Articles – page 128

9414 articles
Templates, Checklists and Examples6 min read

Worked example: BS 4142 rating level arithmetic

Rating level minus background is the number a BS 4142 assessment turns on. This illustrative worked example shows how each quantity is derived and how mitigation at source changes the answer.

Read article →
Report Deep Dives6 min read

The deposit model in an archaeological desk-based assessment

The deposit model answers the question a planning archaeologist actually asks: at what depth and in what condition would remains survive here. Here is how it is built and how it should conclude.

Read article →
Which Reports Do I Need6 min read

Reserved matters submissions and the reports that return

A reserved matters application resolves what the outline left open and refreshes what has gone out of date. Here is which reports return, which can be carried over, and how to show it.

Read article →
Glossary6 min read

Tailpiece conditions and why they are unlawful

A condition that lets the authority approve something materially different from the permission, by correspondence and without publicity, is unlawful. Here is how to spot one and what to do about it.

Read article →
Professionals and Qualifications6 min read

Who signs the ownership certificates on an application

The applicant or their agent signs the ownership certificate, and the signature is a statement of fact. Here is what it warrants, who counts as an owner, and what to do when it is wrong.

Read article →
Viability, Obligations and Commercial6 min read

Ground rents, service charges and the value input

Ground rent income has largely gone from new long leases, and service charges quietly reduce the sales values an appraisal rests on. Both sit on the value side and both are easy to get wrong.

Read article →
Energy, Sustainability and Carbon6 min read

The notional building and why baselines confuse officers

Energy statements are measured against a notional building generated from the regulations. State which edition, which metric and which scope, or the percentage you quote cannot be compared with anything.

Read article →
Commercial Occupiers6 min read

A pharmacy next door to a surgery

Dispensing premises sit inside Class E, so most pharmacy conversions need no planning application. The exceptions are conditions, Article 4 areas, sui generis units, shopfronts and signage.

Read article →
Templates, Checklists and Examples6 min read

Worked example: parking stress survey arithmetic

Parking stress is occupancy divided by kerbside capacity. This illustrative worked example shows the deductions, the 5.5 metre module, the survey timing and how the final percentage is read.

Read article →
Report Deep Dives6 min read

Damage cost calculations in an air quality assessment

The damage cost approach converts a development's extra emissions into a contribution towards air quality measures. Here is the arithmetic, the inputs that move it, and how to test the result.

Read article →
Which Reports Do I Need6 min read

Hybrid applications and which reports cover which part

A hybrid application grants detailed permission for one part of a site and outline for the rest. Here is which reports cover the whole site, which cover only the detailed part, and how to avoid a validation refusal.

Read article →
Glossary6 min read

Windfall sites and the housing supply calculation

Authorities may count an allowance for unidentified sites in their housing land supply, but only on compelling evidence. Here is what that evidence has to show and where it usually fails.

Read article →
Professionals and Qualifications6 min read

Independent audit of a basement impact assessment

Where a council has an adopted basement policy, it appoints an independent auditor to review your assessment and recharges the fee. Here is what the auditor checks and how to get through it in one round.

Read article →
Viability, Obligations and Commercial6 min read

Residual valuation against comparable land transactions

A residual appraisal works backwards from the finished scheme; comparables work from what land sold for. The gap between them is usually policy, and national guidance says which one wins.

Read article →
Energy, Sustainability and Carbon6 min read

Battery storage alongside a solar scheme

Electricity storage is determined locally whatever its capacity. Co-locating it with solar changes the application in four places: fire safety, night-time noise, compound layout and decommissioning.

Read article →
Commercial Occupiers6 min read

Vehicle repair and MOT premises: class, noise and permits

A repair workshop or MOT bay normally needs planning permission for a Class B2 use, and a spray booth needs an environmental permit on top. Here is what each one assesses.

Read article →
Templates, Checklists and Examples6 min read

Checklist: what a lead local flood authority asks for

Lead local flood authorities are statutory consultees on surface water drainage for major development. Here is the information they expect, and the gaps that produce a holding objection.

Read article →
Costs, Fees and Budgeting7 min read

Land Registry and title costs a planning project triggers

Ownership certificates A to D decide who has to be told about your application. The searches behind them cost a few pounds; discovering a covenant or a missing easement after permission costs far more.

Read article →
Report Deep Dives7 min read

The construction noise and vibration chapter

A construction noise and vibration chapter predicts levels from real plant data, judges them against a stated threshold method and sets out mitigation an officer can condition. Here is how each part works.

Read article →
Which Reports Do I Need6 min read

What an 18 metre building height adds to a submission

Crossing 18 metres or seven storeys with a residential building engages Planning Gateway One and a Fire Statement. Here is how the height is measured and what else the application has to carry.

Read article →
Glossary7 min read

Conditions you must discharge before work starts

Pre-commencement conditions stop a permission being implemented until the authority approves the details. Here is how to spot them, how long discharge takes and how to keep the programme intact.

Read article →
Glossary8 min read

Material change of use: the test and the evidence

Section 55 gives no threshold for materiality. The method is to fix the planning unit, describe the character of each use and ask whether the difference matters in planning terms.

Read article →
Professionals and Qualifications7 min read

What suitably qualified means for an air quality assessment

Credentials are not the test environmental health officers apply first. Verification against local monitoring data is, and an unverified model gets the report returned.

Read article →
Viability, Obligations and Commercial7 min read

Grant assumptions and registered provider bids

Whether a viability appraisal assumes grant changes the affordable housing offer. The additionality rule, how to brief registered providers and what the reviewer reads.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope