Articles – page 54

9549 articles
Flood, Drainage and SuDS7 min read

The residual risk section of a flood risk assessment

Residual risk is what remains once the mitigation is built and working. Breach, overtopping, blockage, exceedance and mechanical failure each need naming, quantifying and managing.

Read article →
Scenario Walkthroughs7 min read

Shop to dental practice within Class E: what needed permission

Moving from retail to a dental surgery stays inside Class E, so the use change needed no permission. The plant, shopfront and signage did. An illustrative walkthrough.

Read article →
Wales, Scotland and Northern Ireland7 min read

DAERA, environmental assessment and consents in Northern Ireland

DAERA advises councils on planning applications and separately licences discharges, abstraction and marine works. Here is how the two roles interact and how to sequence them.

Read article →
Energy, Sustainability and Carbon7 min read

Grid capacity and a rural renewable scheme

On a constrained network the connection offer tells you what scheme is worth applying for. Treating it as an engineering matter for after permission is how capacity gets wasted.

Read article →
Scenario Walkthroughs7 min read

Loft conversion on a terrace with a party wall

Three consent regimes ran on different clocks, and the party wall award rather than the planning permission set the start date. An illustrative walkthrough.

Read article →
Scenario Walkthroughs6 min read

A 12 unit scheme crossing the major development line

An illustrative walkthrough of a 12 dwelling scheme, showing what changes once the ten unit major threshold and the affordable housing policy threshold are crossed.

Read article →
Scenario Walkthroughs7 min read

Five dwellings on a brownfield infill plot

Below ten units nothing is major, so the exercise is proportionality. This illustrative walkthrough shows which parts of the evidence base a five dwelling scheme actually needed.

Read article →
Fire, Structural and Basements7 min read

Basement light wells, vaults and the public highway

Planning permission covers what shows. Sections 179 and 180 of the Highways Act 1980 cover the structure under the pavement, and neither answers who owns the ground.

Read article →
Daylight, Sunlight and Amenity7 min read

Conditions requiring design changes for daylight

A condition can secure glazing, layout and window changes within the approved envelope. It cannot require a materially different development, which is where performance conditions fail.

Read article →
AI and Planning7 min read

Checking an AI draft against the validation checklist

The local list published under Article 11 is the document an application is actually validated against. Map every item to a file, and remember that no drafting tool produces drawings.

Read article →
AI and Planning7 min read

Why an adopted local plan still has to be read in full

Section 38(6) makes the development plan the starting point, which means the supporting text, the policies map and the allocation requirements all count, not just the policy wording.

Read article →
Fire, Structural and Basements7 min read

Fire statement content: the matters Article 9A lists

The fire statement is a prescribed form, not a report you structure yourself. Here is what each matter needs at planning stage, and what belongs in the later strategy.

Read article →
Fire, Structural and Basements7 min read

Fire safety strategy and fire statement: which one when

A fire statement shows fire safety has shaped the proposal while the layout can still change. A BS 9991 strategy shows how the building complies with Part B. They are not interchangeable.

Read article →
Daylight, Sunlight and Amenity7 min read

Roof terraces and the overlooking objection

Part 1 rights apply to dwellinghouses, not flats, so a roof terrace on a flat is always a full application decided on overlooking, noise and appearance.

Read article →
Daylight, Sunlight and Amenity7 min read

Dormers and daylight to the neighbour's rear elevation

The geometry of a roof addition means the daylight effect on a neighbour is usually small while the overlooking effect is not. The two need entirely different evidence.

Read article →
Householder Extensions and Conversions7 min read

Light wells, front gardens and basement conversions

The excavation is often invisible in planning terms while the light well changes the front elevation. Here is how the two are assessed, and where party wall and drainage duties bite.

Read article →
Householder Extensions and Conversions7 min read

Outbuilding eaves heights and the boundary rule

The 2.5 metre boundary cap and the 2.5 metre eaves limit are different rules that apply together. Both are measured from the highest adjacent ground, which is where garden rooms go wrong.

Read article →
Householder Extensions and Conversions7 min read

Raising the ridge for loft head height

Class B does not permit an enlargement above the highest part of the existing roof, so any ridge lift is a full application. Check the head height numbers before you commit to one.

Read article →
Wales, Scotland and Northern Ireland7 min read

Northern Ireland planning agreements: Article 40 to s76

Northern Ireland still calls them Article 40 agreements, but the live power is section 76 of the 2011 Act. With no levy in the jurisdiction, every contribution has to be justified on its own facts.

Read article →
Wales, Scotland and Northern Ireland7 min read

Scotland: SEPA, flood risk and the drainage evidence

SEPA advises on flood risk using likelihood bands and a vulnerability classification rather than flood zones, and Scotland requires SuDS by legislation rather than policy.

Read article →
Wales, Scotland and Northern Ireland7 min read

Scotland: scheduled monument consent in practice

Scheduled monument consent is separate from planning permission, granted by Scottish Ministers through Historic Environment Scotland, and working without it is a criminal offence.

Read article →
Wales, Scotland and Northern Ireland7 min read

Scotland: section 75 obligations and how they differ

The Scottish planning obligation is registered against the title, can be modified or discharged through a statutory procedure, and carries the whole contribution load because Scotland has no levy.

Read article →
Wales, Scotland and Northern Ireland6 min read

Scotland: processing agreements and what they buy

A processing agreement is a written project plan between applicant and Scottish planning authority. It buys programme certainty and visibility, not a favourable decision.

Read article →
Viability, Obligations and Commercial6 min read

CIL liability notices and who actually pays the levy

If nobody assumes liability for the Community Infrastructure Levy, it apportions to the owners of the land. The notice sequence, the deadlines and the exemptions that have to be claimed.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope