Articles – page 129

9413 articles
Energy, Sustainability and Carbon7 min read

Roof mounted solar on agricultural buildings

Part 14 Class J usually answers the planning question for a farm roof array. The 0.2 metre projection limit, the structural check, the grid offer and glint matter more.

Read article →
Commercial Occupiers7 min read

An off licence or vape shop: planning and licensing together

Two regimes, two tests. Class E usually answers the planning question, while the Licensing Act 2003 answers a different one, and the hours they grant need not match.

Read article →
Templates, Checklists and Examples7 min read

Section outline: planning statement for a change of use

A change of use statement has to establish the lawful existing use before it argues anything else. Seven sections in the order a case officer reads them.

Read article →
Costs, Fees and Budgeting7 min read

Commuted sums, bonds and deposits across planning consents

Financial guarantees in planning live in section 106 obligations and highway agreements, not in conditions. Where each one is lawful, how it is valued and how to get it released.

Read article →
Which Reports Do I Need7 min read

What crossing half a hectare changes on a small site

The 0.5 hectare limb of the major development definition only engages when the number of dwellings is unknown. Everything turns on the red line and the unit count.

Read article →
Glossary6 min read

Habitable room: the definition amenity tests turn on

There is no single habitable room definition in planning. Which one applies depends on the test, and kitchens, studies and third bedrooms are where they part company.

Read article →
Neighbours, Objections and Community7 min read

Objecting effectively on overlooking and loss of privacy

Loss of privacy is a material consideration, but only a measured objection gives the case officer something to write down. Where to measure, what to cite and what to ask for.

Read article →
Professionals and Qualifications7 min read

Daylight and sunlight assessment: who is competent to do it

BRE 209 accredits nobody, so judging competence falls to whoever appoints. What separates modelling skill from interpretation, and the questions to ask first.

Read article →
Viability, Obligations and Commercial8 min read

Contingency allowances and where reviewers push back

Reviewers rarely challenge whether a viability appraisal needs contingency. They challenge whether the same risk has been paid for twice, in profit, in abnormals or in the build rate.

Read article →
Fire, Structural and Basements7 min read

Educational accommodation and the Gateway One dwelling count

Counting bedrooms is the wrong test for a student block. Article 9A's educational accommodation limb has no numerical threshold, so the scale test decides it.

Read article →
Daylight, Sunlight and Amenity7 min read

Modelled daylight results compared with hand calculation

Vertical sky component and no sky line can be verified by a case officer. Climate based daylight modelling describes rooms better but relies on assumptions only the modeller can see.

Read article →
Energy, Sustainability and Carbon7 min read

BREEAM credits that planning conditions usually target

A BREEAM condition names a rating, not credits. The credits that decide whether you hit it are energy, water, materials, waste, surface water and ecology.

Read article →
Commercial Occupiers7 min read

A barber shop or nail bar in a small unit

Moving a barber shop or nail bar into a former Class E shop rarely needs planning permission. The extract scheme, shopfront, signage and separate registration regimes are another matter.

Read article →
Costs, Fees and Budgeting7 min read

The cost of a scoping opinion you never use

Abortive survey spend usually comes from buying evidence before the question it answers is settled. A sequencing order, a note on survey currency and what carries over to a revised scheme.

Read article →
Templates, Checklists and Examples7 min read

Checklist: evidence for a section 191 certificate on a use

A certificate of lawfulness for an existing use is won on evidence you supply. The categories that count, how to draft a statutory declaration and how to deal with gaps in the record.

Read article →
Comparisons7 min read

Felling licence or tree preservation order consent

A Forestry Act felling licence and consent under a tree preservation order cover different trees for different reasons. Which applies, where they meet and what happens if you get it wrong.

Read article →
Which Reports Do I Need7 min read

What crossing 1,000 square metres of floorspace changes

Additional floorspace of 1,000 m2 or more makes a non-residential scheme major development. That reclassification, rather than the floorspace itself, drives most of the extra evidence.

Read article →
Glossary7 min read

Design sulfate class and why buried concrete depends on it

A design sulfate class turns soil and groundwater sampling into a concrete specification for foundations and buried drainage. Here is how the classification is built and why made ground changes it.

Read article →
Costs, Fees and Budgeting7 min read

Battery storage grid connection and planning programme

A planning permission lasts three years and section 73 cannot extend it. Where the connection date sits further out, the implementation period has to be negotiated when permission is granted.

Read article →
Costs, Fees and Budgeting7 min read

Cold store costs a planner should anticipate

A cold store runs plant round the clock and draws a process load no regulated carbon calculation captures. Those two facts drive most of the extra evidence cost.

Read article →
Energy, Sustainability and Carbon7 min read

Future Homes Standard transition on a small site

A three plot site can end up with one house on the old standard and two on the new one, because the transitional test is when work started on each individual building.

Read article →
Viability, Obligations and Commercial7 min read

Sales rates and absorption in a residual appraisal

Two appraisals of the same site can diverge sharply on absorption alone, because a slower sales programme extends the cashflow, raises peak debt and compounds finance cost.

Read article →
Fire, Structural and Basements7 min read

Secure information boxes and premises information at planning

The box is an operational duty on the responsible person, but its position lands on a composed entrance elevation, so it belongs on the planning drawings from the start.

Read article →
Viability, Obligations and Commercial7 min read

Health and education contributions and how they are evidenced

Education contributions are arithmetic you can check: yield times cost per place, less spare capacity. Health requests often have no identified project, which is where regulation 122 bites.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope