Articles – page 55

9547 articles
Householder Extensions and Conversions7 min read

Annexes and the ancillary use test

Planning does not care who lives in an annexe. It asks whether the accommodation is ancillary to the house or a separate planning unit, and the answer changes everything about the application.

Read article →
Householder Extensions and Conversions8 min read

Roof terraces on a rear extension and overlooking

Balconies, verandas and raised platforms are excluded from Class A, so any roof terrace on a rear extension is a full application. Here is how overlooking is assessed and what mitigation works.

Read article →
Scenario Walkthroughs8 min read

Rear extension on a 1930s semi in a conservation area

An illustrative walkthrough of a single storey rear extension in a conservation area, including the article 4 direction that actually removed the permitted development right.

Read article →
Wales, Scotland and Northern Ireland8 min read

Scotland: pre-application consultation duties

For Scottish national and major developments, consultation is a statutory duty with a 12 week minimum notice period. What the notice, the event and the report must cover.

Read article →
Householder Extensions and Conversions8 min read

L shaped dormers on a terrace: what Class B allows

An L shaped dormer is one enlargement across two roof planes. Whether the 20 centimetre set back applies to the lower limb depends on whether the back addition is original.

Read article →
Daylight, Sunlight and Amenity7 min read

Outlook and why it is not the same as daylight

Outlook is about how enclosed a room feels. The content of what you used to look at is not protected. Why the distinction decides how an objection is treated.

Read article →
Energy, Sustainability and Carbon7 min read

BREEAM energy credits and the condition that secures them

A condition requiring a certified rating is really a condition requiring the low carbon specification to survive value engineering. How to set it up so it does.

Read article →
Trees and Arboriculture7 min read

Woodland and area Tree Preservation Orders compared

The difference between an area and a woodland designation is time. One is a snapshot of what stood there; the other covers everything that grows afterwards.

Read article →
Wales, Scotland and Northern Ireland7 min read

Wales: the C5 and C6 use classes for second homes

Since October 2022 Wales has separate use classes for second homes and short-term lets. What that means for buying, switching letting models and proving an existing use.

Read article →
Householder Extensions and Conversions8 min read

Rear dormer proportions and the 20cm eaves set back

The 20 centimetre set back is measured along the roof slope from the original eaves, and it changes the dormer's proportions and the headroom at the back wall.

Read article →
AI and Planning8 min read

Professional indemnity and AI-assisted planning documents

The cover and the duty are unchanged: reasonable skill and care in providing professional services. What changes is what insurers ask at renewal and what your files must show.

Read article →
Fire, Structural and Basements8 min read

Piling near a railway, tunnel or sewer: asset protection

The asset owner's consent sits outside the planning permission. What triggers a separate process, what the agreement covers, and why it is usually the critical path.

Read article →
Daylight, Sunlight and Amenity7 min read

Sunlight to gardens in a back-land terrace scheme

Orientation decides most back land schemes. The equinox shadow geometry, why the existing boundary condition is your best evidence, and when single storey is the only answer.

Read article →
Wales, Scotland and Northern Ireland7 min read

Wales: phosphate limits on rivers and what they stop

Where a Welsh site drains to a river SAC failing its phosphorus targets, the authority cannot conclude there is no adverse effect. The drainage routes that let a scheme proceed.

Read article →
Energy, Sustainability and Carbon8 min read

Energy statements for a major refurbishment

A refurbishment energy statement has a real baseline and a constrained set of measures. How to establish both, and how to set up the demolition comparator honestly.

Read article →
Trees and Arboriculture7 min read

Trees protected by a planning condition, not an Order

Felling a tree under a Tree Preservation Order is an offence. Felling one a condition required you to keep is a breach that can put the whole development outside its permission.

Read article →
Transport, Highways and Parking7 min read

Mobility hubs and shared transport secured by condition

A condition can require the bays and the power supply. It cannot fund an operator or make a car club viable. How to split the commitment so the scheme survives withdrawal.

Read article →
Householder Extensions and Conversions8 min read

Hip to gable loft conversions and the 50 cubic metre limit

Class B allows 40 cubic metres on a terrace house and 50 otherwise, measured against the original roof. Filling one hip end takes a large share of it.

Read article →
AI and Planning7 min read

Can an AI-drafted planning statement be submitted as is

The drafting method does not shift responsibility. Whoever signs the application form owns every fact in the pack, and the ownership certificate carries criminal liability.

Read article →
Fire, Structural and Basements8 min read

Retaining an existing frame: the retrofit appraisal

Where a plan expects reuse before demolition, the appraisal has to quantify capacity, condition and adaptability, and use the same assumptions as the carbon assessment.

Read article →
Daylight, Sunlight and Amenity7 min read

Window mapping: which neighbouring rooms actually count

Before any vertical sky component is calculated, someone decides which rooms are assessed. How that mapping is done, sourced and recorded so it survives scrutiny.

Read article →
Energy, Sustainability and Carbon8 min read

The energy hierarchy applied to a single self-build

One house does not need a major scheme's carbon modelling. What the local validation list actually asks for, and how to answer it in two or three pages.

Read article →
Noise, Air, Odour and Light7 min read

Statutory nuisance and why permission is no defence

Part III of the Environmental Protection Act 1990 contains no defence of holding planning permission. How abatement notices work, and what best practicable means requires of an operator.

Read article →
Trees and Arboriculture8 min read

Development under a canopy and future pressure to fell

The future pressure to fell argument refuses layouts where dwellings sit too close to retained trees. What the shading evidence has to show and how separation is designed in.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope