errors that recur in drafted flood sections

Drafted flood sections fail on inputs, not prose. The wrong map, the wrong vulnerability row and the wrong allowance band are the three that repeat.

Read article →
Comparisons8 min read

Class Q prior approval or a full barn conversion scheme

Class Q converts an agricultural building within defined limits and refusal grounds. A full application frees the design and reopens the countryside policy test.

Read article →
Costs, Fees and Budgeting8 min read

Budgeting a topographical survey and what to specify

A survey tied to Ordnance Datum and the national grid carries a scheme through planning, drainage and highway design. An arbitrary datum means paying twice.

Read article →
Project Type Guides8 min read

Planning permission for a go-kart or motorsport track

A karting or practice circuit stands or falls on noise character and the days of use offered. The 14 day temporary right supports a hobby, not a business.

Read article →
Glossary7 min read

Urban creep allowance in a drainage calculation

Urban creep adds an uplift to impermeable area for future paving and extensions. It sits alongside the climate change allowance, not instead of it.

Read article →
Neighbours, Objections and Community8 min read

Lobbying councillors on a planning application

Councillors may hold and express views on an application. Asking one to promise a vote is the fastest way to lose them from the committee.

Read article →
AI and Planning8 min read

Where drafting tools fit in an architect's fee structure

Design and access statements and planning statements usually sit inside a drawing fee. Naming them, pricing verification and excluding third party reports fixes that.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight standards and hotel bedrooms

Hotel bedrooms are transiently occupied Class C1 space, so residential daylight criteria do not transfer. Aparthotels are where the argument gets difficult.

Read article →
Comparisons8 min read

Judicial review or the statutory planning appeal route

A section 78 appeal asks whether a decision was wrong. Judicial review asks whether it was lawful. Who can use each, and what each can actually deliver.

Read article →
Costs, Fees and Budgeting8 min read

Budgeting biodiversity net gain: on-site or units

A net gain budget has four lines: on-site creation, 30 year management, off-site units and statutory credits. The structure transfers between schemes even when prices do not.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope