Articles – page 86

9492 articles
Scenario Walkthroughs7 min read

Walkthrough: a listed farmhouse extension and consent

An illustrative run through a Grade II farmhouse extension, from the list entry and statement of significance to curtilage structures, bats in the roof and the two applications.

Read article →
Refusals and Appeals7 min read

Reviewing and appealing a CIL liability notice

Community Infrastructure Levy liability has its own review and appeal routes with fixed statutory deadlines and two different decision makers. Starting work closes most of them.

Read article →
London6 min read

Waste capacity and borough apportionment in London

Policy SI 8 of the London Plan 2021 safeguards existing waste sites and apportions tonnage to each borough. Losing capacity means replacing it, measured at maximum throughput.

Read article →
Costs, Fees and Budgeting6 min read

Planning fees for new dwellings and the per unit bands

The fee for creating dwellings is charged per unit to a band boundary, then at a lower rate with an overall cap. Outline applications are charged on site area instead.

Read article →
Report Deep Dives7 min read

Air quality evidence when a school is the only receptor

Schools are high sensitivity receptors for nitrogen dioxide and particulates. Receptor height, exposure period and the split between construction dust and operational modelling decide whether the assessment holds up.

Read article →
Householder Extensions and Conversions7 min read

Loft conversion using rooflights only: what the rules allow

Class C of the GPDO permits rooflights in a dwellinghouse roof where they project no more than 150 millimetres beyond the original slope. Here is how that interacts with head height, stairs, fire escape and conservation areas.

Read article →
London7 min read

The Thames Policy Area and riverside development

The constraints on a Thames-side site are knowable before anyone draws a plan. River prospects, wharf safeguarding, the raised defence level and the river works licence.

Read article →
Refusals and Appeals7 min read

Part allowed appeals and split decisions explained

Most descriptions of development are drafted as one indivisible proposal, which limits the inspector to all or nothing. How to keep elements severable, and how costs work.

Read article →
Report Deep Dives7 min read

Odour evidence for a bakery in a mixed use block

Establish the flue route before designing the system. Why 4am baking changes the assessment, and why a carbon filter with no replacement schedule stops working within a year.

Read article →
Householder Extensions and Conversions7 min read

An annexe for a dependent relative and its conditions

Separate metered supplies, a separate gate and a fenced garden turn an annexe into a second dwelling. What to show on the plans, and which condition wording to ask for.

Read article →
Permitted Development7 min read

Part 11 demolition: what the prior approval decides

The determination is narrow: method and restoration, nothing else. What belongs in the method statement, why conservation areas are outside it, and the 28 day silence rule.

Read article →
Noise, Air, Odour and Light7 min read

Nitrogen deposition on habitats from changed traffic flows

Most sensitive habitats are already above their critical load, so the question is whether your scheme's contribution matters. The screening route and the in-combination trap.

Read article →
Daylight, Sunlight and Amenity6 min read

Daylight baseline choice when the site is already cleared

Open sky as a baseline makes almost any building look harmful. The demolished building makes it look benign. Report the primary baseline and label every alternative.

Read article →
Energy, Sustainability and Carbon7 min read

Electricity grid capacity and when it stops a scheme

Capacity is a deliverability problem, not a policy objection. What to ask the network operator, how to read an offer, and how phasing conditions should be drafted.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a self build house on a brownfield paddock

Land last used for agriculture is not previously developed land, whatever the hardstanding suggests. An illustrative walkthrough through the history research, ecology, drainage and access.

Read article →
London7 min read

Protected London squares under the 1931 Act

Planning permission does not authorise what the 1931 Act prohibits. What the schedules protect, the use and structure restriction, and the four consent regimes that overlap.

Read article →
Refusals and Appeals6 min read

Refused for being outside the settlement boundary

Two different arguments answer a boundary refusal: no conflict, or conflict outweighed. The evidence each needs, and why isolated does not mean outside the boundary.

Read article →
Report Deep Dives7 min read

Ecology evidence for a redundant barn surveyed in winter

A winter roost assessment establishes suitability and field signs but cannot establish absence. How to report the limitation, and when a deferral condition is wrong.

Read article →
Householder Extensions and Conversions7 min read

Garden rooms as home offices and the incidental use limit

Class E allows buildings incidental to the enjoyment of a dwellinghouse. Where a home office crosses into a separate use, and the height and boundary limits that catch most garden rooms.

Read article →
Permitted Development7 min read

New flats above commercial premises under Part 20

The upward extension right is real but narrow. Age limits, three separate height controls and a long list of prior approval matters decide most sites before design starts.

Read article →
Noise, Air, Odour and Light7 min read

Biomass and solid fuel in a smoke control area

The Clean Air Act and planning are separate controls, and you can satisfy one while breaching the other. What exempt listings actually say, and where flue height rules bite.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight to inset balconies and the overhang problem

Balconies are the daylight input most often left out of the model. Why the slab above a window matters more than a building across the street, and what recovers the light.

Read article →
Energy, Sustainability and Carbon7 min read

Heat network priority areas and what they oblige

Priority areas are a planning expectation; zoning under the Energy Act 2023 is a duty. The difference decides what evidence a major application has to carry.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a shop converted to two flats above and below

An illustrative mixed use conversion, followed from the frontage policy through the space standards and the daylight and noise evidence to the conditions on the decision notice.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope