Glossary articles – page 16

481 articles
Glossary7 min read

Extension of time agreements on a planning application

An extension of time moves one date and one right. Whether to agree depends almost entirely on whether the officer is heading towards an approval.

Read article →
Glossary7 min read

Non-material amendment: the section 96A power explained

Section 96A lets a council edit a permission you already hold rather than grant a new one. Here is what it can change, how materiality is judged, and the changes it will never cover.

Read article →
Glossary7 min read

Best and most versatile agricultural land explained

Grades 1, 2 and 3a of the Agricultural Land Classification are best and most versatile. Provisional mapping does not separate 3a from 3b, so the answer for a real site comes from a survey.

Read article →
Glossary7 min read

Openness of the Green Belt: what the test actually means

Green Belt policy protects openness, which means freedom from built development rather than landscape quality. The assessment has spatial and visual dimensions, and duration and activity both count.

Read article →
Glossary7 min read

Sui generis use: what falls outside the Use Classes Order

Pubs, hot food takeaways, nightclubs and petrol stations sit outside every class of the Use Classes Order. That means no class freedom, almost no permitted development, and an application for nearly every change.

Read article →
Glossary7 min read

Original dwellinghouse: the 1948 baseline for extensions

The GPDO measures every householder permitted development allowance from the original dwellinghouse, not the house as it stands today. That baseline is fixed at 1 July 1948, or the date of construction if later.

Read article →
Glossary8 min read

Reserved matters: scope, timing and common refusals

What can and cannot be reserved under the DMPO 2015, the section 92 deadlines that end an outline permission, and the layout and landscaping failures that stall approval.

Read article →
Glossary7 min read

Local land charges and how obligations appear on title

Section 106 obligations, enforcement notices and Article 4 directions all appear on the local land charges register. Planning conditions generally do not, which is where sales come unstuck.

Read article →
Glossary7 min read

Windfall sites and how allowances are justified

Councils may count future windfall sites in their housing supply only where the evidence is strong enough. What that evidence looks like, and where inflated allowances fall down.

Read article →
Glossary7 min read

Deemed discharge of planning conditions under section 74A

Section 74A lets you treat details as approved when a council fails to determine a discharge application. Why the exclusions swallow the rule, and what to do instead.

Read article →
Glossary8 min read

Section 96A non-material amendments and their limits

Section 96A lets a council amend an existing planning permission without granting a new one. What it covers, what it will not stretch to, and how it differs from a section 73 variation.

Read article →
Glossary6 min read

The development plan: what counts and what does not

Supplementary guidance, national policy and emerging drafts are not part of the development plan. What section 38 actually includes, and how weight is decided.

Read article →
Glossary6 min read

Openness of the Green Belt and how it is assessed

Screening a building behind planting deals with visual impact and does nothing for openness. How inspectors assess spatial and visual openness, and what to measure.

Read article →
Glossary7 min read

Grampian conditions: what they are and their limits

Negatively worded conditions let a council grant permission where the fix sits on someone else's land. The limit is deliverability, and the drafting has to be exact.

Read article →
Glossary6 min read

Third party rights in planning: what neighbours can and cannot do

Objecting is a right to be heard, not a veto. Here is what the consultation period gives you, why only applicants can appeal, and which disputes planning never decides.

Read article →
Glossary7 min read

Statement of common ground: what to agree before an appeal

A statement of common ground fixes the uncontested facts before an appeal so the inquiry can deal with the real dispute. Here is what belongs in it, what does not, and when to draft it.

Read article →
Glossary6 min read

Vertical sky component: the BRE 209 daylight test explained

VSC measures visible sky at the window plane, not light in the room. Here is how the two-part test works, when the 25 degree line settles it, and how to report results.

Read article →
Glossary6 min read

Be Lean, Be Clean, Be Green, Be Seen: the energy hierarchy

Three design stages and one reporting duty. Here is what each stage of the London energy hierarchy has to show, and why Be Seen changes how the assessment is written.

Read article →
Glossary6 min read

Embodied carbon and the lifecycle modules from A1 to D

Embodied carbon is fixed by early design decisions and no future grid improvement recovers it. Here are the lifecycle modules, the upfront figure and the reporting rules.

Read article →
Glossary7 min read

CIBSE TM59 overheating: the test, criteria and weather files

TM59 assesses overheating in homes by dynamic thermal modelling against two fixed criteria. Here is what it tests, how Part O differs, and why the weather file matters.

Read article →
Glossary6 min read

Active travel and the walking and cycling isochrone

An isochrone maps what is reachable on foot or by bike in a given time along the real network. Drawn honestly it supports a scheme; drawn as a circle it invites an objection.

Read article →
Glossary6 min read

Parking stress: how the percentage is calculated

Parking stress is parked vehicles divided by kerbside capacity, expressed as a percentage. The arguments are almost always about what counts as capacity, not about the arithmetic.

Read article →
Glossary6 min read

Trip generation and trip distribution: the two steps

Trip generation counts how many journeys a development produces. Distribution decides where they go. The two steps are assessed separately and challenged for different reasons.

Read article →
Glossary6 min read

First Homes: the discount market tenure explained

First Homes are sold at a discount of at least 30 per cent to market value, with the discount locked to the property in perpetuity by a section 106 restriction rather than held by the buyer.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope